module 4
問題一覧
1
due to ordinary unfavorable weather condition
2
15 cal. days from the date of written notice from the contractor to the DE/RD/consultant or equivalent official
3
45 days
4
suspension of work along the parallel activities
5
in case of total suspension of activities along the critical path which is not due to the fault of the contractor
6
monitoring
7
time,cost,performance
8
none of the above
9
construction project logbook
10
site instruction-for non-compliance with contract specifications
11
minutes of meeting
12
more resources or less have been used than planned. Activities are taking longer than planned
13
project and contract management application
14
pert/cpm network diagram
15
none of the above
16
contract time
17
accomplishment done ahead of its predecessor
18
Variation Order with Time Extension
19
25-50-25
20
Program Evaluation Review Technique/Critical Path Method
21
Contractor
22
9184
23
Float
24
Basis for Billings
25
20 and 50
26
50 and 70
27
quantity control
28
equipment utilization schedule
29
5 proj costing above 250m and 15 proj costing 250m and below
30
as built plan
31
95%
32
quality control
33
project documents
34
site instruction
35
10 proj implemented simultaneously do not exceed 100m php
36
contract docs
37
none of the above
38
none of the above
39
as staked survey/site layout survey is an activity necessary to verify the actual field condition and to identify modifications and other deviations in the project
40
none of the above
41
30
42
none of the above
43
none of the above
44
none of the above
45
written request for inspection
46
Dpwh PE
47
dpwh me
48
inspection
49
photographs for progress billing
50
99 s. 2016
51
D.O. no. 133, series of 2015
52
216 s. 2000
53
do 171 s. 2022
54
do42s2020
55
do192s2016
56
do60s2017
57
do55s2020
58
do90s2020
59
do46s2022
module 2
module 2
Wilson Angelo Oraza · 259問 · 2年前module 2
module 2
259問 • 2年前module 3
module 3
Wilson Angelo Oraza · 107問 · 2年前module 3
module 3
107問 • 2年前item #
item #
Wilson Angelo Oraza · 25問 · 2年前item #
item #
25問 • 2年前compre set 1
compre set 1
Wilson Angelo Oraza · 100問 · 2年前compre set 1
compre set 1
100問 • 2年前compre set 3
compre set 3
Wilson Angelo Oraza · 100問 · 2年前compre set 3
compre set 3
100問 • 2年前compre set 4
compre set 4
Wilson Angelo Oraza · 50問 · 2年前compre set 4
compre set 4
50問 • 2年前問題一覧
1
due to ordinary unfavorable weather condition
2
15 cal. days from the date of written notice from the contractor to the DE/RD/consultant or equivalent official
3
45 days
4
suspension of work along the parallel activities
5
in case of total suspension of activities along the critical path which is not due to the fault of the contractor
6
monitoring
7
time,cost,performance
8
none of the above
9
construction project logbook
10
site instruction-for non-compliance with contract specifications
11
minutes of meeting
12
more resources or less have been used than planned. Activities are taking longer than planned
13
project and contract management application
14
pert/cpm network diagram
15
none of the above
16
contract time
17
accomplishment done ahead of its predecessor
18
Variation Order with Time Extension
19
25-50-25
20
Program Evaluation Review Technique/Critical Path Method
21
Contractor
22
9184
23
Float
24
Basis for Billings
25
20 and 50
26
50 and 70
27
quantity control
28
equipment utilization schedule
29
5 proj costing above 250m and 15 proj costing 250m and below
30
as built plan
31
95%
32
quality control
33
project documents
34
site instruction
35
10 proj implemented simultaneously do not exceed 100m php
36
contract docs
37
none of the above
38
none of the above
39
as staked survey/site layout survey is an activity necessary to verify the actual field condition and to identify modifications and other deviations in the project
40
none of the above
41
30
42
none of the above
43
none of the above
44
none of the above
45
written request for inspection
46
Dpwh PE
47
dpwh me
48
inspection
49
photographs for progress billing
50
99 s. 2016
51
D.O. no. 133, series of 2015
52
216 s. 2000
53
do 171 s. 2022
54
do42s2020
55
do192s2016
56
do60s2017
57
do55s2020
58
do90s2020
59
do46s2022