NBC 6-8

NBC 6-8
100問 • 2年前
  • DHANE JOAN NICOLE QUIDLAT
  • 通報

    問題一覧

  • 1

    Light commercial, Low-intensity trade/activity

    C1

  • 2

    Medium commercial, Medium-rise buildings (3-5 storeys)

    C2

  • 3

    Metropolitan commercial, Medium to high-rise buildings (3-5 storeys)

    C3

  • 4

    Community to national level of institutional use. Low-rise to high-rise.

    GI

  • 5

    Two types of General institutional

    Education/Recreation, Medical/Government

  • 6

    Light industrial use, Low-rise but sprawling, Low-intensity manufacturing

    I1

  • 7

    Medium industrial use, Low-rise but sprawling, Medium-intensity manufacturing

    I2

  • 8

    Utilitarian, functional uses, Low-rise to medium rise, Low to high-intensity community support functions

    UTS

  • 9

    Two clusters of UTS

    Transport terminals, intermodals, depots, Power/water generation/distribution, telcos, waste management facilities

  • 10

    Included cemeteries and memorial parks

    SPE

  • 11

    Low-rise to medium rise, Low to medium intensity recreational functions related to educational uses (parks on campus, other recreational/assembly structures on campus)

    PRE

  • 12

    Community to national level of use or occupancy, Low-rise to medium rise

    CUL

  • 13

    Low to medium rise, Low to high intensity agricultural activity, Includes farms, but also offices and facilities for agricultural research and training

    A (Agricultural)

  • 14

    Low rise, Low to high intensity agroindustrial activity, Includes offices and facilities for agroindustrial education and research

    AI

  • 15

    Land development or redevelopment schemes for a new project which has a CDMP (Comprehensive Development Masterplan) or equivalent

    PUD

  • 16

    Eaves over required windows shall at least

    750mm

  • 17

    Why are firewalls important

    Because when they are built, the building or parts of the building extends into the setbacks.

  • 18

    Allowable firewalls - R1

    Not Allowed

  • 19

    Allowable firewalls - R2

    One side only. Maximum 80% of the length of side property line.

  • 20

    fireproof barrier used to prevent the spread of fire between or through buildings

    Firewalls

  • 21

    Allowable Firewalls - R3(A-two sides)

    Maximum 85% of each side, Total should not exceed 65% of lot perimeter, Two storeys high only

  • 22

    Allowable Firewalls - R3(B-one side + rear)

    90% of side or rear (up to 100% for rear if only 4m), Total should not exceed 50% of lot perimeter, Two storeys high for side, 3.20m high for rear

  • 23

    Allowable firewalls - R4

    Maximum 85% of each side, Total should not exceed 50% of lot perimeter, Maximum height: three storeys

  • 24

    Allowable firewalls - R5(A:two sides)

    Maximum 75% of each side, Total should not exceed 50% of lot perimeter, Maximum height: 8 storeys

  • 25

    Allowable firewalls - R5(B:one side + rear)

    Maximum 65% of side and 50% of rear, Total should not exceed 60% of lot perimeter, Maximum height: 8 storeys for side, 14m for rear

  • 26

    TGFA

    Total gross floor area

  • 27

    BHL

    Building height limit

  • 28

    How is building height measured?

    From established grade line to the topmost

  • 29

    How to establish top of building If roof is flat

    top = rooftop

  • 30

    How to establish top of building If roof is sloping

    top = middle of roof height

  • 31

    How to establish the grade line If grade is sloping less than 3 meters diff.

    take highest grade

  • 32

    How to establish the grade line If grade is sloping more than 3 meters diff.

    take the average

  • 33

    The RROW width also dictates the BHL: 6-7m RROW

    3.0 storeys or 9.0m

  • 34

    The RROW width also dictates the BHL: 4-5m RROW

    2.5 storeys or 7.5m

  • 35

    The RROW width also dictates the BHL: 0-3m RROW

    2.0 storeys or 6.0m

  • 36

    Parking slot size for Car (perpendicular parking)

    2.50 m x 5.00

  • 37

    Parking slot size for Car (parallel parking)

    2.15m x 6.00m

  • 38

    Parking slot size for jeepney

    3.00m x 9.00m

  • 39

    Parking slot size for Standard truck/bus

    3.60m x 12.00m

  • 40

    Parking slot size for Articulated truck

    3.60m x 18.00m

  • 41

    Using the RROW as a maneuvering space

    not allowed

  • 42

    Off-site parking lots: If a multi-floor parking garage is located within a 200-meter radius of the building, ____ of the required parking provisions may be served the multi-floor parking garage.

    20%

  • 43

    Off-site parking lots: Reserved or leased parking slots may also serve the parking requirements if:

    The slots are in a permanent parking building and not in a vacant parking lot., The said parking building is: Not more than 100m away, if residential, The said parking building is: Not more than 200m away, if commercial

  • 44

    direct access of parking/loading/utility slots to the RROW

    not allowed

  • 45

    The building ingress and the intersection of a Traffic-generating building shall be at least ____ apart (measured between the two nearest curbs)

    50.00m

  • 46

    Front yards as parking Not allowed for the following:

    R2 basic, R3 basic, GI, C1, C2 and C3

  • 47

    50% of front yard may be used as parking for

    R2 Maximum, R3 Maximum

  • 48

    At least ___ sanitary toilet and adequate washing and draining facilities

    one

  • 49

    minimum foundation thickness

    250mm

  • 50

    Structural load: First floor live load

    200kg/sqm

  • 51

    Structural load: second floor live load

    150kg/sqm

  • 52

    Wind load for roofs

    120kg/sqm (vertical)

  • 53

    At least ____ entrance, and another ____ for exit

    one

  • 54

    TLA

    Total lot area

  • 55

    PSO

    Percentage of site occupancy

  • 56

    The part of the lot occupied by the building (A.K.A. building footprint expressed in %)

    PSO

  • 57

    TOSL

    Total open space within lot

  • 58

    The part of the lot NOT occupied by the building

    TOSL

  • 59

    How to get TLA

    PSO + TOSL

  • 60

    USA

    Unpaved surface area

  • 61

    The portion of the open space that is unpaved

    USA

  • 62

    ISA

    Impervious surface area

  • 63

    The portion of the open space that is paved

    ISA

  • 64

    How to get TOSL

    USA + ISA

  • 65

    How to get MACA

    PSO + ISA

  • 66

    MACA

    Maximum Allowable Construction Area

  • 67

    another formula to get TLA

    MACA + USA

  • 68

    AMBF

    Allowable max. building footprint

  • 69

    Footprint expressed in square meters

    AMBF

  • 70

    GFA

    Gross floor area

  • 71

    Total enclosed floor area (including balconies)

    GFA

  • 72

    Excludes the following enclosed areas: Parking, services, utilities. Vertical penetrations in parking floors if not used for residential or commercial purposes

    GFA

  • 73

    TGFA

    Total gross floor area

  • 74

    Includes all enclosed floor areas, no exceptions

    TGFA

  • 75

    AMVB

    Allowable max. volume of building

  • 76

    OFB

    Outer faces of the building

  • 77

    FLAR

    Floor and lot area ratio

  • 78

    How to get Building Bulk

    Footprint x Height

  • 79

    Building bulk by AMBF projection

    AMBF x BHL

  • 80

    Building bulk from FLAR

    [(FLAR x TLA)/number of storeys] x BHL

  • 81

    Building bulk from AMVB

    AMBF x BHL

  • 82

    prism

    initial AMVB

  • 83

    How to get PSO

    AMBF / TLA

  • 84

    How to get GFA

    TLA x FLAR

  • 85

    How to get TGFA

    GFA + Non-GFA – Courts

  • 86

    How to get TLA

    PSO + TOSL

  • 87

    How to get TOSL

    USA + ISA

  • 88

    minimum value

    USA

  • 89

    maximum value

    ISA

  • 90

    the required open space left between the outermost face of the building and the property lines

    yard

  • 91

    no build zone

    easement

  • 92

    easement for beaches

    20.00 - 30.00

  • 93

    PRC

    Professional Regulation Commission

  • 94

    minimum RROW

    3.00 m

  • 95

    center of the road

    crown

  • 96

    Under Rule 7 of the 2004 Revised Implementing Rules and regulations of the National Building Code of the Philippines deals with what aspects of design

    Classification & Requirements of buildings by use and occupancy

  • 97

    Minimum area for kitchens

    3.00 sq.m

  • 98

    Minimum size of rooms for human habitations

    6.00 sq.m w/ least dimension of 2.00m

  • 99

    Minimum size for T&B

    1.20 sq.m w/ least dimension of 0.90m

  • 100

    Minimum air space for School Rooms

    3.00 cubic meters with 1.00 square meter of floor area per person

  • NBC 1-5

    NBC 1-5

    DHANE JOAN NICOLE QUIDLAT · 100問 · 2年前

    NBC 1-5

    NBC 1-5

    100問 • 2年前
    DHANE JOAN NICOLE QUIDLAT

    NBC

    NBC

    DHANE JOAN NICOLE QUIDLAT · 19問 · 2年前

    NBC

    NBC

    19問 • 2年前
    DHANE JOAN NICOLE QUIDLAT

    utl

    utl

    DHANE JOAN NICOLE QUIDLAT · 100問 · 1年前

    utl

    utl

    100問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    utl2

    utl2

    DHANE JOAN NICOLE QUIDLAT · 13問 · 1年前

    utl2

    utl2

    13問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    NBC 13-20

    NBC 13-20

    DHANE JOAN NICOLE QUIDLAT · 51問 · 1年前

    NBC 13-20

    NBC 13-20

    51問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    BP344

    BP344

    DHANE JOAN NICOLE QUIDLAT · 49問 · 1年前

    BP344

    BP344

    49問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    heri 1-3

    heri 1-3

    DHANE JOAN NICOLE QUIDLAT · 57問 · 1年前

    heri 1-3

    heri 1-3

    57問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    heri 4-6

    heri 4-6

    DHANE JOAN NICOLE QUIDLAT · 52問 · 1年前

    heri 4-6

    heri 4-6

    52問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    9266

    9266

    DHANE JOAN NICOLE QUIDLAT · 93問 · 1年前

    9266

    9266

    93問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    9266.2

    9266.2

    DHANE JOAN NICOLE QUIDLAT · 25問 · 1年前

    9266.2

    9266.2

    25問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    heri 6-11

    heri 6-11

    DHANE JOAN NICOLE QUIDLAT · 43問 · 1年前

    heri 6-11

    heri 6-11

    43問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    nhcp

    nhcp

    DHANE JOAN NICOLE QUIDLAT · 41問 · 1年前

    nhcp

    nhcp

    41問 • 1年前
    DHANE JOAN NICOLE QUIDLAT

    問題一覧

  • 1

    Light commercial, Low-intensity trade/activity

    C1

  • 2

    Medium commercial, Medium-rise buildings (3-5 storeys)

    C2

  • 3

    Metropolitan commercial, Medium to high-rise buildings (3-5 storeys)

    C3

  • 4

    Community to national level of institutional use. Low-rise to high-rise.

    GI

  • 5

    Two types of General institutional

    Education/Recreation, Medical/Government

  • 6

    Light industrial use, Low-rise but sprawling, Low-intensity manufacturing

    I1

  • 7

    Medium industrial use, Low-rise but sprawling, Medium-intensity manufacturing

    I2

  • 8

    Utilitarian, functional uses, Low-rise to medium rise, Low to high-intensity community support functions

    UTS

  • 9

    Two clusters of UTS

    Transport terminals, intermodals, depots, Power/water generation/distribution, telcos, waste management facilities

  • 10

    Included cemeteries and memorial parks

    SPE

  • 11

    Low-rise to medium rise, Low to medium intensity recreational functions related to educational uses (parks on campus, other recreational/assembly structures on campus)

    PRE

  • 12

    Community to national level of use or occupancy, Low-rise to medium rise

    CUL

  • 13

    Low to medium rise, Low to high intensity agricultural activity, Includes farms, but also offices and facilities for agricultural research and training

    A (Agricultural)

  • 14

    Low rise, Low to high intensity agroindustrial activity, Includes offices and facilities for agroindustrial education and research

    AI

  • 15

    Land development or redevelopment schemes for a new project which has a CDMP (Comprehensive Development Masterplan) or equivalent

    PUD

  • 16

    Eaves over required windows shall at least

    750mm

  • 17

    Why are firewalls important

    Because when they are built, the building or parts of the building extends into the setbacks.

  • 18

    Allowable firewalls - R1

    Not Allowed

  • 19

    Allowable firewalls - R2

    One side only. Maximum 80% of the length of side property line.

  • 20

    fireproof barrier used to prevent the spread of fire between or through buildings

    Firewalls

  • 21

    Allowable Firewalls - R3(A-two sides)

    Maximum 85% of each side, Total should not exceed 65% of lot perimeter, Two storeys high only

  • 22

    Allowable Firewalls - R3(B-one side + rear)

    90% of side or rear (up to 100% for rear if only 4m), Total should not exceed 50% of lot perimeter, Two storeys high for side, 3.20m high for rear

  • 23

    Allowable firewalls - R4

    Maximum 85% of each side, Total should not exceed 50% of lot perimeter, Maximum height: three storeys

  • 24

    Allowable firewalls - R5(A:two sides)

    Maximum 75% of each side, Total should not exceed 50% of lot perimeter, Maximum height: 8 storeys

  • 25

    Allowable firewalls - R5(B:one side + rear)

    Maximum 65% of side and 50% of rear, Total should not exceed 60% of lot perimeter, Maximum height: 8 storeys for side, 14m for rear

  • 26

    TGFA

    Total gross floor area

  • 27

    BHL

    Building height limit

  • 28

    How is building height measured?

    From established grade line to the topmost

  • 29

    How to establish top of building If roof is flat

    top = rooftop

  • 30

    How to establish top of building If roof is sloping

    top = middle of roof height

  • 31

    How to establish the grade line If grade is sloping less than 3 meters diff.

    take highest grade

  • 32

    How to establish the grade line If grade is sloping more than 3 meters diff.

    take the average

  • 33

    The RROW width also dictates the BHL: 6-7m RROW

    3.0 storeys or 9.0m

  • 34

    The RROW width also dictates the BHL: 4-5m RROW

    2.5 storeys or 7.5m

  • 35

    The RROW width also dictates the BHL: 0-3m RROW

    2.0 storeys or 6.0m

  • 36

    Parking slot size for Car (perpendicular parking)

    2.50 m x 5.00

  • 37

    Parking slot size for Car (parallel parking)

    2.15m x 6.00m

  • 38

    Parking slot size for jeepney

    3.00m x 9.00m

  • 39

    Parking slot size for Standard truck/bus

    3.60m x 12.00m

  • 40

    Parking slot size for Articulated truck

    3.60m x 18.00m

  • 41

    Using the RROW as a maneuvering space

    not allowed

  • 42

    Off-site parking lots: If a multi-floor parking garage is located within a 200-meter radius of the building, ____ of the required parking provisions may be served the multi-floor parking garage.

    20%

  • 43

    Off-site parking lots: Reserved or leased parking slots may also serve the parking requirements if:

    The slots are in a permanent parking building and not in a vacant parking lot., The said parking building is: Not more than 100m away, if residential, The said parking building is: Not more than 200m away, if commercial

  • 44

    direct access of parking/loading/utility slots to the RROW

    not allowed

  • 45

    The building ingress and the intersection of a Traffic-generating building shall be at least ____ apart (measured between the two nearest curbs)

    50.00m

  • 46

    Front yards as parking Not allowed for the following:

    R2 basic, R3 basic, GI, C1, C2 and C3

  • 47

    50% of front yard may be used as parking for

    R2 Maximum, R3 Maximum

  • 48

    At least ___ sanitary toilet and adequate washing and draining facilities

    one

  • 49

    minimum foundation thickness

    250mm

  • 50

    Structural load: First floor live load

    200kg/sqm

  • 51

    Structural load: second floor live load

    150kg/sqm

  • 52

    Wind load for roofs

    120kg/sqm (vertical)

  • 53

    At least ____ entrance, and another ____ for exit

    one

  • 54

    TLA

    Total lot area

  • 55

    PSO

    Percentage of site occupancy

  • 56

    The part of the lot occupied by the building (A.K.A. building footprint expressed in %)

    PSO

  • 57

    TOSL

    Total open space within lot

  • 58

    The part of the lot NOT occupied by the building

    TOSL

  • 59

    How to get TLA

    PSO + TOSL

  • 60

    USA

    Unpaved surface area

  • 61

    The portion of the open space that is unpaved

    USA

  • 62

    ISA

    Impervious surface area

  • 63

    The portion of the open space that is paved

    ISA

  • 64

    How to get TOSL

    USA + ISA

  • 65

    How to get MACA

    PSO + ISA

  • 66

    MACA

    Maximum Allowable Construction Area

  • 67

    another formula to get TLA

    MACA + USA

  • 68

    AMBF

    Allowable max. building footprint

  • 69

    Footprint expressed in square meters

    AMBF

  • 70

    GFA

    Gross floor area

  • 71

    Total enclosed floor area (including balconies)

    GFA

  • 72

    Excludes the following enclosed areas: Parking, services, utilities. Vertical penetrations in parking floors if not used for residential or commercial purposes

    GFA

  • 73

    TGFA

    Total gross floor area

  • 74

    Includes all enclosed floor areas, no exceptions

    TGFA

  • 75

    AMVB

    Allowable max. volume of building

  • 76

    OFB

    Outer faces of the building

  • 77

    FLAR

    Floor and lot area ratio

  • 78

    How to get Building Bulk

    Footprint x Height

  • 79

    Building bulk by AMBF projection

    AMBF x BHL

  • 80

    Building bulk from FLAR

    [(FLAR x TLA)/number of storeys] x BHL

  • 81

    Building bulk from AMVB

    AMBF x BHL

  • 82

    prism

    initial AMVB

  • 83

    How to get PSO

    AMBF / TLA

  • 84

    How to get GFA

    TLA x FLAR

  • 85

    How to get TGFA

    GFA + Non-GFA – Courts

  • 86

    How to get TLA

    PSO + TOSL

  • 87

    How to get TOSL

    USA + ISA

  • 88

    minimum value

    USA

  • 89

    maximum value

    ISA

  • 90

    the required open space left between the outermost face of the building and the property lines

    yard

  • 91

    no build zone

    easement

  • 92

    easement for beaches

    20.00 - 30.00

  • 93

    PRC

    Professional Regulation Commission

  • 94

    minimum RROW

    3.00 m

  • 95

    center of the road

    crown

  • 96

    Under Rule 7 of the 2004 Revised Implementing Rules and regulations of the National Building Code of the Philippines deals with what aspects of design

    Classification & Requirements of buildings by use and occupancy

  • 97

    Minimum area for kitchens

    3.00 sq.m

  • 98

    Minimum size of rooms for human habitations

    6.00 sq.m w/ least dimension of 2.00m

  • 99

    Minimum size for T&B

    1.20 sq.m w/ least dimension of 0.90m

  • 100

    Minimum air space for School Rooms

    3.00 cubic meters with 1.00 square meter of floor area per person