    An exercise given to the Client for him to review the stipulations of the contract documents within a reasonable time.

    Due Diligence

  • 2

    A principle when drafting the contract, where parties are bound by terms and consequences

    Mutuality

  • 3

    Instructions which may be issued prior to the bidding to supplement and/or modify the drawings, specifications, and/or General conditions of the contract.

    Special Provisions

  • 4

    Article 1723 of the Civil Code

    Civil Liability

  • 5

    Allocated payment value in proportion to the work performed by the contractor

    Prorate

  • 6

    Information, advice a notification or pertinent to the project delivered in person or sent by registered mail to the individual, firm, or corporation at the last known business address of such individual, firm or corporation

    Written Notice

  • 7

    An approved form of security furnished by the contractor as a guarantee to the quality of materials and equipments installed and the workmanship performed by the contractor

    Guarantee Bond

  • 8

    A period wherein the contractor shall execute at his own expense all work necessary for the rectification of imperfections.

    Period of making good of known defect

  • 9

    An approved form of security furnished by the contractor as a guarantee of good faith on his part that he will pay all obligations arising from the contract

    Payment Bond

  • 10

    Labor or Materials, or both as well as equipment, transportation, or other facilities necessary to commence and complete the construction called for in the contract

    Work

  • 11

    Additional information or contract documents issued to bidders before date of bidding

    Bid Bulletin

  • 12

    A listing of the different parts of the work indicating the materials and labor included therein.

    Scope of Work

  • 13

    A listing of the different parts of the work indicating in each part the corresponding value of materials and labor, including an allowance for profit and overhead.

    Breakdown of Work and Corresponding Value

  • 14

    It is an outline description enumerating the type or trade names of materials be used

    Schedule of Material and Finishes

  • 15

    An approved form of security furnished by the contractor as a guarantee of good faith that he will execute the work in accordance with the terms of the contract.

    Performance Bond

  • 16

    A principle when drafting the contract, which binds only those involved and assigns.

    Relativity

  • 17

    Article 1305 of the Civil Code

    Contract

  • 18

    A contractual obligation of one party to compensate the loss incurred to the other party or as security against legal liability for one's actions.

    Indemnity

  • 19

    A contract, represented by a policy, in which the client receives financial protection or reimbursement against losses in case of claims on damages on lives and properties lost or affected.

    Insurance

  • 20

    The drawings are supplementary

    False/Complementary

  • 21

    Should the contractor fail to remove, unsatisfactory workmen or fail to furnish suitable and sufficient equipment or personnel for the proper prosecution of the work, thr CONSTRUCTION MANAGER may withhold payment which are or may become or may suspend the work until such orders are compiled with.

    False/Owner

  • 22

    The CLIENT shall prepare at his own expense and submit with such promptness as to cause no delay in his own work or i. that of any other contractor doing work on the same building, teo copies of all shop or setting drWings, templates, patterns and models as well as schedule required for the work of the various trades

    False/Contractor

  • 23

    The CLIENT shall make all necessary arrangements with the local utility companies in order that temporary facilities for water, power, and telephone are sufficiently provided till the completion to of the work. All expenses incurred in connections therewith shall be paid by the CLIENT.

    False/Contractor

  • 24

    Responsibility for the adequacy of the design and for suffiency of the drawings and specifications shall be borne by the CONTRACTOR

    False/Client

  • 25

    The complete requirements of the work to be performed under the contract shall be set forth in drawings and specifications to be supplied by the CONTRACTOR

    False/client

  • 26

    The CONTRACTOR shall furnish from time to time all additional detail drawings and instructions essential to the proper execution of the work.

    False/client

  • 27

    Testing of all samples shall comply with the specifications and government standards and shall be performed by competent, entity or testing laboratory. All cost for shipment, delivery, handling and testing of samples are to be paid by the OWNER

    False/Contractor

  • 28

    The Architect MAY at anytime order extra work or make changes by altering, adding to or deducting from the work

    False/May Not

  • 29

    The contract shall be assigned in whole or in part by the contractor or shall any part of the work be SUBLET by the contractor

    False

  • Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    ユーザ名非公開 · 68問 · 13日前

    Plumbing Arithmetic Terms 5

    Plumbing Arithmetic Terms 5

    68問 • 13日前
    ユーザ名非公開

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    ユーザ名非公開 · 100問 · 13日前

    Practical Problems and Experiences 4

    Practical Problems and Experiences 4

    100問 • 13日前
    ユーザ名非公開

    Plumbing Tools 2

    Plumbing Tools 2

    ユーザ名非公開 · 53問 · 13日前

    Plumbing Tools 2

    Plumbing Tools 2

    53問 • 13日前
    ユーザ名非公開

    施工(各種申請提出先等)

    施工(各種申請提出先等)

    ユーザ名非公開 · 25問 · 1ヶ月前

    施工(各種申請提出先等)

    施工(各種申請提出先等)

    25問 • 1ヶ月前
    ユーザ名非公開

    M#5: Principles of Leadership

    M#5: Principles of Leadership

    ユーザ名非公開 · 37問 · 1ヶ月前

    M#5: Principles of Leadership

    M#5: Principles of Leadership

    37問 • 1ヶ月前
    ユーザ名非公開

    (Finals) Professional issues in Information Technology Mocktest BSIT 505

    (Finals) Professional issues in Information Technology Mocktest BSIT 505

    Xai Alexandrei Delos Reyes · 27問 · 1ヶ月前

    (Finals) Professional issues in Information Technology Mocktest BSIT 505

    (Finals) Professional issues in Information Technology Mocktest BSIT 505

    27問 • 1ヶ月前
    Xai Alexandrei Delos Reyes

    competence 16

    competence 16

    Emm · 100問 · 2ヶ月前

    competence 16

    competence 16

    100問 • 2ヶ月前
    Emm

    competence 16

    competence 16

    Emm · 150問 · 2ヶ月前

    competence 16

    competence 16

    150問 • 2ヶ月前
    Emm

    Competence 1

    Competence 1

    Emm · 112問 · 2ヶ月前

    Competence 1

    Competence 1

    112問 • 2ヶ月前
    Emm

    M11c20⚡️

    M11c20⚡️

    مقطع من الاغاني عراقيه قصيره · 20問 · 2ヶ月前

    M11c20⚡️

    M11c20⚡️

    20問 • 2ヶ月前
    مقطع من الاغاني عراقيه قصيره

    bbme

    bbme

    Desa Mae Santiago · 22問 · 2ヶ月前

    bbme

    bbme

    22問 • 2ヶ月前
    Desa Mae Santiago

    (Pre-Finals) Enterprise Architecture Mocktest BSIT 505

    (Pre-Finals) Enterprise Architecture Mocktest BSIT 505

    Xai Alexandrei Delos Reyes · 42問 · 2ヶ月前

    (Pre-Finals) Enterprise Architecture Mocktest BSIT 505

    (Pre-Finals) Enterprise Architecture Mocktest BSIT 505

    42問 • 2ヶ月前
    Xai Alexandrei Delos Reyes

    (Pre-Finals) ASIA Mocktest BSIT 505

    (Pre-Finals) ASIA Mocktest BSIT 505

    Xai Alexandrei Delos Reyes · 44問 · 2ヶ月前

    (Pre-Finals) ASIA Mocktest BSIT 505

    (Pre-Finals) ASIA Mocktest BSIT 505

    44問 • 2ヶ月前
    Xai Alexandrei Delos Reyes

    (Pre-Finals) Advanced Database Systems Mocktest BSIT 505

    (Pre-Finals) Advanced Database Systems Mocktest BSIT 505

    Xai Alexandrei Delos Reyes · 72問 · 2ヶ月前

    (Pre-Finals) Advanced Database Systems Mocktest BSIT 505

    (Pre-Finals) Advanced Database Systems Mocktest BSIT 505

    72問 • 2ヶ月前
    Xai Alexandrei Delos Reyes

    complete

    complete

    LCB · 50問 · 2ヶ月前

    complete

    complete

    50問 • 2ヶ月前
    LCB

    (Pre-finals) Application Development Mocktest BSIT 505

    (Pre-finals) Application Development Mocktest BSIT 505

    Xai Alexandrei Delos Reyes · 41問 · 2ヶ月前

    (Pre-finals) Application Development Mocktest BSIT 505

    (Pre-finals) Application Development Mocktest BSIT 505

    41問 • 2ヶ月前
    Xai Alexandrei Delos Reyes

    scoops test 7brew

    scoops test 7brew

    ユーザ名非公開 · 24問 · 2ヶ月前

    scoops test 7brew

    scoops test 7brew

    24問 • 2ヶ月前
    ユーザ名非公開

    M7C20

    M7C20

    ユーザ名非公開 · 18問 · 2ヶ月前

    M7C20

    M7C20

    18問 • 2ヶ月前
    ユーザ名非公開

    BBMEI OPERATION

    BBMEI OPERATION

    Desa Mae Santiago · 33問 · 3ヶ月前

    BBMEI OPERATION

    BBMEI OPERATION

    33問 • 3ヶ月前
    Desa Mae Santiago

    問題一覧

  • 1

    An exercise given to the Client for him to review the stipulations of the contract documents within a reasonable time.

    Due Diligence

  • 2

    A principle when drafting the contract, where parties are bound by terms and consequences

    Mutuality

  • 3

    Instructions which may be issued prior to the bidding to supplement and/or modify the drawings, specifications, and/or General conditions of the contract.

    Special Provisions

  • 4

    Article 1723 of the Civil Code

    Civil Liability

  • 5

    Allocated payment value in proportion to the work performed by the contractor

    Prorate

  • 6

    Information, advice a notification or pertinent to the project delivered in person or sent by registered mail to the individual, firm, or corporation at the last known business address of such individual, firm or corporation

    Written Notice

  • 7

    An approved form of security furnished by the contractor as a guarantee to the quality of materials and equipments installed and the workmanship performed by the contractor

    Guarantee Bond

  • 8

    A period wherein the contractor shall execute at his own expense all work necessary for the rectification of imperfections.

    Period of making good of known defect

  • 9

    An approved form of security furnished by the contractor as a guarantee of good faith on his part that he will pay all obligations arising from the contract

    Payment Bond

  • 10

    Labor or Materials, or both as well as equipment, transportation, or other facilities necessary to commence and complete the construction called for in the contract

    Work

  • 11

    Additional information or contract documents issued to bidders before date of bidding

    Bid Bulletin

  • 12

    A listing of the different parts of the work indicating the materials and labor included therein.

    Scope of Work

  • 13

    A listing of the different parts of the work indicating in each part the corresponding value of materials and labor, including an allowance for profit and overhead.

    Breakdown of Work and Corresponding Value

  • 14

    It is an outline description enumerating the type or trade names of materials be used

    Schedule of Material and Finishes

  • 15

    An approved form of security furnished by the contractor as a guarantee of good faith that he will execute the work in accordance with the terms of the contract.

    Performance Bond

  • 16

    A principle when drafting the contract, which binds only those involved and assigns.

    Relativity

  • 17

    Article 1305 of the Civil Code

    Contract

  • 18

    A contractual obligation of one party to compensate the loss incurred to the other party or as security against legal liability for one's actions.

    Indemnity

  • 19

    A contract, represented by a policy, in which the client receives financial protection or reimbursement against losses in case of claims on damages on lives and properties lost or affected.

    Insurance

  • 20

    The drawings are supplementary

    False/Complementary

  • 21

    Should the contractor fail to remove, unsatisfactory workmen or fail to furnish suitable and sufficient equipment or personnel for the proper prosecution of the work, thr CONSTRUCTION MANAGER may withhold payment which are or may become or may suspend the work until such orders are compiled with.

    False/Owner

  • 22

    The CLIENT shall prepare at his own expense and submit with such promptness as to cause no delay in his own work or i. that of any other contractor doing work on the same building, teo copies of all shop or setting drWings, templates, patterns and models as well as schedule required for the work of the various trades

    False/Contractor

  • 23

    The CLIENT shall make all necessary arrangements with the local utility companies in order that temporary facilities for water, power, and telephone are sufficiently provided till the completion to of the work. All expenses incurred in connections therewith shall be paid by the CLIENT.

    False/Contractor

  • 24

    Responsibility for the adequacy of the design and for suffiency of the drawings and specifications shall be borne by the CONTRACTOR

    False/Client

  • 25

    The complete requirements of the work to be performed under the contract shall be set forth in drawings and specifications to be supplied by the CONTRACTOR

    False/client

  • 26

    The CONTRACTOR shall furnish from time to time all additional detail drawings and instructions essential to the proper execution of the work.

    False/client

  • 27

    Testing of all samples shall comply with the specifications and government standards and shall be performed by competent, entity or testing laboratory. All cost for shipment, delivery, handling and testing of samples are to be paid by the OWNER

    False/Contractor

  • 28

    The Architect MAY at anytime order extra work or make changes by altering, adding to or deducting from the work

    False/May Not

  • 29

    The contract shall be assigned in whole or in part by the contractor or shall any part of the work be SUBLET by the contractor

    False