問題一覧
1
Centrifugal separation
2
Exhaust valve wear is increased.
3
Lapping in
4
According to Marpol, the oil content of the effluent mus be less than 15 ppm
5
lowers the operating efficiency of the system
6
lowers the operating efficiency of the system
7
Purifier
8
A Computing unit
9
right-hand closing(clockwise)
10
Unloading valve
11
Chemical method
12
counteract axial thrust toward the turbine low pressure end
13
increasing the fuel oil heater steam supply
14
Pump driven clutch
15
plugged oil wiper rings
16
The coalescer beads are severely fouled
17
Refrigerating compressor
18
piston
19
constant-pressure governor
20
Acts as backup insulation behind firebrick, plastic refractory, or castable refractory
21
foundation
22
internal friction
23
spring force
24
Feedwater vapor pressure
25
closed
26
bellows
27
The first-stage filter
28
Viscosity regulator
29
phosphate test
30
bilge system will lose vacuum and prevent the other bilges from being pumped out
31
Gland sealing steam system
32
Interface
33
stop check-valve
34
Will begin to lose its water seal.
35
Attempt to pump out another bilge well to determine if the entire system is affected
36
Recirculating line to the main condenser
37
start the cargo p/p then close sea suction valve
38
the relationship between temperature and viscosity varies with different fuels
39
991kg / m3
40
solids in the water from sea contamination
41
reduce fuel viscosity
42
Uneven tightening of casing bolts.
43
vary from section to section throughout the heat exchanger
44
Loss on gland packing
45
large suction chambers and impeller eyes
46
reprime the purifier
47
Transfer pump
48
Pump is not primed.
49
seawater contamination present
50
Fuel injection system
M#5 Section and Title v2
M#5 Section and Title v2
ユーザ名非公開 · 32問 · 13日前M#5 Section and Title v2
M#5 Section and Title v2
32問 • 13日前MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 2
Weekly Test 2
ユーザ名非公開 · 50問 · 13日前Weekly Test 2
Weekly Test 2
50問 • 13日前Weekly Test 1
Weekly Test 1
ユーザ名非公開 · 50問 · 13日前Weekly Test 1
Weekly Test 1
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前Definition of Terms 3
Definition of Terms 3
ユーザ名非公開 · 90問 · 13日前Definition of Terms 3
Definition of Terms 3
90問 • 13日前Definition of Terms 2
Definition of Terms 2
ユーザ名非公開 · 90問 · 13日前Definition of Terms 2
Definition of Terms 2
90問 • 13日前Definition of Terms 1
Definition of Terms 1
ユーザ名非公開 · 90問 · 13日前Definition of Terms 1
Definition of Terms 1
90問 • 13日前WT 6
WT 6
ユーザ名非公開 · 50問 · 13日前WT 6
WT 6
50問 • 13日前WT 3
WT 3
ユーザ名非公開 · 50問 · 13日前WT 3
WT 3
50問 • 13日前WT 2
WT 2
ユーザ名非公開 · 48問 · 13日前WT 2
WT 2
48問 • 13日前WT 1
WT 1
ユーザ名非公開 · 50問 · 13日前WT 1
WT 1
50問 • 13日前SPI version D pt 2
SPI version D pt 2
ユーザ名非公開 · 61問 · 13日前SPI version D pt 2
SPI version D pt 2
61問 • 13日前Standpipe Requirements
Standpipe Requirements
ユーザ名非公開 · 29問 · 13日前Standpipe Requirements
Standpipe Requirements
29問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
ユーザ名非公開 · 78問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
78問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
ユーザ名非公開 · 61問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
61問 • 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
ユーザ名非公開 · 36問 · 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
36問 • 13日前Principles and Code of Ethics
Principles and Code of Ethics
ユーザ名非公開 · 29問 · 13日前Principles and Code of Ethics
Principles and Code of Ethics
29問 • 13日前問題一覧
1
Centrifugal separation
2
Exhaust valve wear is increased.
3
Lapping in
4
According to Marpol, the oil content of the effluent mus be less than 15 ppm
5
lowers the operating efficiency of the system
6
lowers the operating efficiency of the system
7
Purifier
8
A Computing unit
9
right-hand closing(clockwise)
10
Unloading valve
11
Chemical method
12
counteract axial thrust toward the turbine low pressure end
13
increasing the fuel oil heater steam supply
14
Pump driven clutch
15
plugged oil wiper rings
16
The coalescer beads are severely fouled
17
Refrigerating compressor
18
piston
19
constant-pressure governor
20
Acts as backup insulation behind firebrick, plastic refractory, or castable refractory
21
foundation
22
internal friction
23
spring force
24
Feedwater vapor pressure
25
closed
26
bellows
27
The first-stage filter
28
Viscosity regulator
29
phosphate test
30
bilge system will lose vacuum and prevent the other bilges from being pumped out
31
Gland sealing steam system
32
Interface
33
stop check-valve
34
Will begin to lose its water seal.
35
Attempt to pump out another bilge well to determine if the entire system is affected
36
Recirculating line to the main condenser
37
start the cargo p/p then close sea suction valve
38
the relationship between temperature and viscosity varies with different fuels
39
991kg / m3
40
solids in the water from sea contamination
41
reduce fuel viscosity
42
Uneven tightening of casing bolts.
43
vary from section to section throughout the heat exchanger
44
Loss on gland packing
45
large suction chambers and impeller eyes
46
reprime the purifier
47
Transfer pump
48
Pump is not primed.
49
seawater contamination present
50
Fuel injection system