問題一覧
1
Large amounts of power can be quickly discharged.
2
reheat connection with a soldering tool and recheck with an ohmmeter
3
Magnetic
4
Thermistor
5
inductive reactance
6
Phosphate test
7
By components of the connected load
8
open as soon as the loadcurrent exceeds the set point
9
Primary winding
10
act as a heat sink
11
the generator ccircuit breaker from the bus
12
Batteries are weak
13
prevent coupling overheating
14
The winding will burn out.
15
radiation effect
16
Increase ambient temperature decreases the service life of electronic components
17
recognize normal operation
18
prevent contact melting
19
Sulfur hexafluoride
20
so as not to load down the circuit and obtain erroneous voltage readings
21
Sound-powered teelephone system
22
Dust
23
lose its load begin to motorize trip out on reverse power delay, and possibly overspeed
24
limit switches
25
strong spring
26
series with the load and in parallel with the meter movement
27
The variables in digital systems are fixed quantities, and the variables in analog systems are contnuous quantities
28
Not synchronized, current is flowing and the relays are closed
29
Megohmmeter
30
higher than the bus frequency
31
Current
32
To provide DC power for a main propulsion motor.
33
Ohmmeter
34
Connct the insulation resistance tester to the conductor with safety earth connection ON
35
Atomization
36
circular mills
37
Wheatstone bridge principle
38
Decrease the governor setting on the \'off going generator.
39
synchroscope is defective or broken
40
Required net positive suction pressure is designed into the system
41
90
42
Icurrent
43
Type K
44
root means square value
45
Rated short ionization current
46
two-back-to back SCR's with a common gate lead
47
There is a ground on the line with the dark lamp
48
motor has started properly
49
Short
50
Excessive vibration of the vessel
51
depletion mode
52
glass and mica
53
electric shock if the tool is shorted
54
raise the no-load speed setting of the governor
55
The common talking circuit is composed of two ungrounded wires
56
so as not to load down the circuit and obtain erroneous voltage readings
57
alternator field excitation
58
check the voltage supply from the power source
59
Speedometer
60
3,280 Amperes
61
Synchonous motor
62
at right angles and as far as practicable
63
1,000V
64
secondary winding
65
maximum
66
across-the-line starters
67
Minority current carrier
68
Synchroscope
69
input impedance much greater than the impedance across which the voltage is being measured
70
Excessive vibration of the vessel
71
The pressure specified by the manufacturer as a criteria for boiler design
72
voltage regulator
73
electromotive force
74
burn with their original intensities
75
Split range control
76
raising the generator engine speed
77
an open in the main winding
78
3,280 Amperes
79
Voltage decreases as current increases
80
Boiler components are generally constructed of similar metals
81
Ceramic circuit breaker
82
it travels from north to south through the surrounding medium of bar magnet
83
root means square value
84
reheat connection with a soldering tool and recheck with an ohmmeter
85
Strip the board of all nonvital circuits.
86
Impedance is placed in neutral earthing line.
87
Zener diodes
88
dark or dim switchboard ground detectinglight
89
By using infra-red thermal imaging device
90
Printed circuit board
91
electromagnet
92
Equal voltage, equal frequency
93
voltage regulator
94
25 mA
95
it travels from north to south through the surrounding medium of bar magnet
96
Wound-rotor induction motor
97
main switchboard
98
Because hand driven megger tester will not be able to give the steady test voltage for longer time
99
differential amp. voltage amp and output amp
100
apparent power
c1
c1
Jeo Clyde Arizo · 111問 · 1年前c1
c1
111問 • 1年前c2
c2
Jeo Clyde Arizo · 76問 · 1年前c2
c2
76問 • 1年前c3
c3
Jeo Clyde Arizo · 158問 · 1年前c3
c3
158問 • 1年前c4
c4
Jeo Clyde Arizo · 402問 · 1年前c4
c4
402問 • 1年前c5
c5
Jeo Clyde Arizo · 152問 · 1年前c5
c5
152問 • 1年前c7
c7
Jeo Clyde Arizo · 127問 · 1年前c7
c7
127問 • 1年前c8
c8
Jeo Clyde Arizo · 179問 · 1年前c8
c8
179問 • 1年前c9
c9
Jeo Clyde Arizo · 115問 · 1年前c9
c9
115問 • 1年前c10
c10
Jeo Clyde Arizo · 133問 · 1年前c10
c10
133問 • 1年前c11
c11
Jeo Clyde Arizo · 75問 · 1年前c11
c11
75問 • 1年前c15
c15
Jeo Clyde Arizo · 100問 · 1年前c15
c15
100問 • 1年前c16
c16
Jeo Clyde Arizo · 150問 · 1年前c16
c16
150問 • 1年前問題一覧
1
Large amounts of power can be quickly discharged.
2
reheat connection with a soldering tool and recheck with an ohmmeter
3
Magnetic
4
Thermistor
5
inductive reactance
6
Phosphate test
7
By components of the connected load
8
open as soon as the loadcurrent exceeds the set point
9
Primary winding
10
act as a heat sink
11
the generator ccircuit breaker from the bus
12
Batteries are weak
13
prevent coupling overheating
14
The winding will burn out.
15
radiation effect
16
Increase ambient temperature decreases the service life of electronic components
17
recognize normal operation
18
prevent contact melting
19
Sulfur hexafluoride
20
so as not to load down the circuit and obtain erroneous voltage readings
21
Sound-powered teelephone system
22
Dust
23
lose its load begin to motorize trip out on reverse power delay, and possibly overspeed
24
limit switches
25
strong spring
26
series with the load and in parallel with the meter movement
27
The variables in digital systems are fixed quantities, and the variables in analog systems are contnuous quantities
28
Not synchronized, current is flowing and the relays are closed
29
Megohmmeter
30
higher than the bus frequency
31
Current
32
To provide DC power for a main propulsion motor.
33
Ohmmeter
34
Connct the insulation resistance tester to the conductor with safety earth connection ON
35
Atomization
36
circular mills
37
Wheatstone bridge principle
38
Decrease the governor setting on the \'off going generator.
39
synchroscope is defective or broken
40
Required net positive suction pressure is designed into the system
41
90
42
Icurrent
43
Type K
44
root means square value
45
Rated short ionization current
46
two-back-to back SCR's with a common gate lead
47
There is a ground on the line with the dark lamp
48
motor has started properly
49
Short
50
Excessive vibration of the vessel
51
depletion mode
52
glass and mica
53
electric shock if the tool is shorted
54
raise the no-load speed setting of the governor
55
The common talking circuit is composed of two ungrounded wires
56
so as not to load down the circuit and obtain erroneous voltage readings
57
alternator field excitation
58
check the voltage supply from the power source
59
Speedometer
60
3,280 Amperes
61
Synchonous motor
62
at right angles and as far as practicable
63
1,000V
64
secondary winding
65
maximum
66
across-the-line starters
67
Minority current carrier
68
Synchroscope
69
input impedance much greater than the impedance across which the voltage is being measured
70
Excessive vibration of the vessel
71
The pressure specified by the manufacturer as a criteria for boiler design
72
voltage regulator
73
electromotive force
74
burn with their original intensities
75
Split range control
76
raising the generator engine speed
77
an open in the main winding
78
3,280 Amperes
79
Voltage decreases as current increases
80
Boiler components are generally constructed of similar metals
81
Ceramic circuit breaker
82
it travels from north to south through the surrounding medium of bar magnet
83
root means square value
84
reheat connection with a soldering tool and recheck with an ohmmeter
85
Strip the board of all nonvital circuits.
86
Impedance is placed in neutral earthing line.
87
Zener diodes
88
dark or dim switchboard ground detectinglight
89
By using infra-red thermal imaging device
90
Printed circuit board
91
electromagnet
92
Equal voltage, equal frequency
93
voltage regulator
94
25 mA
95
it travels from north to south through the surrounding medium of bar magnet
96
Wound-rotor induction motor
97
main switchboard
98
Because hand driven megger tester will not be able to give the steady test voltage for longer time
99
differential amp. voltage amp and output amp
100
apparent power