ログイン

AIRLAW3.0
39問 • 1年前
  • ユーザ名非公開
  • 通報

    問題一覧

  • 1

    In accordance with table of sanction under PCAR' part 1, the penalty for "improperly releasing an aircraft to service " is

    30 to 60 Days Suspension

  • 2

    Duration of AMT License is

    5 Years

  • 3

    Practical Experience

    Airframe Rating 30 Months

  • 4

    Practical Experience

    Powerplant Rating 30 Months

  • 5

    Practical Experience

    Airframe and Powerplant Rating 60 Months

  • 6

    Approved Training

    Airframe Rating 24 Months

  • 7

    Approved Training

    Powerplant Rating 24 Months

  • 8

    Approved Training

    Airframe and Powerplant Rating 30 Months

  • 9

    The restoration of an aircraft/aeronautical product using methods, techniques, and practices acceptable to the Authority, when it has been disassembled, cleaned, inspected as permitted, repaired as necessary.

    Rebulld

  • 10

    Without certificate

    Maximum civil penalty

  • 11

    Falsification of maintenance records

    Revocation

  • 12

    An applicant for an AMT license and associated ratings may qualify by either

    Practical Experience

  • 13

    Each applicant for an AMT license relying on completion of training in an Approved Training Organization (ATO)

    Approved Training

  • 14

    A document which describes the specific scheduled maintenance tasks and their frequency of completion and related procedures, such as a reliability programme, necessary for the safe operation of those aircraft to which it applies.

    Maintenance program

  • 15

    A certification confirming that the maintenance work to which it relates has been complied with in accordance with the applicable standards of airworthiness, using approved data.

    Maintenance release

  • 16

    The State having jurisdiction over the organization responsible for the final assembly of the aircraft, engine or propeller.

    State of Manufacturer

  • 17

    The State on whose register the aircraft is entered.

    State of Register

  • 18

    The set of processes by which an aircraft, engine, propeller or part complies with the applicable airworthiness requirements and remains in a condition for safe operation throughout its operating life.

    Continuing Airworthiness

  • 19

    The alteration of an aircraft/aeronautical product in conformity with an approved standard.

    Modification

  • 20

    Simple or minor preservation operations and the replacement of small standard parts, not involving complex assembly operations, described in IS: 5.1.1.2(a)(5).

    Preventive Maintenance

  • 21

    The restoration of an aircraft/aeronautical product using methods, techniques, and practices acceptable to the Authority, including disassembly, cleaning, and inspection as permitted, repair as necessary, and reassembly; and tested in accordance with approved standards and technical data, or to the Authority.

    Overhaul

  • 22

    When used for commercial or aerial work operations every

    3 Years

  • 23

    When used in general aviation every

    5 Years

  • 24

    No person may assign, nor shall any person perform maintenance functions for aircraft, unless that person has had a minimum rest period of

    8 Hours

  • 25

    No person may schedule a person performing maintenance functions for aircraft for more than

    12 Consecutive Hours

  • 26

    Following unscheduled duty periods, the person performing maintenance functions for aircraft shall have a mandatory rest period of

    10 Hours

  • 27

    Exceeding Limitations

    30 to 45 Days Suspension

  • 28

    Failure to properly perform maintenance

    30 to 120 Days Suspension

  • 29

    Releasing aircraft for service without required equipment.

    30 to 60 Days Suspension

  • 30

    Failure to use pre-flight cockpit checklist

    15 to 30 Days Suspension

  • 31

    Failure to check aircraft logs, flight manifest, weather, etc.

    30 to 90 Days Suspension

  • 32

    Failure to revise aircraft data after major repairs or alterations

    30 to 60 Days Suspension

  • 33

    Renewal before license expire

    30 Days

  • 34

    Associate to Complete off

    60 Months

  • 35

    Training conducted under special curricula and supervision approved by the Authority.

    Approved training

  • 36

    An organization approved by and operating under the supervision of this Authority accordance with the requirements of PCAR to perform approved training

    Approved training organization

  • 37

    An organization approved by the Philippine authority, in accordance with the requirements of Annex 6, Part I, Chapter 8 - Aeroplane Maintenance, to perform maintenance of aircraft or parts thereof and operating under supervision approved by the Philippine Republic.

    Approved maintenance organization

  • 38

    The performance of tasks required to ensure the continuing airworthiness of an aircraft, including any one or combination of overhaul, inspection, replacement, defect rectification, and the embodiment of a modification or repair.

    Maintenance

  • 39

    Removal accessories that are listed as required equipment on the aircraft or engine specifications is an example of

    Powerplant Major Modification

  • wood structure

    wood structure

    ユーザ名非公開 · 16問 · 1年前

    wood structure

    wood structure

    16問 • 1年前
    ユーザ名非公開

    assembly and rigging

    assembly and rigging

    ユーザ名非公開 · 78問 · 1年前

    assembly and rigging

    assembly and rigging

    78問 • 1年前
    ユーザ名非公開

    aircraft finishes

    aircraft finishes

    ユーザ名非公開 · 15問 · 1年前

    aircraft finishes

    aircraft finishes

    15問 • 1年前
    ユーザ名非公開

    basic electricity

    basic electricity

    ユーザ名非公開 · 80問 · 1年前

    basic electricity

    basic electricity

    80問 • 1年前
    ユーザ名非公開

    maintenance forms and record

    maintenance forms and record

    ユーザ名非公開 · 36問 · 1年前

    maintenance forms and record

    maintenance forms and record

    36問 • 1年前
    ユーザ名非公開

    wood structure

    wood structure

    ユーザ名非公開 · 16問 · 1年前

    wood structure

    wood structure

    16問 • 1年前
    ユーザ名非公開

    wood structure

    wood structure

    ユーザ名非公開 · 16問 · 1年前

    wood structure

    wood structure

    16問 • 1年前
    ユーザ名非公開

    FUEL METERING SYSTEM

    FUEL METERING SYSTEM

    ユーザ名非公開 · 95問 · 1年前

    FUEL METERING SYSTEM

    FUEL METERING SYSTEM

    95問 • 1年前
    ユーザ名非公開

    AC main

    AC main

    ユーザ名非公開 · 40問 · 1年前

    AC main

    AC main

    40問 • 1年前
    ユーザ名非公開

    INDUCTION AND ENGINE FLOW SYSTEM

    INDUCTION AND ENGINE FLOW SYSTEM

    ユーザ名非公開 · 39問 · 1年前

    INDUCTION AND ENGINE FLOW SYSTEM

    INDUCTION AND ENGINE FLOW SYSTEM

    39問 • 1年前
    ユーザ名非公開

    AIRLAW

    AIRLAW

    ユーザ名非公開 · 100問 · 1年前

    AIRLAW

    AIRLAW

    100問 • 1年前
    ユーザ名非公開

    AIRLAW 2.0

    AIRLAW 2.0

    ユーザ名非公開 · 32問 · 1年前

    AIRLAW 2.0

    AIRLAW 2.0

    32問 • 1年前
    ユーザ名非公開

    問題一覧

  • 1

    In accordance with table of sanction under PCAR' part 1, the penalty for "improperly releasing an aircraft to service " is

    30 to 60 Days Suspension

  • 2

    Duration of AMT License is

    5 Years

  • 3

    Practical Experience

    Airframe Rating 30 Months

  • 4

    Practical Experience

    Powerplant Rating 30 Months

  • 5

    Practical Experience

    Airframe and Powerplant Rating 60 Months

  • 6

    Approved Training

    Airframe Rating 24 Months

  • 7

    Approved Training

    Powerplant Rating 24 Months

  • 8

    Approved Training

    Airframe and Powerplant Rating 30 Months

  • 9

    The restoration of an aircraft/aeronautical product using methods, techniques, and practices acceptable to the Authority, when it has been disassembled, cleaned, inspected as permitted, repaired as necessary.

    Rebulld

  • 10

    Without certificate

    Maximum civil penalty

  • 11

    Falsification of maintenance records

    Revocation

  • 12

    An applicant for an AMT license and associated ratings may qualify by either

    Practical Experience

  • 13

    Each applicant for an AMT license relying on completion of training in an Approved Training Organization (ATO)

    Approved Training

  • 14

    A document which describes the specific scheduled maintenance tasks and their frequency of completion and related procedures, such as a reliability programme, necessary for the safe operation of those aircraft to which it applies.

    Maintenance program

  • 15

    A certification confirming that the maintenance work to which it relates has been complied with in accordance with the applicable standards of airworthiness, using approved data.

    Maintenance release

  • 16

    The State having jurisdiction over the organization responsible for the final assembly of the aircraft, engine or propeller.

    State of Manufacturer

  • 17

    The State on whose register the aircraft is entered.

    State of Register

  • 18

    The set of processes by which an aircraft, engine, propeller or part complies with the applicable airworthiness requirements and remains in a condition for safe operation throughout its operating life.

    Continuing Airworthiness

  • 19

    The alteration of an aircraft/aeronautical product in conformity with an approved standard.

    Modification

  • 20

    Simple or minor preservation operations and the replacement of small standard parts, not involving complex assembly operations, described in IS: 5.1.1.2(a)(5).

    Preventive Maintenance

  • 21

    The restoration of an aircraft/aeronautical product using methods, techniques, and practices acceptable to the Authority, including disassembly, cleaning, and inspection as permitted, repair as necessary, and reassembly; and tested in accordance with approved standards and technical data, or to the Authority.

    Overhaul

  • 22

    When used for commercial or aerial work operations every

    3 Years

  • 23

    When used in general aviation every

    5 Years

  • 24

    No person may assign, nor shall any person perform maintenance functions for aircraft, unless that person has had a minimum rest period of

    8 Hours

  • 25

    No person may schedule a person performing maintenance functions for aircraft for more than

    12 Consecutive Hours

  • 26

    Following unscheduled duty periods, the person performing maintenance functions for aircraft shall have a mandatory rest period of

    10 Hours

  • 27

    Exceeding Limitations

    30 to 45 Days Suspension

  • 28

    Failure to properly perform maintenance

    30 to 120 Days Suspension

  • 29

    Releasing aircraft for service without required equipment.

    30 to 60 Days Suspension

  • 30

    Failure to use pre-flight cockpit checklist

    15 to 30 Days Suspension

  • 31

    Failure to check aircraft logs, flight manifest, weather, etc.

    30 to 90 Days Suspension

  • 32

    Failure to revise aircraft data after major repairs or alterations

    30 to 60 Days Suspension

  • 33

    Renewal before license expire

    30 Days

  • 34

    Associate to Complete off

    60 Months

  • 35

    Training conducted under special curricula and supervision approved by the Authority.

    Approved training

  • 36

    An organization approved by and operating under the supervision of this Authority accordance with the requirements of PCAR to perform approved training

    Approved training organization

  • 37

    An organization approved by the Philippine authority, in accordance with the requirements of Annex 6, Part I, Chapter 8 - Aeroplane Maintenance, to perform maintenance of aircraft or parts thereof and operating under supervision approved by the Philippine Republic.

    Approved maintenance organization

  • 38

    The performance of tasks required to ensure the continuing airworthiness of an aircraft, including any one or combination of overhaul, inspection, replacement, defect rectification, and the embodiment of a modification or repair.

    Maintenance

  • 39

    Removal accessories that are listed as required equipment on the aircraft or engine specifications is an example of

    Powerplant Major Modification