問題一覧
1
•Evaporator
2
•the marine shaft or propeller shaft
3
•prevent the formation of air pockets
4
•water in the fuel oil supply
5
•The compactness of gas turbine machinery can be exploited to create extra accomodation
6
•provide wide range of combustion
7
•lowering the pressure of the refrigerant.
8
•Torque
9
•it is an indication of the amount of noncombustble material present in the oil
10
•distortion of the spray pattern
11
•be returning the main pump variable stroke device gradually to neutral stroke just as rudder is achieving command angle
12
•The device should be set to relieve at a pressure not more than 40 percent in excess of the maximum firing pressure
13
•mixing chamber
14
•Filter
15
•using an extended lip formed on one half of the ring and using the upper casing half to trap the lip when the casing is reassembled
16
•strength
17
•an electromagnet
18
•lantern ring
19
•Deadband
20
•turbocharger
21
•Stationary air foil or bladed cone
22
•It decreases
23
•peeling or spalling of the brickwork
24
•decrease to where the pump no longer develops flow
25
•7.5 mm of Hg
26
•removing all but the frictional load during starting
27
•Electric siren
28
•Zinc
29
•The lubricant will carbonize and its lubricating ability will be reduced
30
•close off the discharge valve, and watch for a rise in pressure
31
•Pre-heating
32
•To clear the furnace of any explosive gases
33
•Â Â at rated engine RPM
34
defective intake valves
35
•be at least one size larger than the pump suction connection
36
•check the shaft and impeller assembly on centers to see if the ring surfaces are true
37
•fuel lines
38
•oil impingement in the furnace walls
39
•Adhesion
40
•To purge the furnace
41
•the angularity of the connecting rod against the crosshead during the powr stroke
42
•compressor
43
•quality of water produced
44
•horizontal run of drain line from the lowest point at the outlet of the heat exchanger
45
•pulling out and clean vwith chemical
46
•Vane
47
•Distillate cooler
48
•7 knots
49
•bent shaft
50
•breather or by means of a slight suction not exceeding 1" of water
MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 2
Weekly Test 2
ユーザ名非公開 · 50問 · 13日前Weekly Test 2
Weekly Test 2
50問 • 13日前Weekly Test 1
Weekly Test 1
ユーザ名非公開 · 50問 · 13日前Weekly Test 1
Weekly Test 1
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前Definition of Terms 3
Definition of Terms 3
ユーザ名非公開 · 90問 · 13日前Definition of Terms 3
Definition of Terms 3
90問 • 13日前Definition of Terms 1
Definition of Terms 1
ユーザ名非公開 · 90問 · 13日前Definition of Terms 1
Definition of Terms 1
90問 • 13日前WT 6
WT 6
ユーザ名非公開 · 50問 · 13日前WT 6
WT 6
50問 • 13日前WT 3
WT 3
ユーザ名非公開 · 50問 · 13日前WT 3
WT 3
50問 • 13日前WT 2
WT 2
ユーザ名非公開 · 48問 · 13日前WT 2
WT 2
48問 • 13日前WT 1
WT 1
ユーザ名非公開 · 50問 · 13日前WT 1
WT 1
50問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
ユーザ名非公開 · 78問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
78問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
ユーザ名非公開 · 61問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
61問 • 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
ユーザ名非公開 · 36問 · 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
36問 • 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
ユーザ名非公開 · 79問 · 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
79問 • 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
ユーザ名非公開 · 94問 · 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94問 • 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
ユーザ名非公開 · 20問 · 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20問 • 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
ユーザ名非公開 · 10問 · 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
10問 • 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
ユーザ名非公開 · 11問 · 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
11問 • 13日前問題一覧
1
•Evaporator
2
•the marine shaft or propeller shaft
3
•prevent the formation of air pockets
4
•water in the fuel oil supply
5
•The compactness of gas turbine machinery can be exploited to create extra accomodation
6
•provide wide range of combustion
7
•lowering the pressure of the refrigerant.
8
•Torque
9
•it is an indication of the amount of noncombustble material present in the oil
10
•distortion of the spray pattern
11
•be returning the main pump variable stroke device gradually to neutral stroke just as rudder is achieving command angle
12
•The device should be set to relieve at a pressure not more than 40 percent in excess of the maximum firing pressure
13
•mixing chamber
14
•Filter
15
•using an extended lip formed on one half of the ring and using the upper casing half to trap the lip when the casing is reassembled
16
•strength
17
•an electromagnet
18
•lantern ring
19
•Deadband
20
•turbocharger
21
•Stationary air foil or bladed cone
22
•It decreases
23
•peeling or spalling of the brickwork
24
•decrease to where the pump no longer develops flow
25
•7.5 mm of Hg
26
•removing all but the frictional load during starting
27
•Electric siren
28
•Zinc
29
•The lubricant will carbonize and its lubricating ability will be reduced
30
•close off the discharge valve, and watch for a rise in pressure
31
•Pre-heating
32
•To clear the furnace of any explosive gases
33
•Â Â at rated engine RPM
34
defective intake valves
35
•be at least one size larger than the pump suction connection
36
•check the shaft and impeller assembly on centers to see if the ring surfaces are true
37
•fuel lines
38
•oil impingement in the furnace walls
39
•Adhesion
40
•To purge the furnace
41
•the angularity of the connecting rod against the crosshead during the powr stroke
42
•compressor
43
•quality of water produced
44
•horizontal run of drain line from the lowest point at the outlet of the heat exchanger
45
•pulling out and clean vwith chemical
46
•Vane
47
•Distillate cooler
48
•7 knots
49
•bent shaft
50
•breather or by means of a slight suction not exceeding 1" of water