ログイン

construction 13

construction 13
30問 • 1年前
  • Sterling Thomas
  • 通報

    問題一覧

  • 1

    what type of materials must floats be made from

    aluminum, magnesium

  • 2

    what is maximum backfill that can go around a tree

    1’

  • 3

    what is the layer of living tissue that creates new wood called sapwood along the inner surface

    cambium

  • 4

    if pilles sawdust was found on sill plate what insect would you be most likely be looking at

    carpenter ants

  • 5

    LVL’s generally come in what thckeness

    1 3/4”

  • 6

    camber (curve) is located where

    upwards

  • 7

    what should the nail pattern be for wall sheathing

    6” on edge/12” in the field

  • 8

    the building code requires that the total area of window glass in a room should b not less than ___% of th floor area. the opening for ventilation shouldn’t be less than ___%

    8%/4%

  • 9

    Eaves protection should extend from the end of a eaves to a point at least ___ inside EXTERIOR wall line of the house

    24”

  • 10

    After providing goods and/or services how long does a contractor or supplier have to submit notice of furnishing

    20 days

  • 11

    claim a lien must be filled within ___ days of last furnishing labor or materials for a project

    90

  • 12

    a copy of claim of lien must be provided to responsible party or parties within ___ days

    15

  • 13

    Proceedings to foreclose must take place within ____ of The date the claim lien was recorded

    1 year

  • 14

    discharge of lien must take place

    as soon as possible

  • 15

    what is maximum riser hight and minimum tread depth

    8 1/4 : 9

  • 16

    act 227 where are the penalties for not following this act

    C: provides a fine of not more than six months or not more than $500 or both

  • 17

    what does act 227 pertain to

    Home solicitation

  • 18

    builders need ___ to pay for small expenses that arise day to day

    petty cash

  • 19

    rent, phone, utilities and office supplies are considered ___ expenses

    over head

  • 20

    ___ must be presented when apply for preformance bonds and for loan applications

    Financial statements

  • 21

    ____ is the simplest bookkeeping method used

    Double entry

  • 22

    A ___ is entered on the left side of a T-account

    Debit

  • 23

    a general ledger

    all of the above

  • 24

    Concrete gained 60% to 70% of his strength in how many days

    7 days

  • 25

    footings should be far enough for the finish grade to protect from frost. what depth is that in Michigan??

    42”

  • 26

    a horizontal joint is called what?

    bed joint

  • 27

    A tree that sheds its leaves annually during colder very dry seasons in the United States and other countries with temperate climates most broadleaved trees are ____ and lose their leaves in the fall

    deciduous

  • 28

    A tree that produces seeds and cones and has a needle like or scale like leaves

    carnivorous

  • 29

    fiber saturation point occurs when the word contains about ___ percent moisture though this number can vary

    28

  • 30

    Subterranean termites account for about ___ percent of all termite damage

    95

  • construction

    construction

    Sterling Thomas · 40問 · 2年前

    construction

    construction

    40問 • 2年前
    Sterling Thomas

    construction 1.25

    construction 1.25

    Sterling Thomas · 20問 · 2年前

    construction 1.25

    construction 1.25

    20問 • 2年前
    Sterling Thomas

    construction 1.5

    construction 1.5

    Sterling Thomas · 20問 · 2年前

    construction 1.5

    construction 1.5

    20問 • 2年前
    Sterling Thomas

    construction 1.75

    construction 1.75

    Sterling Thomas · 20問 · 2年前

    construction 1.75

    construction 1.75

    20問 • 2年前
    Sterling Thomas

    construction 2

    construction 2

    Sterling Thomas · 34問 · 2年前

    construction 2

    construction 2

    34問 • 2年前
    Sterling Thomas

    construction 2.25

    construction 2.25

    Sterling Thomas · 30問 · 2年前

    construction 2.25

    construction 2.25

    30問 • 2年前
    Sterling Thomas

    construction 2.5

    construction 2.5

    Sterling Thomas · 30問 · 2年前

    construction 2.5

    construction 2.5

    30問 • 2年前
    Sterling Thomas

    construction 3

    construction 3

    Sterling Thomas · 29問 · 2年前

    construction 3

    construction 3

    29問 • 2年前
    Sterling Thomas

    construction 4

    construction 4

    Sterling Thomas · 25問 · 2年前

    construction 4

    construction 4

    25問 • 2年前
    Sterling Thomas

    construction 4.5

    construction 4.5

    Sterling Thomas · 24問 · 2年前

    construction 4.5

    construction 4.5

    24問 • 2年前
    Sterling Thomas

    construction 5

    construction 5

    Sterling Thomas · 34問 · 2年前

    construction 5

    construction 5

    34問 • 2年前
    Sterling Thomas

    construction 5.25

    construction 5.25

    Sterling Thomas · 33問 · 2年前

    construction 5.25

    construction 5.25

    33問 • 2年前
    Sterling Thomas

    construction 5.5

    construction 5.5

    Sterling Thomas · 33問 · 2年前

    construction 5.5

    construction 5.5

    33問 • 2年前
    Sterling Thomas

    Identify

    Identify

    Sterling Thomas · 32問 · 2年前

    Identify

    Identify

    32問 • 2年前
    Sterling Thomas

    construction 6

    construction 6

    Sterling Thomas · 28問 · 2年前

    construction 6

    construction 6

    28問 • 2年前
    Sterling Thomas

    construction 7

    construction 7

    Sterling Thomas · 30問 · 2年前

    construction 7

    construction 7

    30問 • 2年前
    Sterling Thomas

    construction 8

    construction 8

    Sterling Thomas · 30問 · 2年前

    construction 8

    construction 8

    30問 • 2年前
    Sterling Thomas

    construction 9

    construction 9

    Sterling Thomas · 29問 · 2年前

    construction 9

    construction 9

    29問 • 2年前
    Sterling Thomas

    construction 10

    construction 10

    Sterling Thomas · 35問 · 2年前

    construction 10

    construction 10

    35問 • 2年前
    Sterling Thomas

    construction 11

    construction 11

    Sterling Thomas · 30問 · 2年前

    construction 11

    construction 11

    30問 • 2年前
    Sterling Thomas

    construction 12

    construction 12

    Sterling Thomas · 30問 · 2年前

    construction 12

    construction 12

    30問 • 2年前
    Sterling Thomas

    Identify 2

    Identify 2

    Sterling Thomas · 22問 · 1年前

    Identify 2

    Identify 2

    22問 • 1年前
    Sterling Thomas

    Identify 3

    Identify 3

    Sterling Thomas · 35問 · 1年前

    Identify 3

    Identify 3

    35問 • 1年前
    Sterling Thomas

    construction 14

    construction 14

    Sterling Thomas · 30問 · 1年前

    construction 14

    construction 14

    30問 • 1年前
    Sterling Thomas

    問題一覧

  • 1

    what type of materials must floats be made from

    aluminum, magnesium

  • 2

    what is maximum backfill that can go around a tree

    1’

  • 3

    what is the layer of living tissue that creates new wood called sapwood along the inner surface

    cambium

  • 4

    if pilles sawdust was found on sill plate what insect would you be most likely be looking at

    carpenter ants

  • 5

    LVL’s generally come in what thckeness

    1 3/4”

  • 6

    camber (curve) is located where

    upwards

  • 7

    what should the nail pattern be for wall sheathing

    6” on edge/12” in the field

  • 8

    the building code requires that the total area of window glass in a room should b not less than ___% of th floor area. the opening for ventilation shouldn’t be less than ___%

    8%/4%

  • 9

    Eaves protection should extend from the end of a eaves to a point at least ___ inside EXTERIOR wall line of the house

    24”

  • 10

    After providing goods and/or services how long does a contractor or supplier have to submit notice of furnishing

    20 days

  • 11

    claim a lien must be filled within ___ days of last furnishing labor or materials for a project

    90

  • 12

    a copy of claim of lien must be provided to responsible party or parties within ___ days

    15

  • 13

    Proceedings to foreclose must take place within ____ of The date the claim lien was recorded

    1 year

  • 14

    discharge of lien must take place

    as soon as possible

  • 15

    what is maximum riser hight and minimum tread depth

    8 1/4 : 9

  • 16

    act 227 where are the penalties for not following this act

    C: provides a fine of not more than six months or not more than $500 or both

  • 17

    what does act 227 pertain to

    Home solicitation

  • 18

    builders need ___ to pay for small expenses that arise day to day

    petty cash

  • 19

    rent, phone, utilities and office supplies are considered ___ expenses

    over head

  • 20

    ___ must be presented when apply for preformance bonds and for loan applications

    Financial statements

  • 21

    ____ is the simplest bookkeeping method used

    Double entry

  • 22

    A ___ is entered on the left side of a T-account

    Debit

  • 23

    a general ledger

    all of the above

  • 24

    Concrete gained 60% to 70% of his strength in how many days

    7 days

  • 25

    footings should be far enough for the finish grade to protect from frost. what depth is that in Michigan??

    42”

  • 26

    a horizontal joint is called what?

    bed joint

  • 27

    A tree that sheds its leaves annually during colder very dry seasons in the United States and other countries with temperate climates most broadleaved trees are ____ and lose their leaves in the fall

    deciduous

  • 28

    A tree that produces seeds and cones and has a needle like or scale like leaves

    carnivorous

  • 29

    fiber saturation point occurs when the word contains about ___ percent moisture though this number can vary

    28

  • 30

    Subterranean termites account for about ___ percent of all termite damage

    95