  • 1

    clearing and grubbing

    100

  • 2

    removal of structures and obstruction

    101

  • 3

    excavation

    102

  • 4

    structure excavation

    103

  • 5

    embankment

    104

  • 6

    subgrade preparation

    105

  • 7

    aggregate subbase course

    200

  • 8

    aggregate base course

    201

  • 9

    bituminous prime coat

    301

  • 10

    bituminous tack coat

    302

  • 11

    bituminous concrete surface course, hot laid

    310

  • 12

    portland cement concrete pavement

    311

  • 13

    pipe culvert and storm drains

    500

  • 14

    riprap and grouted riprap

    505

  • 15

    stone masonry

    506

  • 16

    curb and/or gutter

    600

  • 17

    sidewalk

    601

  • 18

    guardrail

    603

  • 19

    road sign

    605

  • 20

    pavement markings

    606

  • 21

    reflectorized thermoplastic pavement markings

    612

  • 22

    airconditioning and ventilating system

    1200

  • 23

    elevator system

    1203

  • 24

    water pumping system

    1201

  • 25

    automatic fire sprinkler system

    1202

  • module 2

    module 2

    Wilson Angelo Oraza · 259問 · 2年前

    module 2

    module 2

    259問 • 2年前
    Wilson Angelo Oraza

    module 3

    module 3

    Wilson Angelo Oraza · 107問 · 2年前

    module 3

    module 3

    107問 • 2年前
    Wilson Angelo Oraza

    module 4

    module 4

    Wilson Angelo Oraza · 59問 · 2年前

    module 4

    module 4

    59問 • 2年前
    Wilson Angelo Oraza

    compre set 1

    compre set 1

    Wilson Angelo Oraza · 100問 · 2年前

    compre set 1

    compre set 1

    100問 • 2年前
    Wilson Angelo Oraza

    compre set 3

    compre set 3

    Wilson Angelo Oraza · 100問 · 2年前

    compre set 3

    compre set 3

    100問 • 2年前
    Wilson Angelo Oraza

    compre set 4

    compre set 4

    Wilson Angelo Oraza · 50問 · 2年前

    compre set 4

    compre set 4

    50問 • 2年前
    Wilson Angelo Oraza

    問題一覧

  • 1

    clearing and grubbing

    100

  • 2

    removal of structures and obstruction

    101

  • 3

    excavation

    102

  • 4

    structure excavation

    103

  • 5

    embankment

    104

  • 6

    subgrade preparation

    105

  • 7

    aggregate subbase course

    200

  • 8

    aggregate base course

    201

  • 9

    bituminous prime coat

    301

  • 10

    bituminous tack coat

    302

  • 11

    bituminous concrete surface course, hot laid

    310

  • 12

    portland cement concrete pavement

    311

  • 13

    pipe culvert and storm drains

    500

  • 14

    riprap and grouted riprap

    505

  • 15

    stone masonry

    506

  • 16

    curb and/or gutter

    600

  • 17

    sidewalk

    601

  • 18

    guardrail

    603

  • 19

    road sign

    605

  • 20

    pavement markings

    606

  • 21

    reflectorized thermoplastic pavement markings

    612

  • 22

    airconditioning and ventilating system

    1200

  • 23

    elevator system

    1203

  • 24

    water pumping system

    1201

  • 25

    automatic fire sprinkler system

    1202