module 3

module 3
107問 • 2年前
  • Wilson Angelo Oraza
  • 通報

    問題一覧

  • 1

    ilIs one of the most important and most widely used measurements in the processing and testing of foods

    Moisture determination

  • 2

    Two Methods to Determine the Moisture Content

    1. By use of laboratory thermostatically controlled oven 2. By use of speedy-moisture tester

  • 3

    Is a Quality Control test carried out at site for knowing the increased density or compaction achieved at site on the soll layer.

    FDT

  • 4

    A procedure of excavating hole/pit along the side of the completed section with already constructed pavement (concrete or asphalt) to verify and determine the thickness of the compactedembankment/subbase/base course material

    Test Pitting

  • 5

    Is a measurement of Concrete's Workability or Fluidity

    Slump

  • 6

    What type of Slump?

    True Slump

  • 7

    Is a slump appratus made of a round, straight steel 16mm diameter and approximately 600 mm legth.

    Tamping Rod

  • 8

    Number of blows per 1/3 layer of Cylinderical Specimen

    25

  • 9

    Number of Blows per 1/2 layer of Beam Mold Specimen?

    63

  • 10

    Generally performed to assess whether suspect concrete in a new structure complies with strength-based acceptance criteria or not.

    Core Test

  • 11

    diameter of Core Specimen for thickness determination.

    100mm

  • 12

    a lot lenght for single lane is equal to ___

    1000m

  • 13

    a lot in Coring Test is Divide in ____ equal segment.

    5

  • 14

    what measurement of core will be taken no less 5m interval parallel to the center line if the thinkness is equal to ___mm

    25mm

  • 15

    True or False No acceptance and Final Payment shall be made on completed Pavement unless core test for thickness determination is conducted, except for Barangay Roads where the implementing office is allowed to waive such test

    true

  • 16

    for Coring of asphalt Pavement, the compacted pavement shall have a thickness tolerance of _____mm.

    -5mm

  • 17

    in charge of the formulation and implementation of policies for the purpose of ensuring the safety of all infrastructure facilities and securing the highest efficiency and quality in construction through checking of compliance with approved plans and specifications. Also, is responsible for the establishment of traffic engineering policies, analysis and evaluation of accident data, including average daily traffic and weighbridge data.

    bqs

  • 18

    undertakes researches to identify appropriate standards in the implementation of DPWH projects, in coordination with the private sector. In terms of technological development, BRS undertakes a well-focused research program to improve the quality of projects in DPWH.

    brs

  • 19

    True or False Quality Control by the Owner Quality Assurance by the Contractor

    false

  • 20

    It is the process of verifying the work accomplished to ensure that it meets the technical specifications of the project. This is a function performed by the DPWH to verify that the work is done in accordance with the specifications.

    Quality Assurance

  • 21

    It is the process of checking whether the workmanship and material used is within the standards, and specifications set for the project.

    Quality Control

  • 22

    _____ are written contract documents that include materials and workmanship requirements, inspection and testing procedures, and procedures for the measurement and payment of the work. Specifications are the starting point of quality control. Without specifications, there can be no quality control.

    Specification

  • 23

    _______ prescribe the kind and number of tests for each type of construction material. Testing is done as the materials are being incorporated into the work based on the minimum number of tests indicated on the approved QCP. Additional number of tests to the materials can be required if the Engineer or Inspector is in doubt of the quality of materials used.

    Minimum Test Requirement

  • 24

    The ________ is a plan of works which involves the testing of materials that will be incorporated into a work. It specifies the minimum number of tests required for an item of work based on the quantities stated in the approved Program of Work for a project.

    QCP

  • 25

    ______ is the selection of a representative portion of a material using a standard method to ascertain its characteristics.

    Sampling

  • 26

    True or False Samples should also be taken from the I"n situ" product to determine compliance with the specifications

    False

  • 27

    Sampling is as important as the actual _____

    testing

  • 28

    All samples should be submitted with a corresponding _____ and should be accomplished and duly signed by authorized representatives.

    Sample Card

  • 29

    ____ is the basic means or tools to determine whether the quality of construction materials meets or fails the desired specification requirements.

    Testing

  • 30

    True or False During Inspection, a Material Engineer or an Inspector determines whether or not the delivered construction materials on site are acceptable and conform with the required quantity, size and conditions stipulated in the approved plans and specifications of the materials intended for use in the work.

    false

  • 31

    Test duration for concrete beam / cylinder

    30 mins per set

  • 32

    Test Duration for Asphalt/ Aspahlt Materials

    3-30 days

  • 33

    Test duration for paint

    3-4 days

  • 34

    Test duration for Aggreagtes

    3-7 days

  • 35

    Purpose of Inspection except one

    To minimize quality assurance errors

  • 36

    Suggested Frequency of Inspection except

    Variable

  • 37

    it is type frequency inspection which is Random or Regular spot checks

    Intermittent Spot Checks

  • 38

    It is a type of frequency inspection which Some operations, due to their inherent critical or variable nature require the full presence of the inspector

    Continous Monitoring

  • 39

    It is the procedure through which the owner agrees that all items of work, materials or the project is in accordance with the plans and specifications.

    Acceptance

  • 40

    True or False Two (2) inspections are required to close out the project.

    true

  • 41

    The final inspection verifies the “check on” to assure that all works are substantially completed and all corrections have been made

    check off

  • 42

    Conditions for Acceptance of Materials except one:

    All materials shall be in satisfactory and approved by materials engineer.

  • 43

    give the overall view of the works to be done or accomplished during the implementation of the project. These documents also help in the evaluation of the stability and quality of the projects.

    Project Documents

  • 44

    are the legally executed agreement between the Contractor and the DPWH for the performance of the works covered by the contract.

    contract document

  • 45

    Standard Forms in project implementation (DO)

    do46s2022

  • 46

    DPWH Standard Specification Volume 3 (DO)

    DO 42, 2021

  • 47

    one of the quality control reports relative to on-going construction and maintenance projects undertaken/ implemented by the Regional and District Engineering Offices per Department Order No. 21, dated March 26, 2010.

    Monthly Materials Report

  • 48

    ____ are the written instructions in a form of memorandum/letter pertaining to the noted discrepancies in project implementation. These shall be reviewed by the inspectors and spot verification shall be done to determine the compliance of action taken on the issued instructions.

    site instruction

  • 49

    pre-final inspection reports made by the _____ and the concerned implementing office enumerating the defects/deficiencies noted in the project including the recommendation to correct those defects.

    Consultants

  • 50

    CRITERIA FOR ACCREDITATION of Aspahlt and Concrete Cement Batching Plant except

    Batching Specifications

  • 51

    True or False The minimum materials testing equipment requirement shall be on a "per contractor" basis and not on a "per project" basis i.e., the equipment. may not be used to service several on-going projects of the contractors.

    false

  • 52

    IRI stands for

    international roughness index

  • 53

    It is defined as the lowest moisture at which the soil will flow upon the application of a very small shearing force.

    Liquid Limit

  • 54

    It is defined as the minimum moisture content of which the soil can be readily moulded without braking or crumbling.

    Plastic Limit

  • 55

    It is defined as the minimum moisture content of which the soil can be readily moulded without braking or crumbling indicates compressibility, high PI means high degree of compressibility of a soil. It is also related to permeability, the higher the PI the lower the permeability, and vice-versa.

    Plasticity Index

  • 56

    it determines the bearing capacity of soil on its worst condition

    California Bearing Ratio

  • 57

    It evaluates structural strength of coarse aggregate. An indication of quality as determined by resistance to impact and wear.

    Abrasion Test

  • 58

    test that determines the grain size distribution in soils by sieve, hydrometer or a combined analysis. It is widely used in the classification and identification of soil.

    Sieve Analysis

  • 59

    It is a structural layer which accepts greater compressive strength than the subgrade and thus reduces the deformation of the pavement under traffic loading. It is made of economical materials with a relatively low load bearing capacity which are place on top of subgrade of an embankment materials in order to distribute the wheel load transmitted to the subgrade.

    Subbase Course

  • 60

    The fraction passing the 0.075mm (No.200) sieve shall not be greater than of what percent of the franction passing the 0.425mm (No. 40) sieve.

    66.66% or 2/3

  • 61

    What is the maximum specification of Liquid Limit (LL) for Item 200 ?

    35

  • 62

    What is the maximum specification of Plasticity Index (PI) for Item 200 ?

    12

  • 63

    What is the maximum specification of Abrasion/Mass Percent Wear for Item 200 ?

    50

  • 64

    What is the percent minimum specification of California Bearing Ratio Value (CBR) for Item 200 ?

    30%

  • 65

    The purpose of trial sections is to check the ____ of the materials and the ____ of the equipment and construction method which is proposed to be used.

    Suitability, Efficiency

  • 66

    Department Order for the FDT of at least 100% of the MDD per layer and with the thickness of 200mm of One layer for the Item 200 and 201?

    DO No 77, series of 2016

  • 67

    The quantity to be paid for Item 200 - Aggregates Subbase Course shall be the design volume compacted in-place as shown on thw plans and accepted in the completed course by what measure?

    cubic meter

  • 68

    The unit of quantity to be paid for Item 201 - Aggregates Base Course shall be the design volume compacted in-place as shown on the plans and accepted in the completed course by what measure?

    cubic meter

  • 69

    In some areas where the conventional base course materials are scarce or non-available, the use of _____ weathered limestone blended with _____ crushed stones or gravel shall be allowed, provided that the blended materials meet the requirements of this item.

    40%, 60%

  • 70

    It is reduces the vertical compressive stress induced by Traffic in the subbase and the subgrade.

    Aggregates Base Course

  • 71

    What is the maximum specification of LL and PI for Item 201 - Aggregates Base Course

    25, 6

  • 72

    What is the percentage minimum specification of CBR Value for Item 201 - Aggregates Base Course

    80

  • 73

    What is the maximum specification of Mass percent Wear for Item 201 - Aggregates Base Course?

    50

  • 74

    What is the used Test Method of Liquid Limit for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 89

  • 75

    What is the used Test Method of Plasticity Index for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 90

  • 76

    What is the used Test Method of Abrasion/ Mass percent Wear for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 96

  • 77

    What is the used Test Method of California Bearing Ratio Value for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 193

  • 78

    consists of all work elements carried out by the manager or by those in his organization, which contribute to the quality of the output of the organization.

    quality control work

  • 79

    consists of all work elements carried out by the manager or by those in his organization, which contribute to the quality of the output of some other organization.

    quality assurance work

  • 80

    quality control/assurance framework

    program of work,minimum testing requirements,quality control program,sampling and testing,inspection,acceptance

  • 81

    in item 103 structure excavation minimum test requirment for excavated materials are incorporated for every ____ cu.m. or fraction thereof: 1-G, Grading Test 1-P, Plasticity Test (LL, PL) 1-C, Laboratory Compaction Test and for every ___ mm layer in uncompacted depth: 1-D, Field Density

    1500,150

  • 82

    item 104 embankment For each ____ sq.m of each layer of compacted fill or fraction thereof at least one group of three in-situ density tests. The layers shall be placed not exceeding ____ mm in loose measurement or based on the result of compaction trials.

    500,200

  • 83

    for item 200 aggregate subbase course, a minimum test requirement includes 1-CBR for every ____ cu.m. or fraction thereof.

    2500

  • 84

    for item 311 PCCP, in cement, the minimum test requirement includes 1-Q, quality test for every ____ bags or fraction thereof.

    2000

  • 85

    in item 405 structural concrete, the minimum test requirement for Compressive strength test on concrete cylinder samples are 1 set consisting of ___ concrete cylinder samples shall be taken from each day’s pouring and to represent not more than ___ cu.m. of concrete or fraction thereof.

    3, 75

  • 86

    in item 405 structural concrete, the minimum test requirent for steel reinforcement is 1-Q, Quality Test for every ____ kg or fraction thereof for each size

    10,000

  • 87

    Department Order for schedule of minimum testing requirements governing items of work of the DPWH standard specifications for Public Works Structures ( Building, Ports and Harbor, Flood control and drainage structures and water supply systems, Vol 3, 2019 edition.

    do49s2021

  • 88

    who prepares Quality Control Program(QCP)?

    material engineer of the contractor

  • 89

    who approves Quality Control Program (QCP)?

    head of the IO

  • 90

    ___ means a small part or quantity intended to show what the whole is like.

    sample

  • 91

    ____ is a document filled out and submitted together with the materials samples indicating the various pertinent information and data regarding the material samples and the project.

    sample card

  • 92

    minimum test requirements for paints

    1 sample per 100 cans

  • 93

    minimum test requirements for galvanized steel sheets

    1 sample per 1000 sheets

  • 94

    minimum test requirements for concrete core

    5 cores for every kilometer

  • 95

    minimum testing requiments for asphalt core

    1 core for every 100m

  • 96

    department order for inclusion of the minimum material testing equipment in the technical component of the Bid

    do11s2017

  • 97

    Prepared By The Concerned Project Engineer And Materials Engineer For The Quantities Of Works Accomplished By The Contractor. These Reports Are Attestation That The Materials And Works Corresponding To The Quantity Accomplished Conform With The Approved Plans And Specifications.

    certificate of quality control assurance

  • 98

    minimum test requirement for asphaltic materials 200 drums

    1 sample per 40 tons

  • 99

    minimum testing requirement for galvanized steel pipe

    1 sample per 500m length

  • 100

    for item 307, bituminous plant-mix surface course, minimum test requirements for hydrated lime is for every ____ tons or fraction thereof

    100

  • module 2

    module 2

    Wilson Angelo Oraza · 259問 · 2年前

    module 2

    module 2

    259問 • 2年前
    Wilson Angelo Oraza

    module 4

    module 4

    Wilson Angelo Oraza · 59問 · 2年前

    module 4

    module 4

    59問 • 2年前
    Wilson Angelo Oraza

    item #

    item #

    Wilson Angelo Oraza · 25問 · 2年前

    item #

    item #

    25問 • 2年前
    Wilson Angelo Oraza

    compre set 1

    compre set 1

    Wilson Angelo Oraza · 100問 · 2年前

    compre set 1

    compre set 1

    100問 • 2年前
    Wilson Angelo Oraza

    compre set 3

    compre set 3

    Wilson Angelo Oraza · 100問 · 2年前

    compre set 3

    compre set 3

    100問 • 2年前
    Wilson Angelo Oraza

    compre set 4

    compre set 4

    Wilson Angelo Oraza · 50問 · 2年前

    compre set 4

    compre set 4

    50問 • 2年前
    Wilson Angelo Oraza

    問題一覧

  • 1

    ilIs one of the most important and most widely used measurements in the processing and testing of foods

    Moisture determination

  • 2

    Two Methods to Determine the Moisture Content

    1. By use of laboratory thermostatically controlled oven 2. By use of speedy-moisture tester

  • 3

    Is a Quality Control test carried out at site for knowing the increased density or compaction achieved at site on the soll layer.

    FDT

  • 4

    A procedure of excavating hole/pit along the side of the completed section with already constructed pavement (concrete or asphalt) to verify and determine the thickness of the compactedembankment/subbase/base course material

    Test Pitting

  • 5

    Is a measurement of Concrete's Workability or Fluidity

    Slump

  • 6

    What type of Slump?

    True Slump

  • 7

    Is a slump appratus made of a round, straight steel 16mm diameter and approximately 600 mm legth.

    Tamping Rod

  • 8

    Number of blows per 1/3 layer of Cylinderical Specimen

    25

  • 9

    Number of Blows per 1/2 layer of Beam Mold Specimen?

    63

  • 10

    Generally performed to assess whether suspect concrete in a new structure complies with strength-based acceptance criteria or not.

    Core Test

  • 11

    diameter of Core Specimen for thickness determination.

    100mm

  • 12

    a lot lenght for single lane is equal to ___

    1000m

  • 13

    a lot in Coring Test is Divide in ____ equal segment.

    5

  • 14

    what measurement of core will be taken no less 5m interval parallel to the center line if the thinkness is equal to ___mm

    25mm

  • 15

    True or False No acceptance and Final Payment shall be made on completed Pavement unless core test for thickness determination is conducted, except for Barangay Roads where the implementing office is allowed to waive such test

    true

  • 16

    for Coring of asphalt Pavement, the compacted pavement shall have a thickness tolerance of _____mm.

    -5mm

  • 17

    in charge of the formulation and implementation of policies for the purpose of ensuring the safety of all infrastructure facilities and securing the highest efficiency and quality in construction through checking of compliance with approved plans and specifications. Also, is responsible for the establishment of traffic engineering policies, analysis and evaluation of accident data, including average daily traffic and weighbridge data.

    bqs

  • 18

    undertakes researches to identify appropriate standards in the implementation of DPWH projects, in coordination with the private sector. In terms of technological development, BRS undertakes a well-focused research program to improve the quality of projects in DPWH.

    brs

  • 19

    True or False Quality Control by the Owner Quality Assurance by the Contractor

    false

  • 20

    It is the process of verifying the work accomplished to ensure that it meets the technical specifications of the project. This is a function performed by the DPWH to verify that the work is done in accordance with the specifications.

    Quality Assurance

  • 21

    It is the process of checking whether the workmanship and material used is within the standards, and specifications set for the project.

    Quality Control

  • 22

    _____ are written contract documents that include materials and workmanship requirements, inspection and testing procedures, and procedures for the measurement and payment of the work. Specifications are the starting point of quality control. Without specifications, there can be no quality control.

    Specification

  • 23

    _______ prescribe the kind and number of tests for each type of construction material. Testing is done as the materials are being incorporated into the work based on the minimum number of tests indicated on the approved QCP. Additional number of tests to the materials can be required if the Engineer or Inspector is in doubt of the quality of materials used.

    Minimum Test Requirement

  • 24

    The ________ is a plan of works which involves the testing of materials that will be incorporated into a work. It specifies the minimum number of tests required for an item of work based on the quantities stated in the approved Program of Work for a project.

    QCP

  • 25

    ______ is the selection of a representative portion of a material using a standard method to ascertain its characteristics.

    Sampling

  • 26

    True or False Samples should also be taken from the I"n situ" product to determine compliance with the specifications

    False

  • 27

    Sampling is as important as the actual _____

    testing

  • 28

    All samples should be submitted with a corresponding _____ and should be accomplished and duly signed by authorized representatives.

    Sample Card

  • 29

    ____ is the basic means or tools to determine whether the quality of construction materials meets or fails the desired specification requirements.

    Testing

  • 30

    True or False During Inspection, a Material Engineer or an Inspector determines whether or not the delivered construction materials on site are acceptable and conform with the required quantity, size and conditions stipulated in the approved plans and specifications of the materials intended for use in the work.

    false

  • 31

    Test duration for concrete beam / cylinder

    30 mins per set

  • 32

    Test Duration for Asphalt/ Aspahlt Materials

    3-30 days

  • 33

    Test duration for paint

    3-4 days

  • 34

    Test duration for Aggreagtes

    3-7 days

  • 35

    Purpose of Inspection except one

    To minimize quality assurance errors

  • 36

    Suggested Frequency of Inspection except

    Variable

  • 37

    it is type frequency inspection which is Random or Regular spot checks

    Intermittent Spot Checks

  • 38

    It is a type of frequency inspection which Some operations, due to their inherent critical or variable nature require the full presence of the inspector

    Continous Monitoring

  • 39

    It is the procedure through which the owner agrees that all items of work, materials or the project is in accordance with the plans and specifications.

    Acceptance

  • 40

    True or False Two (2) inspections are required to close out the project.

    true

  • 41

    The final inspection verifies the “check on” to assure that all works are substantially completed and all corrections have been made

    check off

  • 42

    Conditions for Acceptance of Materials except one:

    All materials shall be in satisfactory and approved by materials engineer.

  • 43

    give the overall view of the works to be done or accomplished during the implementation of the project. These documents also help in the evaluation of the stability and quality of the projects.

    Project Documents

  • 44

    are the legally executed agreement between the Contractor and the DPWH for the performance of the works covered by the contract.

    contract document

  • 45

    Standard Forms in project implementation (DO)

    do46s2022

  • 46

    DPWH Standard Specification Volume 3 (DO)

    DO 42, 2021

  • 47

    one of the quality control reports relative to on-going construction and maintenance projects undertaken/ implemented by the Regional and District Engineering Offices per Department Order No. 21, dated March 26, 2010.

    Monthly Materials Report

  • 48

    ____ are the written instructions in a form of memorandum/letter pertaining to the noted discrepancies in project implementation. These shall be reviewed by the inspectors and spot verification shall be done to determine the compliance of action taken on the issued instructions.

    site instruction

  • 49

    pre-final inspection reports made by the _____ and the concerned implementing office enumerating the defects/deficiencies noted in the project including the recommendation to correct those defects.

    Consultants

  • 50

    CRITERIA FOR ACCREDITATION of Aspahlt and Concrete Cement Batching Plant except

    Batching Specifications

  • 51

    True or False The minimum materials testing equipment requirement shall be on a "per contractor" basis and not on a "per project" basis i.e., the equipment. may not be used to service several on-going projects of the contractors.

    false

  • 52

    IRI stands for

    international roughness index

  • 53

    It is defined as the lowest moisture at which the soil will flow upon the application of a very small shearing force.

    Liquid Limit

  • 54

    It is defined as the minimum moisture content of which the soil can be readily moulded without braking or crumbling.

    Plastic Limit

  • 55

    It is defined as the minimum moisture content of which the soil can be readily moulded without braking or crumbling indicates compressibility, high PI means high degree of compressibility of a soil. It is also related to permeability, the higher the PI the lower the permeability, and vice-versa.

    Plasticity Index

  • 56

    it determines the bearing capacity of soil on its worst condition

    California Bearing Ratio

  • 57

    It evaluates structural strength of coarse aggregate. An indication of quality as determined by resistance to impact and wear.

    Abrasion Test

  • 58

    test that determines the grain size distribution in soils by sieve, hydrometer or a combined analysis. It is widely used in the classification and identification of soil.

    Sieve Analysis

  • 59

    It is a structural layer which accepts greater compressive strength than the subgrade and thus reduces the deformation of the pavement under traffic loading. It is made of economical materials with a relatively low load bearing capacity which are place on top of subgrade of an embankment materials in order to distribute the wheel load transmitted to the subgrade.

    Subbase Course

  • 60

    The fraction passing the 0.075mm (No.200) sieve shall not be greater than of what percent of the franction passing the 0.425mm (No. 40) sieve.

    66.66% or 2/3

  • 61

    What is the maximum specification of Liquid Limit (LL) for Item 200 ?

    35

  • 62

    What is the maximum specification of Plasticity Index (PI) for Item 200 ?

    12

  • 63

    What is the maximum specification of Abrasion/Mass Percent Wear for Item 200 ?

    50

  • 64

    What is the percent minimum specification of California Bearing Ratio Value (CBR) for Item 200 ?

    30%

  • 65

    The purpose of trial sections is to check the ____ of the materials and the ____ of the equipment and construction method which is proposed to be used.

    Suitability, Efficiency

  • 66

    Department Order for the FDT of at least 100% of the MDD per layer and with the thickness of 200mm of One layer for the Item 200 and 201?

    DO No 77, series of 2016

  • 67

    The quantity to be paid for Item 200 - Aggregates Subbase Course shall be the design volume compacted in-place as shown on thw plans and accepted in the completed course by what measure?

    cubic meter

  • 68

    The unit of quantity to be paid for Item 201 - Aggregates Base Course shall be the design volume compacted in-place as shown on the plans and accepted in the completed course by what measure?

    cubic meter

  • 69

    In some areas where the conventional base course materials are scarce or non-available, the use of _____ weathered limestone blended with _____ crushed stones or gravel shall be allowed, provided that the blended materials meet the requirements of this item.

    40%, 60%

  • 70

    It is reduces the vertical compressive stress induced by Traffic in the subbase and the subgrade.

    Aggregates Base Course

  • 71

    What is the maximum specification of LL and PI for Item 201 - Aggregates Base Course

    25, 6

  • 72

    What is the percentage minimum specification of CBR Value for Item 201 - Aggregates Base Course

    80

  • 73

    What is the maximum specification of Mass percent Wear for Item 201 - Aggregates Base Course?

    50

  • 74

    What is the used Test Method of Liquid Limit for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 89

  • 75

    What is the used Test Method of Plasticity Index for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 90

  • 76

    What is the used Test Method of Abrasion/ Mass percent Wear for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 96

  • 77

    What is the used Test Method of California Bearing Ratio Value for the Item 200- Aggregates Subbase Course and Item 201- Aggregates Base Course?

    AASHTO T 193

  • 78

    consists of all work elements carried out by the manager or by those in his organization, which contribute to the quality of the output of the organization.

    quality control work

  • 79

    consists of all work elements carried out by the manager or by those in his organization, which contribute to the quality of the output of some other organization.

    quality assurance work

  • 80

    quality control/assurance framework

    program of work,minimum testing requirements,quality control program,sampling and testing,inspection,acceptance

  • 81

    in item 103 structure excavation minimum test requirment for excavated materials are incorporated for every ____ cu.m. or fraction thereof: 1-G, Grading Test 1-P, Plasticity Test (LL, PL) 1-C, Laboratory Compaction Test and for every ___ mm layer in uncompacted depth: 1-D, Field Density

    1500,150

  • 82

    item 104 embankment For each ____ sq.m of each layer of compacted fill or fraction thereof at least one group of three in-situ density tests. The layers shall be placed not exceeding ____ mm in loose measurement or based on the result of compaction trials.

    500,200

  • 83

    for item 200 aggregate subbase course, a minimum test requirement includes 1-CBR for every ____ cu.m. or fraction thereof.

    2500

  • 84

    for item 311 PCCP, in cement, the minimum test requirement includes 1-Q, quality test for every ____ bags or fraction thereof.

    2000

  • 85

    in item 405 structural concrete, the minimum test requirement for Compressive strength test on concrete cylinder samples are 1 set consisting of ___ concrete cylinder samples shall be taken from each day’s pouring and to represent not more than ___ cu.m. of concrete or fraction thereof.

    3, 75

  • 86

    in item 405 structural concrete, the minimum test requirent for steel reinforcement is 1-Q, Quality Test for every ____ kg or fraction thereof for each size

    10,000

  • 87

    Department Order for schedule of minimum testing requirements governing items of work of the DPWH standard specifications for Public Works Structures ( Building, Ports and Harbor, Flood control and drainage structures and water supply systems, Vol 3, 2019 edition.

    do49s2021

  • 88

    who prepares Quality Control Program(QCP)?

    material engineer of the contractor

  • 89

    who approves Quality Control Program (QCP)?

    head of the IO

  • 90

    ___ means a small part or quantity intended to show what the whole is like.

    sample

  • 91

    ____ is a document filled out and submitted together with the materials samples indicating the various pertinent information and data regarding the material samples and the project.

    sample card

  • 92

    minimum test requirements for paints

    1 sample per 100 cans

  • 93

    minimum test requirements for galvanized steel sheets

    1 sample per 1000 sheets

  • 94

    minimum test requirements for concrete core

    5 cores for every kilometer

  • 95

    minimum testing requiments for asphalt core

    1 core for every 100m

  • 96

    department order for inclusion of the minimum material testing equipment in the technical component of the Bid

    do11s2017

  • 97

    Prepared By The Concerned Project Engineer And Materials Engineer For The Quantities Of Works Accomplished By The Contractor. These Reports Are Attestation That The Materials And Works Corresponding To The Quantity Accomplished Conform With The Approved Plans And Specifications.

    certificate of quality control assurance

  • 98

    minimum test requirement for asphaltic materials 200 drums

    1 sample per 40 tons

  • 99

    minimum testing requirement for galvanized steel pipe

    1 sample per 500m length

  • 100

    for item 307, bituminous plant-mix surface course, minimum test requirements for hydrated lime is for every ____ tons or fraction thereof

    100