construction 8
問題一覧
1
metal flashing
2
stucco
3
a brick-veneer wall
4
firebrick
5
makeup air
6
hearth
7
cut-stringer stairway
8
30 degrees
9
Either A or B
10
18 to 20
11
a drain field
12
loose-fill insulation
13
a vapor retarder
14
the entire area of the house that is insulated
15
go degrees/perpendicular
16
Sound Transmission Class (STC)
17
5/8"
18
a suspended ceiling
19
a flagged bristle paintbrush
20
1/4”
21
precast
22
a frost-proof hose bib
23
tapcons
24
an enlarged landing at the top of the steps
25
that was a code change from the previous code cycle for Michigan ONLY
26
is law
27
do alterations without having a builder's license
28
the NER reports (National Evaluation Reports)
29
all of the above
30
be available on the jobsite at the time of inspection
construction
construction
Sterling Thomas · 40問 · 2年前construction
construction
40問 • 2年前construction 1.25
construction 1.25
Sterling Thomas · 20問 · 2年前construction 1.25
construction 1.25
20問 • 2年前construction 1.5
construction 1.5
Sterling Thomas · 20問 · 2年前construction 1.5
construction 1.5
20問 • 2年前construction 1.75
construction 1.75
Sterling Thomas · 20問 · 2年前construction 1.75
construction 1.75
20問 • 2年前construction 2
construction 2
Sterling Thomas · 34問 · 2年前construction 2
construction 2
34問 • 2年前construction 2.25
construction 2.25
Sterling Thomas · 30問 · 2年前construction 2.25
construction 2.25
30問 • 2年前construction 2.5
construction 2.5
Sterling Thomas · 30問 · 2年前construction 2.5
construction 2.5
30問 • 2年前construction 3
construction 3
Sterling Thomas · 29問 · 2年前construction 3
construction 3
29問 • 2年前construction 4
construction 4
Sterling Thomas · 25問 · 2年前construction 4
construction 4
25問 • 2年前construction 4.5
construction 4.5
Sterling Thomas · 24問 · 2年前construction 4.5
construction 4.5
24問 • 2年前construction 5
construction 5
Sterling Thomas · 34問 · 2年前construction 5
construction 5
34問 • 2年前construction 5.25
construction 5.25
Sterling Thomas · 33問 · 2年前construction 5.25
construction 5.25
33問 • 2年前construction 5.5
construction 5.5
Sterling Thomas · 33問 · 2年前construction 5.5
construction 5.5
33問 • 2年前Identify
Identify
Sterling Thomas · 32問 · 2年前Identify
Identify
32問 • 2年前construction 6
construction 6
Sterling Thomas · 28問 · 2年前construction 6
construction 6
28問 • 2年前construction 7
construction 7
Sterling Thomas · 30問 · 2年前construction 7
construction 7
30問 • 2年前construction 9
construction 9
Sterling Thomas · 29問 · 2年前construction 9
construction 9
29問 • 2年前construction 10
construction 10
Sterling Thomas · 35問 · 2年前construction 10
construction 10
35問 • 2年前construction 11
construction 11
Sterling Thomas · 30問 · 2年前construction 11
construction 11
30問 • 2年前construction 12
construction 12
Sterling Thomas · 30問 · 2年前construction 12
construction 12
30問 • 2年前Identify 2
Identify 2
Sterling Thomas · 22問 · 1年前Identify 2
Identify 2
22問 • 1年前construction 13
construction 13
Sterling Thomas · 30問 · 1年前construction 13
construction 13
30問 • 1年前Identify 3
Identify 3
Sterling Thomas · 35問 · 1年前Identify 3
Identify 3
35問 • 1年前construction 14
construction 14
Sterling Thomas · 30問 · 1年前construction 14
construction 14
30問 • 1年前問題一覧
1
metal flashing
2
stucco
3
a brick-veneer wall
4
firebrick
5
makeup air
6
hearth
7
cut-stringer stairway
8
30 degrees
9
Either A or B
10
18 to 20
11
a drain field
12
loose-fill insulation
13
a vapor retarder
14
the entire area of the house that is insulated
15
go degrees/perpendicular
16
Sound Transmission Class (STC)
17
5/8"
18
a suspended ceiling
19
a flagged bristle paintbrush
20
1/4”
21
precast
22
a frost-proof hose bib
23
tapcons
24
an enlarged landing at the top of the steps
25
that was a code change from the previous code cycle for Michigan ONLY
26
is law
27
do alterations without having a builder's license
28
the NER reports (National Evaluation Reports)
29
all of the above
30
be available on the jobsite at the time of inspection