問題一覧
1
The nature of all works being performed on deck, the personnel involved, and potential hazards
2
venturi tubes
3
Set screw
4
Switch on the dead man alarm upon entering the control room
5
Ensure that the emergency generator is in auto mode, ready to start in case of blackout.
6
Call the bridge to inform of the HP fuel line bursting, call the Ch.engineer, shift to ECR control, reduce ME rpm and stop the ship when safe to do so. Then, do the necessary repairs.
7
Prioritization
8
Remove the bilge manifold valve and attempt to back flush the line.
9
allow piston cooling water to efficiency enter the piston despite its reciprocating piston motion without contaminating the engine lube oil
10
They should wear ppe
11
the remaining on board (ROB)_quantity of fuel oil and diesel oil at noon
12
To clear the furnace of any explosive gases
13
Know the safety of all crew including oneself.
14
A steam pressure reducing valve
15
erratic rudder response
16
320 F water systems
17
engineering control room (ECR)
18
mechanical energy to kinetic enrgy to potential energy.
19
Distraction
20
Find the fire, inform the bridge and Ch.engineer, restrict the source of combustion, and extinguish the fire with appropriate means
21
Do not hand over the watch and inform the same to the Ch.engineer for further instructions.
22
Notify the Chief or 2nd Engineer for further instruction.
23
If a person makes a wrong entry and strikesthrough it with one thin line making it still legible and with affixed initials
24
Leadeship
25
Takes down readings of various parameters of machinery required for engine log book entry.
26
the ability to scrutinize and evaluate situations and come out with a development plan for the betterment of the organization
27
improper vacuum regulation
28
Fixed pitch propeller
29
decrease in auxiliary exhaust pressure
30
Clogged sea suction strainer
31
Proactive and caring with one another
32
familiarization
33
Cut-off the air supply, unlock the manual valve handle, and adjust the valve spindle position to the desired temperature setting.
34
Prevents the accumulation of combustible gases
35
'Communicating with clear and enough information' basis
36
Environmental Risk Management
37
Having a good restful sleep for at least 4 hours before each watch.
38
drained
39
Owner's technical superintendents
40
check for items which may become adrift and secure loose gear
41
Ensure that an adequate reserve power is available for steering and other maneuvering requirements
42
That there is overloading of cylinder
43
Auxiliary feed system
44
Sharp perception
45
refrigerant boiling out of solution from the lube oil
46
Erratic rudder response
47
employ constant brainstorming sessions with his workforce and include them in the planning stages
48
oil separator
49
soot insulates the boiler heating surfaces
50
In case of telemotor failure
51
Switch on the dead man alarm upon entering the control room
52
Stern tube packing or mechanical shaft seal
53
work shop
54
All engineer officers and trainee engineer officers
55
qualification
56
At 15 PPm oily water separator
57
when starting any cargo or ballasting operations after arrival port
58
"Knowing it all" attitude
59
Ensure that permanent air or steam pressure is available for sound signals.
60
Check oil level in engine
61
harmful substances
62
Possesses inspirational qualitythat makes followers gets attracted of him and regards him with reverence
63
Teamwork
64
The recorded values and information are used as a reference to compare and record data that can be used for insurance claim if some accidents take place.
65
accumulating oily substance
66
Remain locked in its last position
67
using a temporarily opened cylinder clearance pocket
68
using a temporarily opened cylinder clearance pocket
69
Team management
70
1.5 hours
71
navigation
72
15 to 30 minutes
73
Spiral wound composition asbestos
74
the lowest level
75
Ensure that the boiler steam pressure, water level, and smoke density are in normal ranges.
76
examine the condition of the flame
77
Notify the bridge and ask to shut the engine down.
78
Closed starting air valves
79
Rank, personality, and awareness of personnel
80
have the capacity to make good judgement on every situation and create superior pronouncements based on your judgement
81
Remove the bilge manifold valve and attempt to back flush the line
82
Same gender
83
Self-assessment
84
Check and confirm the local thermometer reading of exhaust gas temperature, whether the same or not with the alarm monitor.
85
The maximum allowable working pressure of the system
86
cause sulfuric acid formation
87
The designated duty engineering watch shall be immediately available and on call to attend the machinery spaces.
88
Switch on the dead man alarm upon entering the control room
89
assessment
90
Checking of bilge level and transfering to bilge holding tank, if necessary.
91
Electrical failure due to overload as a result of starting bow thrusters and deck machineries
92
Communication are established with others to facilitate the emergency response process
93
No safety belt
94
decrease spring tension in the main valve
95
refer to the checklist that represents the skill process as required on board the vessel
96
check that there reliever is capable to carry out watch keeping duties
97
tank fluid level
98
sewage
99
closed, and only slight leakage permitted across the shaft packing
100
Proactive and caring with one another
COMPETENCE 2
COMPETENCE 2
Emm · 50問 · 2ヶ月前COMPETENCE 2
COMPETENCE 2
50問 • 2ヶ月前competence 2
competence 2
Emm · 76問 · 2ヶ月前competence 2
competence 2
76問 • 2ヶ月前Competence 3
Competence 3
Emm · 60問 · 2ヶ月前Competence 3
Competence 3
60問 • 2ヶ月前Competence 3
Competence 3
Emm · 100問 · 2ヶ月前Competence 3
Competence 3
100問 • 2ヶ月前C4 updated
C4 updated
Emm · 20問 · 2ヶ月前C4 updated
C4 updated
20問 • 2ヶ月前C4
C4
Emm · 407問 · 2ヶ月前C4
C4
407問 • 2ヶ月前competence 5
competence 5
Emm · 100問 · 2ヶ月前competence 5
competence 5
100問 • 2ヶ月前COMPETENCE 5
COMPETENCE 5
Emm · 50問 · 2ヶ月前COMPETENCE 5
COMPETENCE 5
50問 • 2ヶ月前COMPETENCE 5
COMPETENCE 5
Emm · 153問 · 2ヶ月前COMPETENCE 5
COMPETENCE 5
153問 • 2ヶ月前Competence 6
Competence 6
Emm · 146問 · 2ヶ月前Competence 6
Competence 6
146問 • 2ヶ月前Competence 6
Competence 6
Emm · 100問 · 2ヶ月前Competence 6
Competence 6
100問 • 2ヶ月前competence 7
competence 7
Emm · 27問 · 2ヶ月前competence 7
competence 7
27問 • 2ヶ月前competence 7
competence 7
Emm · 99問 · 2ヶ月前competence 7
competence 7
99問 • 2ヶ月前competence 7
competence 7
Emm · 20問 · 2ヶ月前competence 7
competence 7
20問 • 2ヶ月前COMPETENCE 7
COMPETENCE 7
Emm · 50問 · 2ヶ月前COMPETENCE 7
COMPETENCE 7
50問 • 2ヶ月前Competence 8
Competence 8
Emm · 181問 · 2ヶ月前Competence 8
Competence 8
181問 • 2ヶ月前COMPETENCE 8
COMPETENCE 8
Emm · 50問 · 2ヶ月前COMPETENCE 8
COMPETENCE 8
50問 • 2ヶ月前competenence 9
competenence 9
Emm · 100問 · 2ヶ月前competenence 9
competenence 9
100問 • 2ヶ月前Competence 9
Competence 9
Emm · 116問 · 2ヶ月前Competence 9
Competence 9
116問 • 2ヶ月前問題一覧
1
The nature of all works being performed on deck, the personnel involved, and potential hazards
2
venturi tubes
3
Set screw
4
Switch on the dead man alarm upon entering the control room
5
Ensure that the emergency generator is in auto mode, ready to start in case of blackout.
6
Call the bridge to inform of the HP fuel line bursting, call the Ch.engineer, shift to ECR control, reduce ME rpm and stop the ship when safe to do so. Then, do the necessary repairs.
7
Prioritization
8
Remove the bilge manifold valve and attempt to back flush the line.
9
allow piston cooling water to efficiency enter the piston despite its reciprocating piston motion without contaminating the engine lube oil
10
They should wear ppe
11
the remaining on board (ROB)_quantity of fuel oil and diesel oil at noon
12
To clear the furnace of any explosive gases
13
Know the safety of all crew including oneself.
14
A steam pressure reducing valve
15
erratic rudder response
16
320 F water systems
17
engineering control room (ECR)
18
mechanical energy to kinetic enrgy to potential energy.
19
Distraction
20
Find the fire, inform the bridge and Ch.engineer, restrict the source of combustion, and extinguish the fire with appropriate means
21
Do not hand over the watch and inform the same to the Ch.engineer for further instructions.
22
Notify the Chief or 2nd Engineer for further instruction.
23
If a person makes a wrong entry and strikesthrough it with one thin line making it still legible and with affixed initials
24
Leadeship
25
Takes down readings of various parameters of machinery required for engine log book entry.
26
the ability to scrutinize and evaluate situations and come out with a development plan for the betterment of the organization
27
improper vacuum regulation
28
Fixed pitch propeller
29
decrease in auxiliary exhaust pressure
30
Clogged sea suction strainer
31
Proactive and caring with one another
32
familiarization
33
Cut-off the air supply, unlock the manual valve handle, and adjust the valve spindle position to the desired temperature setting.
34
Prevents the accumulation of combustible gases
35
'Communicating with clear and enough information' basis
36
Environmental Risk Management
37
Having a good restful sleep for at least 4 hours before each watch.
38
drained
39
Owner's technical superintendents
40
check for items which may become adrift and secure loose gear
41
Ensure that an adequate reserve power is available for steering and other maneuvering requirements
42
That there is overloading of cylinder
43
Auxiliary feed system
44
Sharp perception
45
refrigerant boiling out of solution from the lube oil
46
Erratic rudder response
47
employ constant brainstorming sessions with his workforce and include them in the planning stages
48
oil separator
49
soot insulates the boiler heating surfaces
50
In case of telemotor failure
51
Switch on the dead man alarm upon entering the control room
52
Stern tube packing or mechanical shaft seal
53
work shop
54
All engineer officers and trainee engineer officers
55
qualification
56
At 15 PPm oily water separator
57
when starting any cargo or ballasting operations after arrival port
58
"Knowing it all" attitude
59
Ensure that permanent air or steam pressure is available for sound signals.
60
Check oil level in engine
61
harmful substances
62
Possesses inspirational qualitythat makes followers gets attracted of him and regards him with reverence
63
Teamwork
64
The recorded values and information are used as a reference to compare and record data that can be used for insurance claim if some accidents take place.
65
accumulating oily substance
66
Remain locked in its last position
67
using a temporarily opened cylinder clearance pocket
68
using a temporarily opened cylinder clearance pocket
69
Team management
70
1.5 hours
71
navigation
72
15 to 30 minutes
73
Spiral wound composition asbestos
74
the lowest level
75
Ensure that the boiler steam pressure, water level, and smoke density are in normal ranges.
76
examine the condition of the flame
77
Notify the bridge and ask to shut the engine down.
78
Closed starting air valves
79
Rank, personality, and awareness of personnel
80
have the capacity to make good judgement on every situation and create superior pronouncements based on your judgement
81
Remove the bilge manifold valve and attempt to back flush the line
82
Same gender
83
Self-assessment
84
Check and confirm the local thermometer reading of exhaust gas temperature, whether the same or not with the alarm monitor.
85
The maximum allowable working pressure of the system
86
cause sulfuric acid formation
87
The designated duty engineering watch shall be immediately available and on call to attend the machinery spaces.
88
Switch on the dead man alarm upon entering the control room
89
assessment
90
Checking of bilge level and transfering to bilge holding tank, if necessary.
91
Electrical failure due to overload as a result of starting bow thrusters and deck machineries
92
Communication are established with others to facilitate the emergency response process
93
No safety belt
94
decrease spring tension in the main valve
95
refer to the checklist that represents the skill process as required on board the vessel
96
check that there reliever is capable to carry out watch keeping duties
97
tank fluid level
98
sewage
99
closed, and only slight leakage permitted across the shaft packing
100
Proactive and caring with one another