問題一覧
1
According to the video, approximately how many tornadoes occur in the U.S. each year?
1000
2
Mistakes made in reading the __ can translate to mistakes in the layout of the slab, footings, or basement which will have an impact on the all framing and wall dimensions will need to be modified
foundation plan
3
How many U.S. states are at risk for earthquakes?
39
4
When reading the site plans, what can help you calculate the distance of the house?
dimension lines
5
How thick are the foundation walls on the referenced foundation plan?
8 inches
6
When calculating, break concrete into sections to avoid
calculating corners twice
7
When calculating for concrete
round up to the next cubic yard
8
With 12 ft long plates, the anchor bolts will need to be
both A and B
9
How many total trusses are needed for the 24 foot garage in the plan?
13
10
On average, what percent should you add to your overhead costs for mark up?
20%
11
When calculating labor costs for various subcontractors, use a(n) ___ to help
estimating program
12
The last step in calculating your total cost of the job is to add in your percent of
profit
13
What is referred to as your cost of materials and labor, not including overhead or profit
direct cost
14
One way to reduce overhead in order to stay competitive as a general contractor is to
do away with office space and work from home
15
Who issues a subpeona?
the circuit court
16
Once a pemit is issued, how many days after issue do you have to begin work?
180
17
What is a reference point on your site plan that relates to elevations?
benchmark
18
What is the minimun R value for wall insulation for exterior walls?
R 20
19
A living room is required to be built to a live load of how many pounds?
40
20
Select which are poisonous plants in Michigan
poisonous hemlock, wild parsnip, giant hogweed, poison oak, poison ivy
21
what is official survey
shows boundary of property
22
what is deed
Evidence of ownership
23
what is an abstract of Title
A history of the deeds in other papers affecting the ownership of the property
24
contract of sale or sales contract is what
describes all the details related to the purchase
25
what is on the first load
All items needed to complete the house up to and including the subfloor
26
what is on the second load
wall framing and ceiling joist
27
what is on the third load
roof framing materials and roof coverings if roof trusses are used these will be shipped to the site on a special truck this truck sometimes has a crane to lift trust into position
28
what is on the fourth load
exterior doors windows exterior trim and siding as needed. After the house has been enclosed with doors and windows and can be locked up interior wall finish is applied
29
what is on the fifth load
hardwood flooring and underlayment material
30
what is on the sixth load
interior doors trim and built-in cabinets materials