BLDG LAWS & PROFPRAC PREBOARD 2
問題一覧
1
925mm
2
50m
3
250mm
4
2.40m
5
800mm
6
30 degrees from horizontal
7
800mm
8
2.00m
9
none of the choices
10
general conditions
11
furnish
12
install
13
provide
14
the contractor
15
the owner
16
the specs
17
all of the choices
18
2.40m
19
0.65sqm
20
6.00m
21
partnership
22
ownership
23
the PRBArch
24
3/4
25
70%
26
the IAPOA must be registered with the DTI and the PRBOA
27
they shall not be affected
28
the contractor
29
the filipino counterpart
30
the UAP as the IAPOA
31
marriage contract in NSO security paper for married male applicants
32
copyright
33
consulting architect
34
when the Certificate of Completion is issued
35
when the amount of completed work is equal to 98% or more of the contract amount
36
none of the choices
37
paymend bond
38
56sqm
39
Group H buildings without stage whose seating capacity is less than 500
40
750mm
41
the contractor and the construction supervisor
42
a fence only
43
automatic fire suppression system
44
all of these persons are violating RA 9266
45
none of this is true
46
all of the choices
47
perfomance bond
48
10% of the floor area but not less than 1sqm
49
3
50
10.00m
51
1:20
52
dry standpipe
53
fire alarm
54
70% max saleable, 30% min non-saleable
55
a pathway length of up to 60.00m is allowed
56
Class K
57
3.5% of gross area
58
complete house
59
monitoring of maintenance and upkeep services of the building
60
post-construction services
61
Group 6
62
90% of his work
63
a greenhouse that measures 2 x 3 meters only
64
yes, as long as the building official issues the ground preparation and excavation permit and as long as the owner follows the corresponding rules/requirements
65
11.10 sqm
66
9.30 sqm
67
only one
68
all of these are allowed by SPP 201
69
comprehensive development planning
70
the projects manager's
71
the architect
72
the contractor
73
comprehensive architectural services?
74
feasibility studies
75
it is doubled
76
allowed on both sides of the property or on one side and the rear
77
BP 220
78
5.00 m
79
1.50 m
80
700mm and 900mm
81
car inside dimensions of 1.10m x 1.40m
82
800-1200mm from the floor
83
a block 500 m long a 200 m wide alley approximately at the center
84
sprinkler system
85
3.00m x 5.00m
86
conduct seminars and workshops as part of the continuing professional development (cpd) program and as an automatic cpd provider
87
removing "site planning" from the syllabus of the exam. this subject should be included because it is extremely important in architecture
88
an architect who has never been convicted of crimes involving moral turniptude and who has plenty of related experience as current chairman of the philippine institute of architects
89
yes, because this is one of the methods of rendering design-build services according to the SPP
90
section 33 of RA 9266
91
the contractor still needs to rectify it because it is inferior work, at no cost to the owner.
92
an architect who credits half of his commission from the supplier to the owner's bill (to add to the owner's discount)
93
solid and liquid waste disposal, parks and playgrounds, power
94
a level area not less than 1.80m in length
95
yes, if the building official grants a partial certificate of occupancy to the owner
96
balconies with an area of 5sqm
97
only when the gift will not cloud the architect's judgment and objectivity
98
an architect who accepts a commission to remodel a building after notifying the original architect of the commission and ensuring that the previous architect's contract was properly terminated
99
the intellectual property for the design remains the same because the construction of the project is irrelevant to intellectual property
100
min dimension of 1.50m, center-to-center distance of 13.50m
Architect Dictums and Philosophies
Architect Dictums and Philosophies
LazyXKing · 90問 · 1年前Architect Dictums and Philosophies
Architect Dictums and Philosophies
90問 • 1年前FIRE PROTECTION 1
FIRE PROTECTION 1
LazyXKing · 100問 · 1年前FIRE PROTECTION 1
FIRE PROTECTION 1
100問 • 1年前FIRE PROTECTION 2
FIRE PROTECTION 2
LazyXKing · 46問 · 1年前FIRE PROTECTION 2
FIRE PROTECTION 2
46問 • 1年前DAY 01am-part1
DAY 01am-part1
LazyXKing · 53問 · 1年前DAY 01am-part1
DAY 01am-part1
53問 • 1年前DAY 01 pm-part1
DAY 01 pm-part1
LazyXKing · 100問 · 1年前DAY 01 pm-part1
DAY 01 pm-part1
100問 • 1年前DAY 01 pm-part2
DAY 01 pm-part2
LazyXKing · 100問 · 1年前DAY 01 pm-part2
DAY 01 pm-part2
100問 • 1年前DAY 01 pm-part3
DAY 01 pm-part3
LazyXKing · 99問 · 1年前DAY 01 pm-part3
DAY 01 pm-part3
99問 • 1年前RA 9266
RA 9266
LazyXKing · 30問 · 1年前RA 9266
RA 9266
30問 • 1年前BLDG LAWS & PROFPRAC PREBOARD 1
BLDG LAWS & PROFPRAC PREBOARD 1
LazyXKing · 100問 · 1年前BLDG LAWS & PROFPRAC PREBOARD 1
BLDG LAWS & PROFPRAC PREBOARD 1
100問 • 1年前BLDG LAWS & PROFPRAC PREBOARD 3
BLDG LAWS & PROFPRAC PREBOARD 3
LazyXKing · 45問 · 1年前BLDG LAWS & PROFPRAC PREBOARD 3
BLDG LAWS & PROFPRAC PREBOARD 3
45問 • 1年前BLDG LAWS & PROFPRAC PREBOARD 4
BLDG LAWS & PROFPRAC PREBOARD 4
LazyXKing · 97問 · 1年前BLDG LAWS & PROFPRAC PREBOARD 4
BLDG LAWS & PROFPRAC PREBOARD 4
97問 • 1年前VERNACULAR TERMS o1
VERNACULAR TERMS o1
LazyXKing · 86問 · 1年前VERNACULAR TERMS o1
VERNACULAR TERMS o1
86問 • 1年前VERNACULAR TERMS o2
VERNACULAR TERMS o2
LazyXKing · 98問 · 1年前VERNACULAR TERMS o2
VERNACULAR TERMS o2
98問 • 1年前VERNACULAR TERMS o3
VERNACULAR TERMS o3
LazyXKing · 100問 · 1年前VERNACULAR TERMS o3
VERNACULAR TERMS o3
100問 • 1年前VERNACULAR TERMS o4
VERNACULAR TERMS o4
LazyXKing · 53問 · 1年前VERNACULAR TERMS o4
VERNACULAR TERMS o4
53問 • 1年前HOA RANDOMS MST 01
HOA RANDOMS MST 01
LazyXKing · 100問 · 1年前HOA RANDOMS MST 01
HOA RANDOMS MST 01
100問 • 1年前HOA RANDOMS MST 02
HOA RANDOMS MST 02
LazyXKing · 100問 · 1年前HOA RANDOMS MST 02
HOA RANDOMS MST 02
100問 • 1年前HOA MST RANDOMS 03
HOA MST RANDOMS 03
LazyXKing · 7問 · 1年前HOA MST RANDOMS 03
HOA MST RANDOMS 03
7問 • 1年前DESIGN DAY 2
DESIGN DAY 2
LazyXKing · 97問 · 1年前DESIGN DAY 2
DESIGN DAY 2
97問 • 1年前問題一覧
1
925mm
2
50m
3
250mm
4
2.40m
5
800mm
6
30 degrees from horizontal
7
800mm
8
2.00m
9
none of the choices
10
general conditions
11
furnish
12
install
13
provide
14
the contractor
15
the owner
16
the specs
17
all of the choices
18
2.40m
19
0.65sqm
20
6.00m
21
partnership
22
ownership
23
the PRBArch
24
3/4
25
70%
26
the IAPOA must be registered with the DTI and the PRBOA
27
they shall not be affected
28
the contractor
29
the filipino counterpart
30
the UAP as the IAPOA
31
marriage contract in NSO security paper for married male applicants
32
copyright
33
consulting architect
34
when the Certificate of Completion is issued
35
when the amount of completed work is equal to 98% or more of the contract amount
36
none of the choices
37
paymend bond
38
56sqm
39
Group H buildings without stage whose seating capacity is less than 500
40
750mm
41
the contractor and the construction supervisor
42
a fence only
43
automatic fire suppression system
44
all of these persons are violating RA 9266
45
none of this is true
46
all of the choices
47
perfomance bond
48
10% of the floor area but not less than 1sqm
49
3
50
10.00m
51
1:20
52
dry standpipe
53
fire alarm
54
70% max saleable, 30% min non-saleable
55
a pathway length of up to 60.00m is allowed
56
Class K
57
3.5% of gross area
58
complete house
59
monitoring of maintenance and upkeep services of the building
60
post-construction services
61
Group 6
62
90% of his work
63
a greenhouse that measures 2 x 3 meters only
64
yes, as long as the building official issues the ground preparation and excavation permit and as long as the owner follows the corresponding rules/requirements
65
11.10 sqm
66
9.30 sqm
67
only one
68
all of these are allowed by SPP 201
69
comprehensive development planning
70
the projects manager's
71
the architect
72
the contractor
73
comprehensive architectural services?
74
feasibility studies
75
it is doubled
76
allowed on both sides of the property or on one side and the rear
77
BP 220
78
5.00 m
79
1.50 m
80
700mm and 900mm
81
car inside dimensions of 1.10m x 1.40m
82
800-1200mm from the floor
83
a block 500 m long a 200 m wide alley approximately at the center
84
sprinkler system
85
3.00m x 5.00m
86
conduct seminars and workshops as part of the continuing professional development (cpd) program and as an automatic cpd provider
87
removing "site planning" from the syllabus of the exam. this subject should be included because it is extremely important in architecture
88
an architect who has never been convicted of crimes involving moral turniptude and who has plenty of related experience as current chairman of the philippine institute of architects
89
yes, because this is one of the methods of rendering design-build services according to the SPP
90
section 33 of RA 9266
91
the contractor still needs to rectify it because it is inferior work, at no cost to the owner.
92
an architect who credits half of his commission from the supplier to the owner's bill (to add to the owner's discount)
93
solid and liquid waste disposal, parks and playgrounds, power
94
a level area not less than 1.80m in length
95
yes, if the building official grants a partial certificate of occupancy to the owner
96
balconies with an area of 5sqm
97
only when the gift will not cloud the architect's judgment and objectivity
98
an architect who accepts a commission to remodel a building after notifying the original architect of the commission and ensuring that the previous architect's contract was properly terminated
99
the intellectual property for the design remains the same because the construction of the project is irrelevant to intellectual property
100
min dimension of 1.50m, center-to-center distance of 13.50m