  • 1

    the contractor shall undertake the repair works, at his own expense, of any damage to the infrastructure on account of the use of materials of inferior quality, within ___ days from the time the head of the procuring entity has issued an order to undertake repair. failure if refusal to comply with this mandate, the procuring entity shall undertake such repair works and shall be entitled to full reimbursement of expenses incurred therein upon demand.

    90

  • 2

    defects liability period (DLP) from project completion to final acceptance

    1 year

  • 3

    which of the following word/s is/are not found in the standard project billboard?

    project name

  • 4

    on the standard DPWH. construction project logbook - qeather chart, what is the color signifying a cloudy weather?

    green

  • 5

    payment for services rendered by Outsourced Resource Speakers of DPWH from the public and private sector shall be computed using the formula: Honorarium=(X)(MSR)(T) where: X is constant MSR = monthly salary rate T = number of actual lecture/training hours+preparation hours what is the value of X?

    0.023

  • 6

    the project billboard shall contain the statement "THIS IS WHERE YOUR TAXES GO" What is the font size of this statement

    60mm

  • 7

    when will Contractor PE be implemented?

    jan 2024

  • 8

    based on DO 18 Series of 2022, revised schedule of fees and charges for laboratory testing of construction materials, what is the new testing rate for compressive strength of concrete cubes 6"x6", concrete cylinder 6"x12" and drilled core 4" and 6" diameter in pesos?

    180php

  • 9

    based on DO261 series of 2022, subcontracting of DPWH locallt funded infrastructure projects, the general xontractor may sub contract portions of the works as may be approved by procuring entity, which shall not exceed ___ of the contracted works, however, the general contractor shall be responsible for the acts, defaults, ans negligence of any subcontractor - its agents or workmen. this requirement does not apply to labor "pakyaw" contracts.

    50%

  • 10

    based on DO 238 series of 2022, mandatory tree planting for DPWH flood control projects, all implementing offices are required to plant ___ seedlings/trees for contracts with at least P5 Million contract amount and additional of ___ seedlings/trees for every additional P5 million comtract amount, or fraction thereafter wich shall be part of the Proram of Work (POW) of every flood control projects.

    1000

  • 11

    a ___ withholding tax shall be deducted from the outsourced resource speakers of DPWH honorarium in conformity with the BIR Memorandum Circular No.5-2006.

    10%

  • 12

    Excavation of indurated rocks can be undertaken by?

    ripper

  • 13

    to improve the quality and value of public infrastructures, all DPWH projects that require value engineering studies should involve the participation of DPWH accredited ____ to ensure that the studies are consistent with internationally accepted value methodology processes and standards.

    VMA

  • 14

    what is the most commonly used pile driver in the Philippines.

    drop hammer

  • 15

    for the procurement of goods, to assure that manufacturing defects shall be corrected by the supplier, a warranty security shall be required from the contract awardee for a minimum period of ____ months and in the case of expendable supplies, or a minimum period of one(1) year.

    3

  • 16

    the defects liability period shall be covered by the ____ of the contractor performs his responsibilities. if the contractor fails to comply with its obligations, the procuring entity shall forfeit its___ ... and perpetually disqualify it from participating in any public bidding.

    performance security

  • 17

    when the contract is mutually terminated the contractor is:

    allowed to submit bids

  • 18

    it is the series of enormous waves craeted by an underwater disturbance such as an earthquake, landslide, volcanic eruption, or meteorit?

    Tsunami

  • 19

    the scale used for various parts of the DPWH design plans shall be 1:700(plan), 1:70 (profile), and ____ (horizontal and vertical cross-section of roads.

    1:100

  • 20

    right-of-way (ROW) acquisition for local infrastructure projects of DPWH shall be the responsibility of ___

    LGU

  • 21

    all sheet in the conceptual design, DED, as stake, revused and asbuilt plans for highways and bridge, water engineering and other related projects shall be uniform and of one standard ____ size mylar paper.

    A2

  • 22

    camber to gravel road is provide to:

    prevent water from stagnanting on the carriage way

  • 23

    it shall be issued instead of work suspension order if suspension/unworkable days are due to unfavorable weather condition(rainy) weather disturbances or effect.

    MTSR

  • 24

    what do you call the method of determining stream discharge by measuring the cross sectional area of the stream and its velocity with a current meter?

    Velocity Area method

  • 25

    buffer zone is a _____ meter easement measured from the toe of the existing riverbanks and/or river structures, such as dikes, revetment, nose of spurdikes and other river training structures toward the main river channel

    10m

  • 26

    outsourced resource speakers of DPWH frim private sectors shall have bachelors/Masters/Doctorate degree with a minimum of ___ years work experience as consultant in a private or public organization, company, or institution, supported by a certification from the organization.

    3

  • 27

    the ___ module provides a comprehensive construction materials prices database that supports the cost estimation process from preparation, review/evaluation, and down to approval of the detauled unit price analysis (DUPA), PROGRAM OF WORKS (POW), and approved budget for the contract (ABC) which shall commence on the 4th quarter of calendar year 2023

    CMPD

  • 28

    for roads and other regular projects of the district offices, the DE are authorized to procure, implement, and approved POW and ABC of DPWH infrastructure projects up to_____

    150m

  • 29

    what is the frequency of asphalt overlay maintenance? Every _____ years

    3

  • 30

    monitoring and safekeeping of the road signages, road lighting, kilometer posts, and RROW boundary markers affected by the on-going road widening projects is under the responsibility and liability of the ____

    contractor

  • 31

    dredging works within ____ from the bridges is prohibited unless prior clearance fromthe government agencies concerned is obtainedand justification with corresponding analysis that the proposed dredging will nit affect the overall stability if the subject bridge

    1km

  • 32

    pursuant of RA 9184 what is the applicable rate for the Liquidated damages?

    1/10% of 1%

  • 33

    it issued by the DPWH to qualified persons who will conduct dredging with commercial utilization.

    dredging clearance

  • 34

    no extraction or removal and disposition of materials shall be allowed in off shore areas within ____ distance from the coast to _____ from the mean low tide.

    500m and 200m

  • 35

    in DPWH, the origin of amy document prepared and acted upon in the department shall be properly identified using the ____ whcih eliminates misplacement and/or loss of documents and facilities location and retrieval of documents.

    office code numbering

  • 36

    for critical infrastructure projects, the RD are authorized to procure, implement and approve plans, POW, and ABC of building projects of more than _____ storey but not to exceed 400m in cost

    4

  • 37

    who is responsible in preparing work suspension order, work resumption order and contract time extension.

    DPWH PE

  • 38

    if the contractor fails to show cause after the lapse of the ____ days period, either by inaction or by default, DPWH shall immediately issue an order terminating the contract

    7 cd

  • 39

    for critical infrastructure projects, the RD are authorized to procure, implement and approve plans, POW, and ABC of Bridge projects of more than _____ linear meter in length but not to exceed 400m cost

    75

  • 40

    the ____ is a pre-design stage of project development wherein the general concepts, other illustrations and typixal drawings are presented. hence, this will be the basis for detailed architectural and engineering design (DAED) phase where the design is refined, and plans, specifications, and estimates are established.

    conceptual design

  • 41

    on the standard DPWH construction project logbook-weather chart, what is the color signifying a fair weather?

    yellow

  • 42

    during the implementation period, request for the contract time extension CTE shall be made within 30 calendar days for locally funded projects or within _____ for foreign funded projects.

    28CD

  • 43

    DPWH shall be___ for the acquisition of ROW in the implementation of projects involving local infrastructure projects (LIP), those under sustainable infrastructure projects alleviating gaps (SIPAG), and projects undertaken by the department through their convergence programs with different agencies.

    not responsible

  • 44

    it is an average surface level of one or more among earths coastal bodies of water from which heights such as elevation may be measured and a type of global vertical datum-a standardized geodetic datum

    mean sea level

  • 45

    for roads and other regular projects of the regional offices, the RD are authorized to procure, implement, and approved POW and ABC of DPWH infrastructure projects up to_____

    400m

  • 46

    it is issued by the dowh to LgUs and other government agencies which will conduct dredging without commercial utilization of dredge materials

    dredging permit

  • 47

    to improve planning and construction of various rock fall netting projects, all DED plans of 2023 projects and onwards involvinf item 522 - active and passive protection systems for unstable slope with total cost of Php ____ and above shall be submitted to Bureau of Design for review and evaluation prior to the approval of the Head of Implementing Office concerned.

    50Million

  • 48

    based on DO 18. sries of 2022, revised schedule of fees and charges for laboratory testing of construction materials, what is the new testing rate for compressive strength of concrete cylinder 8"x16" and flexural strength beams 6"x6" in cross section in pesos

    210php

  • 49

    the obligation for the warranty shall be covered by wither retention money in an amount equivalent to at least ___ of every progress payment, or a special bank guarantee equivalent to at least ___ of the total contract price.

    10%

  • 50

    how many girders are designated to a two lane carriageway width of 7.3m?

    6