  • 1

    topographic/hydrographic survey of river channel and flood plains upstream and downstream of the bridge site a distance 5 times the width of the river channel or at least?

    100-200m

  • 2

    in accordance with the requirements of Geotechnical Investigation, what is the minimum number of boring shall be provided for piers or abutments over 30m wide?

    2

  • 3

    for school buildings, all slab reinforcements shall be ___ clear minimum from bottom and top of slab

    20mm

  • 4

    for school bldngs, camber all beams and girder at least 6mm for every ___ of span, excepr cantilevers for which the camber shall be as noted in plans but no case less than 20mm for every ___ span

    4.5m,3m

  • 5

    for school bldngs, all embedded pipes for utilities etc that pass thru beams shall not exceed ___ in diameter or 1/3 beam depth whichever is less

    100mm

  • 6

    lateral forces on building frame can be analyzed by approximate analytical methods, except one:

    moment distribution method

  • 7

    what is the maximum free height of the PVC sheet pile for revetments to limit potential deflection?

    2m

  • 8

    what method is usually adopted when there is no visible evidence of termite infestation during soil poisoning?

    cordoning

  • 9

    what method is usually adopted when there is visible evidence of termite infestation during soil poisoning?

    drenching

  • 10

    for buildings, what is the maximum of number of borehole for every 200sqm of the structure?

    1

  • 11

    warranty period for permanent structures as per ra9184?

    15yrs

  • 12

    what is the minimum vertical clearance above road carriageway for flyovers, bridges, and railways?

    5.03m

  • 13

    what is the minimum vertical clearance above road carriageway for pedestrian footbridges?

    5.33m

  • 14

    the minimum headroom between the pedestrian walking surface and bottom of girder of the structure like railway, flyover, and bridge above shall be ___.

    2m

  • 15

    variation order should not exceed ____ of the original contract price.

    10%

  • 16

    what is issued to the contractor by the DPWH to cover any increase / decrease on quantities of original work items in the contract?

    change order

  • 17

    timeframe for the processing of variation orders from the preparation up to the approval by the procuring entity concerned shall not exceed ___ calendar days.

    30

  • 18

    advance payment to the contractor in an amount not to exceed ___ of the total original contract amount.

    15%

  • 19

    what is the periodic payment for contractors progress billing?

    once a month

  • 20

    withholding vat for progress billings of the contractor shall be?

    5%

  • 21

    the procuring entity shall retain from each progress payment ___ of such payment, reffered to as the "retention money."

    10%

  • 22

    once the project reaches an accomplisent of ___ of the total contract amount, the procuring entity may create an inspectorate team to make preliminary inspection and submit a punch-lidt to the contractor in preparation for the final turnover of the project.

    95%

  • 23

    Total amount of liquidated damages shall be deducted to the ___.

    final billing

  • 24

    contract time extension may be granted only when the affected activities fall within the ___ of the PERT/CPM or PDM network

    critical path

  • 25

    it reflects accomplishment duration relationship in the project.

    catch up schedule

  • 26

    it is the graphical representation of the cumulative monthly cash flow of the project overvits time duration.

    s curve

  • 27

    it is the difference between the targeted accomplishment and the actual accomplishment at the end of a certain period, it is expressed in percentage and indicates the performance of project implementation

    time slippage

  • 28

    one eligibility requirement for contractors is to be a Filipino Citizen or at least ___ Filipino owned partnership or corporation

    60%

  • 29

    defective works in a project should be brought to the attention of the contractor by the resident engineer thru:

    site instruction

  • 30

    what is the designed life span of permanent bridges before it is being replaced?

    50 yrs

  • 31

    what do you call the distance between two intermediate supports of bridges?

    span length

  • 32

    what do you call the clearance between the Design Flood Level (DFL) or the Maximum Experienced Flood Level(MEFL) and the (soffit) of the lowest member of the bridge superstructure?

    freeboard

  • 33

    this is very suitable for shallow foundation and for areas wherein the hard strata lie 3m below the NGL for firm materials and 5m below the NGL for soft materials

    spread footing

  • 34

    which of the following is NOT a type of Caisson Foundation?

    close

  • 35

    this is equal to the tip elevation minus the "cutoff elevation" or bottom elevation of the Pile cap

    driven length

  • 36

    what is the maximum allowed span length for reinforced concrete girder?

    24m

  • 37

    which of the ff is not a type of bridge superstructure

    abutment

  • 38

    what is the suggested type of prestressed girder to be used when the span length is about 35m?

    type 6

  • 39

    what is the suggested type of prestressed girder to be used when the span length is about 18m?

    type 3

  • 40

    what is the maximum jacking force for pre-stressed girders?

    85%

  • 41

    which of the following is not a type of steel deck used on bridge?

    close panel

  • 42

    this is a method of determining stream discharge by measuring the cross-sectional area of the streamvand its velocity with a current meter.

    velocity-area

  • 43

    MELF means maximum ___ Flood Level

    experienced

  • 44

    which of the ff is not a type of flood control?

    spear dike

  • 45

    Dike height=freeboard+____

    DFL

  • 46

    revetment are structures constructed ____ to the flow of the river.

    parallel

  • 47

    generally, what is the minimum freeboard allowance above the MELF and DFL of revetments?

    0.60m

  • 48

    if the height of the revetment is more than ___, berm (banquette) must be provided to separate thr revetment into segments, for stability and maintenance/patrolling purposes.

    5m

  • 49

    minimum overall thickness should be ___ for all types of revetment, except for reinforced concrete type.

    300mm

  • 50

    what is the maximum length of spur dike?

    100m

  • 51

    what do you call the scouring of bet material due to increased stream sediment transport capacity that results from an increase in the energy gradient?

    degradation

  • 52

    groundsills are structures constructed ____ to the flow of the river.

    perpendicular

  • 53

    this is a kind of cut-off channel veing constructed to carry 10% of a river discharge, and which subsequently develops capacity of up to 40%

    pilot channel

  • 54

    for creeks in urban and rural areas and not subject to overbank flows, a minimum easement to be provided measured from the edge of the existing bank or the improved bank should be ___.

    4.5m

  • 55

    rivers, esteros and navigating canals, not subject to overbank flows should have a minimum easement measured from the edge of the existing bank or the improved bank of ___

    5.5m

  • 56

    from the time of peoject was bid to the issuance of notice to proceed, ____ calendar days is required for a project to be entitled to contract price adjustment.

    120

  • 57

    this is where the computation of contract price escalation of a project that is awarded thru public bidding should be based and reckoned.

    date of bidding

  • 58

    this is where the computation of contract price escalation of a project that is awarded thru simplified bidding should be based and reckoned.

    approval of the contract

  • 59

    in horizontal alignment of roads and highways, what is maximum the algebraic difference of cross-over?

    7%

  • 60

    for roads and highways, what is minimum recommended width of curve widening?

    0.6m

  • 61

    what is the minimum diameter size of pipe culverts?

    910mm

  • 62

    what is the minimum length of the radius of horizontal curve for PCCP on farm2market roads?

    30m

  • 63

    what is the minimum thickness of PCCP on farm2market roads?

    200mm

  • 64

    what is the minimum width of PCCP on farm2market roads per lane with average daily traffic less than 200?

    2.50m

  • 65

    what is the minimum width of PCCP on national highways per lane?

    3.35m

  • 66

    what is the minimum depth of roadside channel from the bottom of pavement?

    600mm

  • 67

    what is the cross slope of the higher shoulder for roads and highways when the superelevation is 5%

    -2%

  • 68

    what is the cross slope of the higher shoulder for roads and highways when the super elevation is 4%?

    -3%

  • 69

    for effective drainage, the slope of edge of pavement shall be less than or equal to ___ between +-1.5% grade

    0.3%

  • 70

    for service load design of bridges, what is the flexural stress in the extreme fiber stress in compression?

    0.4f'c

  • 71

    what is the maximum height of brisge abutment?

    15m

  • 72

    in urban area, what is minimum bridge pedestrian width?

    1200mm

  • 73

    in rural area, what is minimum brisge pedestrian width?

    750mm

  • 74

    qhat is the durometer hardness for elastomeric bearing pads which is 100% virgin chloroprene (neoprene) pads?

    60

  • 75

    what is the minimum vertical clearance above road carriageway for vehicles?

    4.88m

  • 76

    as per RA 9184, RULE XIX, section 62, what is the warranty period for semi-permanent structures or building types 1,2 and 3?

    5yrs

  • 77

    what is the minimum end laps for prepainted steel roofing sheets?

    150mm

  • 78

    for combination of bored/steel sheet pile for bank protection, what is the minimum N-value capable developing the required ultimate bearing capacity?

    20

  • 79

    statement: splicing of pvc sheet piles for revetments shall be allowed.

    false

  • 80

    every buildng will be designed lateral seismic forces. as a minimum, the design base shear (V=ZICW/Rw)vwill be applied to the structure and be distributed to the various levels of the structure. the factor Z (seismicity of the site) as used in the philippines is ___.

    0.4 for zone 4

  • 81

    statement: no pipes shall be allowed to pass thru beams of school bldngs vertically

    true

  • 82

    statement: no pipes shall be embedded in columns of the school bldngs

    true

  • 83

    the spacing of the bars at the column strips for school building shall not be more than ___ slab thickness.

    1 1/2

  • 84

    what is the validity/renewal period of the project engineer accreditation

    3 yrs

  • 85

    the implementation of this contractor's project engineer accreditation shall take effect on ___

    jan 2024

  • 86

    for roads and highways, what is minimum recommended width of curve widening?

    0.6m

  • 87

    in an emergency, the head of the procuring entity may authorize a variation order beyond 10% but not more than ___ of the original contract price following the guidelines determined by governemnt procurement policy board (GPPD)

    20%

  • 88

    processing of advance payment shall require that minimum of ___ of the scope of work should be workable or free from obstructions.

    30%

  • 89

    during interim billing, contracts with amount of more than 100million can file a progress billing up to ___ contracts that are below 100 million can only file up to ___ of the contract amount.

    95%,90%

  • 90

    in no case however, shall the total sum of liquidated damages exceed ___ of the contract price, in which event the contract shall be automatically be taken over by the procuring entity concerned or can be awarded to same qualified contractor through negotiated contract.

    10%

  • 91

    statement: when a contract is not mutually terminated, the contractor is still allowed to submit bids.

    false

  • 92

    who is the approving official for Work suspension Order (WSO) when the suspension period is up to 60CD?

    DE

  • 93

    who is the approving official for work suspension order(WSO) when the suspension period is beyond 60CD?

    RD

  • 94

    early warning stage happens when the negative slippage of the project accomplishment is ___

    5%

  • 95

    terminal stage happens when the negative slippage of the project accomplishment is ____

    15%

  • 96

    ICU. stage happens when the negative slippage of the project accomplishment is ___

    10%

  • 97

    during bidding, the bidder may sub-contract a material or significant portion of the goods which must bot exceed ___ of the contract price.

    20%

  • 98

    the BAC shall determine to its satisfaction whether the bidder that is evaluated as having submitted the ____ complies with and is responsive to all the requirements and conditions

    lowest calculated bid

  • 99

    what do you call the process of compressing the duration of a project in PERT CPM/PDM

    crashing

  • 100

    what do you call the overlap between the first and second activity in PERT CPM/PDM

    lead time

  • module 2

    module 2

    Wilson Angelo Oraza · 259問 · 2年前

    module 2

    module 2

    259問 • 2年前
    Wilson Angelo Oraza

    module 3

    module 3

    Wilson Angelo Oraza · 107問 · 2年前

    module 3

    module 3

    107問 • 2年前
    Wilson Angelo Oraza

    module 4

    module 4

    Wilson Angelo Oraza · 59問 · 2年前

    module 4

    module 4

    59問 • 2年前
    Wilson Angelo Oraza

    item #

    item #

    Wilson Angelo Oraza · 25問 · 2年前

    item #

    item #

    25問 • 2年前
    Wilson Angelo Oraza

    compre set 3

    compre set 3

    Wilson Angelo Oraza · 100問 · 2年前

    compre set 3

    compre set 3

    100問 • 2年前
    Wilson Angelo Oraza

    compre set 4

    compre set 4

    Wilson Angelo Oraza · 50問 · 2年前

    compre set 4

    compre set 4

    50問 • 2年前
    Wilson Angelo Oraza

    問題一覧

  • 1

    topographic/hydrographic survey of river channel and flood plains upstream and downstream of the bridge site a distance 5 times the width of the river channel or at least?

    100-200m

  • 2

    in accordance with the requirements of Geotechnical Investigation, what is the minimum number of boring shall be provided for piers or abutments over 30m wide?

    2

  • 3

    for school buildings, all slab reinforcements shall be ___ clear minimum from bottom and top of slab

    20mm

  • 4

    for school bldngs, camber all beams and girder at least 6mm for every ___ of span, excepr cantilevers for which the camber shall be as noted in plans but no case less than 20mm for every ___ span

    4.5m,3m

  • 5

    for school bldngs, all embedded pipes for utilities etc that pass thru beams shall not exceed ___ in diameter or 1/3 beam depth whichever is less

    100mm

  • 6

    lateral forces on building frame can be analyzed by approximate analytical methods, except one:

    moment distribution method

  • 7

    what is the maximum free height of the PVC sheet pile for revetments to limit potential deflection?

    2m

  • 8

    what method is usually adopted when there is no visible evidence of termite infestation during soil poisoning?

    cordoning

  • 9

    what method is usually adopted when there is visible evidence of termite infestation during soil poisoning?

    drenching

  • 10

    for buildings, what is the maximum of number of borehole for every 200sqm of the structure?

    1

  • 11

    warranty period for permanent structures as per ra9184?

    15yrs

  • 12

    what is the minimum vertical clearance above road carriageway for flyovers, bridges, and railways?

    5.03m

  • 13

    what is the minimum vertical clearance above road carriageway for pedestrian footbridges?

    5.33m

  • 14

    the minimum headroom between the pedestrian walking surface and bottom of girder of the structure like railway, flyover, and bridge above shall be ___.

    2m

  • 15

    variation order should not exceed ____ of the original contract price.

    10%

  • 16

    what is issued to the contractor by the DPWH to cover any increase / decrease on quantities of original work items in the contract?

    change order

  • 17

    timeframe for the processing of variation orders from the preparation up to the approval by the procuring entity concerned shall not exceed ___ calendar days.

    30

  • 18

    advance payment to the contractor in an amount not to exceed ___ of the total original contract amount.

    15%

  • 19

    what is the periodic payment for contractors progress billing?

    once a month

  • 20

    withholding vat for progress billings of the contractor shall be?

    5%

  • 21

    the procuring entity shall retain from each progress payment ___ of such payment, reffered to as the "retention money."

    10%

  • 22

    once the project reaches an accomplisent of ___ of the total contract amount, the procuring entity may create an inspectorate team to make preliminary inspection and submit a punch-lidt to the contractor in preparation for the final turnover of the project.

    95%

  • 23

    Total amount of liquidated damages shall be deducted to the ___.

    final billing

  • 24

    contract time extension may be granted only when the affected activities fall within the ___ of the PERT/CPM or PDM network

    critical path

  • 25

    it reflects accomplishment duration relationship in the project.

    catch up schedule

  • 26

    it is the graphical representation of the cumulative monthly cash flow of the project overvits time duration.

    s curve

  • 27

    it is the difference between the targeted accomplishment and the actual accomplishment at the end of a certain period, it is expressed in percentage and indicates the performance of project implementation

    time slippage

  • 28

    one eligibility requirement for contractors is to be a Filipino Citizen or at least ___ Filipino owned partnership or corporation

    60%

  • 29

    defective works in a project should be brought to the attention of the contractor by the resident engineer thru:

    site instruction

  • 30

    what is the designed life span of permanent bridges before it is being replaced?

    50 yrs

  • 31

    what do you call the distance between two intermediate supports of bridges?

    span length

  • 32

    what do you call the clearance between the Design Flood Level (DFL) or the Maximum Experienced Flood Level(MEFL) and the (soffit) of the lowest member of the bridge superstructure?

    freeboard

  • 33

    this is very suitable for shallow foundation and for areas wherein the hard strata lie 3m below the NGL for firm materials and 5m below the NGL for soft materials

    spread footing

  • 34

    which of the following is NOT a type of Caisson Foundation?

    close

  • 35

    this is equal to the tip elevation minus the "cutoff elevation" or bottom elevation of the Pile cap

    driven length

  • 36

    what is the maximum allowed span length for reinforced concrete girder?

    24m

  • 37

    which of the ff is not a type of bridge superstructure

    abutment

  • 38

    what is the suggested type of prestressed girder to be used when the span length is about 35m?

    type 6

  • 39

    what is the suggested type of prestressed girder to be used when the span length is about 18m?

    type 3

  • 40

    what is the maximum jacking force for pre-stressed girders?

    85%

  • 41

    which of the following is not a type of steel deck used on bridge?

    close panel

  • 42

    this is a method of determining stream discharge by measuring the cross-sectional area of the streamvand its velocity with a current meter.

    velocity-area

  • 43

    MELF means maximum ___ Flood Level

    experienced

  • 44

    which of the ff is not a type of flood control?

    spear dike

  • 45

    Dike height=freeboard+____

    DFL

  • 46

    revetment are structures constructed ____ to the flow of the river.

    parallel

  • 47

    generally, what is the minimum freeboard allowance above the MELF and DFL of revetments?

    0.60m

  • 48

    if the height of the revetment is more than ___, berm (banquette) must be provided to separate thr revetment into segments, for stability and maintenance/patrolling purposes.

    5m

  • 49

    minimum overall thickness should be ___ for all types of revetment, except for reinforced concrete type.

    300mm

  • 50

    what is the maximum length of spur dike?

    100m

  • 51

    what do you call the scouring of bet material due to increased stream sediment transport capacity that results from an increase in the energy gradient?

    degradation

  • 52

    groundsills are structures constructed ____ to the flow of the river.

    perpendicular

  • 53

    this is a kind of cut-off channel veing constructed to carry 10% of a river discharge, and which subsequently develops capacity of up to 40%

    pilot channel

  • 54

    for creeks in urban and rural areas and not subject to overbank flows, a minimum easement to be provided measured from the edge of the existing bank or the improved bank should be ___.

    4.5m

  • 55

    rivers, esteros and navigating canals, not subject to overbank flows should have a minimum easement measured from the edge of the existing bank or the improved bank of ___

    5.5m

  • 56

    from the time of peoject was bid to the issuance of notice to proceed, ____ calendar days is required for a project to be entitled to contract price adjustment.

    120

  • 57

    this is where the computation of contract price escalation of a project that is awarded thru public bidding should be based and reckoned.

    date of bidding

  • 58

    this is where the computation of contract price escalation of a project that is awarded thru simplified bidding should be based and reckoned.

    approval of the contract

  • 59

    in horizontal alignment of roads and highways, what is maximum the algebraic difference of cross-over?

    7%

  • 60

    for roads and highways, what is minimum recommended width of curve widening?

    0.6m

  • 61

    what is the minimum diameter size of pipe culverts?

    910mm

  • 62

    what is the minimum length of the radius of horizontal curve for PCCP on farm2market roads?

    30m

  • 63

    what is the minimum thickness of PCCP on farm2market roads?

    200mm

  • 64

    what is the minimum width of PCCP on farm2market roads per lane with average daily traffic less than 200?

    2.50m

  • 65

    what is the minimum width of PCCP on national highways per lane?

    3.35m

  • 66

    what is the minimum depth of roadside channel from the bottom of pavement?

    600mm

  • 67

    what is the cross slope of the higher shoulder for roads and highways when the superelevation is 5%

    -2%

  • 68

    what is the cross slope of the higher shoulder for roads and highways when the super elevation is 4%?

    -3%

  • 69

    for effective drainage, the slope of edge of pavement shall be less than or equal to ___ between +-1.5% grade

    0.3%

  • 70

    for service load design of bridges, what is the flexural stress in the extreme fiber stress in compression?

    0.4f'c

  • 71

    what is the maximum height of brisge abutment?

    15m

  • 72

    in urban area, what is minimum bridge pedestrian width?

    1200mm

  • 73

    in rural area, what is minimum brisge pedestrian width?

    750mm

  • 74

    qhat is the durometer hardness for elastomeric bearing pads which is 100% virgin chloroprene (neoprene) pads?

    60

  • 75

    what is the minimum vertical clearance above road carriageway for vehicles?

    4.88m

  • 76

    as per RA 9184, RULE XIX, section 62, what is the warranty period for semi-permanent structures or building types 1,2 and 3?

    5yrs

  • 77

    what is the minimum end laps for prepainted steel roofing sheets?

    150mm

  • 78

    for combination of bored/steel sheet pile for bank protection, what is the minimum N-value capable developing the required ultimate bearing capacity?

    20

  • 79

    statement: splicing of pvc sheet piles for revetments shall be allowed.

    false

  • 80

    every buildng will be designed lateral seismic forces. as a minimum, the design base shear (V=ZICW/Rw)vwill be applied to the structure and be distributed to the various levels of the structure. the factor Z (seismicity of the site) as used in the philippines is ___.

    0.4 for zone 4

  • 81

    statement: no pipes shall be allowed to pass thru beams of school bldngs vertically

    true

  • 82

    statement: no pipes shall be embedded in columns of the school bldngs

    true

  • 83

    the spacing of the bars at the column strips for school building shall not be more than ___ slab thickness.

    1 1/2

  • 84

    what is the validity/renewal period of the project engineer accreditation

    3 yrs

  • 85

    the implementation of this contractor's project engineer accreditation shall take effect on ___

    jan 2024

  • 86

    for roads and highways, what is minimum recommended width of curve widening?

    0.6m

  • 87

    in an emergency, the head of the procuring entity may authorize a variation order beyond 10% but not more than ___ of the original contract price following the guidelines determined by governemnt procurement policy board (GPPD)

    20%

  • 88

    processing of advance payment shall require that minimum of ___ of the scope of work should be workable or free from obstructions.

    30%

  • 89

    during interim billing, contracts with amount of more than 100million can file a progress billing up to ___ contracts that are below 100 million can only file up to ___ of the contract amount.

    95%,90%

  • 90

    in no case however, shall the total sum of liquidated damages exceed ___ of the contract price, in which event the contract shall be automatically be taken over by the procuring entity concerned or can be awarded to same qualified contractor through negotiated contract.

    10%

  • 91

    statement: when a contract is not mutually terminated, the contractor is still allowed to submit bids.

    false

  • 92

    who is the approving official for Work suspension Order (WSO) when the suspension period is up to 60CD?

    DE

  • 93

    who is the approving official for work suspension order(WSO) when the suspension period is beyond 60CD?

    RD

  • 94

    early warning stage happens when the negative slippage of the project accomplishment is ___

    5%

  • 95

    terminal stage happens when the negative slippage of the project accomplishment is ____

    15%

  • 96

    ICU. stage happens when the negative slippage of the project accomplishment is ___

    10%

  • 97

    during bidding, the bidder may sub-contract a material or significant portion of the goods which must bot exceed ___ of the contract price.

    20%

  • 98

    the BAC shall determine to its satisfaction whether the bidder that is evaluated as having submitted the ____ complies with and is responsive to all the requirements and conditions

    lowest calculated bid

  • 99

    what do you call the process of compressing the duration of a project in PERT CPM/PDM

    crashing

  • 100

    what do you call the overlap between the first and second activity in PERT CPM/PDM

    lead time