1
•gasketed joints, valve stem, and gage glass packing
2
•electrical conductivity of water
3
• The follow-up gear.
4
•rotor clearances
5
•pressure and temperature fluctuations in the entire unit
6
•refrigerant pressure in the evaporator
7
•Line shaft and stern tube shaft
8
•less power output
9
•Fuel direct back to the suction valve of the service pump
10
•it conpares the bridge signal to the actual rudder angle through the follow up gear
11
• Thrust shaft
12
•fuel oil supply pressure
13
•Prior to an increase in power
14
•Control steam admission and maintain the proper steam spray pattern in the DC heater
15
•liquid in the pump will overheat
16
•Its cooling power equals melting 907 kg.(2000 lbs) of ice per day.
17
•before expansion valve
18
•2-stroke engine
19
•mean effective pressure
20
•prevent solid particles from entering the pump.
21
•heat into mechanical energy,
22
•reduce radial thrust on the impeller
23
•cooling water temperature rise
24
•close the recirculating valve when atomizing temperature is reached
25
•reduce the fuel viscosity for proper atomization
26
•The boiler will produce heavy black smoke
27
•remove condensation and other liquids from the cylinders
28
•be unable to maintain steam flow unless the proper range spring were to be installed
29
•Maintain the proper water level at all times
30
•Regulate outlet valve
31
•along the inlet side of the housing
32
•prevent the escape of lubricating oil from the crankcase
33
•Downcomers
34
•Internal water wash
35
•high fuel temperature,
36
•leaky discharge valves on the LP cylinder
37
•Pump barrel
38
•fuel injector
39
•diameter of the impeller
40
•thrust shaft
41
•expansion valve.
42
•the valve bridge is collapse remotely allowing the valve to close
43
•secure the burner valves
44
•increasing the fuel oil heater steam supply
45
•Hunting
46
•suction valve is closed
47
•Distillation is the process of boiling seawater to produce vapor which is condensed into fresh Water
48
•at least two heaters of approximately equal size are to be installed
49
•50%
50
•Vane
MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 2
Weekly Test 2
ユーザ名非公開 · 50問 · 13日前Weekly Test 2
Weekly Test 2
50問 • 13日前Weekly Test 1
Weekly Test 1
ユーザ名非公開 · 50問 · 13日前Weekly Test 1
Weekly Test 1
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前Definition of Terms 3
Definition of Terms 3
ユーザ名非公開 · 90問 · 13日前Definition of Terms 3
Definition of Terms 3
90問 • 13日前Definition of Terms 1
Definition of Terms 1
ユーザ名非公開 · 90問 · 13日前Definition of Terms 1
Definition of Terms 1
90問 • 13日前WT 6
WT 6
ユーザ名非公開 · 50問 · 13日前WT 6
WT 6
50問 • 13日前WT 3
WT 3
ユーザ名非公開 · 50問 · 13日前WT 3
WT 3
50問 • 13日前WT 2
WT 2
ユーザ名非公開 · 48問 · 13日前WT 2
WT 2
48問 • 13日前WT 1
WT 1
ユーザ名非公開 · 50問 · 13日前WT 1
WT 1
50問 • 13日前Standpipe Requirements
Standpipe Requirements
ユーザ名非公開 · 29問 · 13日前Standpipe Requirements
Standpipe Requirements
29問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
ユーザ名非公開 · 78問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
78問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
ユーザ名非公開 · 61問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
61問 • 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
ユーザ名非公開 · 36問 · 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
36問 • 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
ユーザ名非公開 · 79問 · 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
79問 • 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
ユーザ名非公開 · 94問 · 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94問 • 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
ユーザ名非公開 · 20問 · 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20問 • 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
ユーザ名非公開 · 10問 · 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
10問 • 13日前問題一覧
1
•gasketed joints, valve stem, and gage glass packing
2
•electrical conductivity of water
3
• The follow-up gear.
4
•rotor clearances
5
•pressure and temperature fluctuations in the entire unit
6
•refrigerant pressure in the evaporator
7
•Line shaft and stern tube shaft
8
•less power output
9
•Fuel direct back to the suction valve of the service pump
10
•it conpares the bridge signal to the actual rudder angle through the follow up gear
11
• Thrust shaft
12
•fuel oil supply pressure
13
•Prior to an increase in power
14
•Control steam admission and maintain the proper steam spray pattern in the DC heater
15
•liquid in the pump will overheat
16
•Its cooling power equals melting 907 kg.(2000 lbs) of ice per day.
17
•before expansion valve
18
•2-stroke engine
19
•mean effective pressure
20
•prevent solid particles from entering the pump.
21
•heat into mechanical energy,
22
•reduce radial thrust on the impeller
23
•cooling water temperature rise
24
•close the recirculating valve when atomizing temperature is reached
25
•reduce the fuel viscosity for proper atomization
26
•The boiler will produce heavy black smoke
27
•remove condensation and other liquids from the cylinders
28
•be unable to maintain steam flow unless the proper range spring were to be installed
29
•Maintain the proper water level at all times
30
•Regulate outlet valve
31
•along the inlet side of the housing
32
•prevent the escape of lubricating oil from the crankcase
33
•Downcomers
34
•Internal water wash
35
•high fuel temperature,
36
•leaky discharge valves on the LP cylinder
37
•Pump barrel
38
•fuel injector
39
•diameter of the impeller
40
•thrust shaft
41
•expansion valve.
42
•the valve bridge is collapse remotely allowing the valve to close
43
•secure the burner valves
44
•increasing the fuel oil heater steam supply
45
•Hunting
46
•suction valve is closed
47
•Distillation is the process of boiling seawater to produce vapor which is condensed into fresh Water
48
•at least two heaters of approximately equal size are to be installed
49
•50%
50
•Vane