問題一覧
1
•A dummy piston and cylinder at the turbine inlet end
2
•Serves to mix the air evenly with the fuel
3
•pump cavitations
4
•Provide wide range of combustion
5
•carbon accumulation on the nozzles
6
•That there is an overloading of cylinder
7
•prevent overheating and vapour bound conditions
8
•Carbon deposits will build up in the surfaces
9
•Improper vacuum regulation
10
•free surface effect
11
•accumulating oily substance
12
•Check the setting of temperature controller
13
•moisture formation from condensation
14
•steady boiler load
15
•Heat
16
•a stoppage of condenser cooling water flow
17
heating of the air leaving the cylinders
18
•introduce a control for maintaining constant steam pressure regardless of boiler load
19
•increase compressor efficiency.
20
•expand
21
•grams per horsepower per hour
22
•Fuel oil return valve
23
•outside the space concerned
24
•control air system
25
•viscosity
26
•support and seal the propeller shaft
27
•spring force
28
•upside down Strainer needs cleaning
29
•gums, varnishes, and acids
30
•shift pump suction to an alternate settling tank
31
•To prevent solid particles from entering the pump
32
•the full breaking strength of the mooring line
33
•Off-line washing
34
•Fail to work but the compressor having no load will start with little or no difficulty
35
•injector nozzles
36
•fluidity of the lubricant
37
•means of heating the feedwater
38
•hold the nozzle of the stage and admit steam to moving blades
39
•Pressure switch
40
•Swift start up, no warm up or idling period is required.
41
•The steam expands in volume
42
•air vent valve open and clear
43
•Small, high speed
44
•It compares the bridge signal to the actual rudder angle through the follow up gear
45
•Secure the boiler fires
46
•feedwater vapor pressure
47
•equal to atmospheric pressure
48
•Sulphur
49
•Improper vacuum
50
•erratic rudder response
MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 2
Weekly Test 2
ユーザ名非公開 · 50問 · 13日前Weekly Test 2
Weekly Test 2
50問 • 13日前Weekly Test 1
Weekly Test 1
ユーザ名非公開 · 50問 · 13日前Weekly Test 1
Weekly Test 1
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前Definition of Terms 3
Definition of Terms 3
ユーザ名非公開 · 90問 · 13日前Definition of Terms 3
Definition of Terms 3
90問 • 13日前Definition of Terms 1
Definition of Terms 1
ユーザ名非公開 · 90問 · 13日前Definition of Terms 1
Definition of Terms 1
90問 • 13日前WT 6
WT 6
ユーザ名非公開 · 50問 · 13日前WT 6
WT 6
50問 • 13日前WT 3
WT 3
ユーザ名非公開 · 50問 · 13日前WT 3
WT 3
50問 • 13日前WT 2
WT 2
ユーザ名非公開 · 48問 · 13日前WT 2
WT 2
48問 • 13日前WT 1
WT 1
ユーザ名非公開 · 50問 · 13日前WT 1
WT 1
50問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
ユーザ名非公開 · 78問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
78問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
ユーザ名非公開 · 61問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
61問 • 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
ユーザ名非公開 · 36問 · 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
36問 • 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
ユーザ名非公開 · 79問 · 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
79問 • 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
ユーザ名非公開 · 94問 · 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94問 • 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
ユーザ名非公開 · 20問 · 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20問 • 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
ユーザ名非公開 · 10問 · 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
10問 • 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
ユーザ名非公開 · 11問 · 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
11問 • 13日前問題一覧
1
•A dummy piston and cylinder at the turbine inlet end
2
•Serves to mix the air evenly with the fuel
3
•pump cavitations
4
•Provide wide range of combustion
5
•carbon accumulation on the nozzles
6
•That there is an overloading of cylinder
7
•prevent overheating and vapour bound conditions
8
•Carbon deposits will build up in the surfaces
9
•Improper vacuum regulation
10
•free surface effect
11
•accumulating oily substance
12
•Check the setting of temperature controller
13
•moisture formation from condensation
14
•steady boiler load
15
•Heat
16
•a stoppage of condenser cooling water flow
17
heating of the air leaving the cylinders
18
•introduce a control for maintaining constant steam pressure regardless of boiler load
19
•increase compressor efficiency.
20
•expand
21
•grams per horsepower per hour
22
•Fuel oil return valve
23
•outside the space concerned
24
•control air system
25
•viscosity
26
•support and seal the propeller shaft
27
•spring force
28
•upside down Strainer needs cleaning
29
•gums, varnishes, and acids
30
•shift pump suction to an alternate settling tank
31
•To prevent solid particles from entering the pump
32
•the full breaking strength of the mooring line
33
•Off-line washing
34
•Fail to work but the compressor having no load will start with little or no difficulty
35
•injector nozzles
36
•fluidity of the lubricant
37
•means of heating the feedwater
38
•hold the nozzle of the stage and admit steam to moving blades
39
•Pressure switch
40
•Swift start up, no warm up or idling period is required.
41
•The steam expands in volume
42
•air vent valve open and clear
43
•Small, high speed
44
•It compares the bridge signal to the actual rudder angle through the follow up gear
45
•Secure the boiler fires
46
•feedwater vapor pressure
47
•equal to atmospheric pressure
48
•Sulphur
49
•Improper vacuum
50
•erratic rudder response