    construction involving CHANGES IN MATERIAL USED, PARTITIONING, LOCATIONS/SIZES OF OPENINGS, STRUCTURAL PART, exiting utilities and equipment without INCREASING THE OVERALL AREA

    alteration

  • 2

    TRANSFER of buildings or PORTIONS thereof from an original location to another, either within the same lot or to a different one

    moving

  • 3

    ANY PHYSICAL CHANGES made on a building/structure to INCREASE ITS VALUE, UTILITY and/or to IMPROVE ITS AETHETIC QUALITY

    renovation

  • 4

    about bldg official (BO), according to RULE 2 of the IRR of PD 1096 the BO must either be a duly registered architect or civil engr

    true

  • 5

    about bldg official (BO), according to RULE 2 of the IRR of PD 1096 the BO must be of good moral character

    true

  • 6

    about bldg official (BO), according to RULE 2 of the IRR of PD 1096 the BO must hve atleast 5 yrs of diversified nd professional exp in bldg design nd construction

    true

  • 7

    which of the ff violations is the gravest, acc to rule 2 of the NBC IRR

    NON-COMPLIANCE with work STOPPAGE ORDER for construction or demolition without permit

  • 8

    whose duty is it to declare buildings as ruinous or dangerous

    building official's duty

  • 9

    min. front setback required for an industrial project when the rrow adjoining the property is 30 meters wide

    8 meters

  • 10

    written authorization granted by the building official to an applicant allowing him to proceed with construction after plans, specifications and other pertinent documents have been found to be in conformity with the code

    building permit

  • 11

    acc to rule 2 of the NBC IRR, which does not fall under civil/structural documents?

    all of the above are included under civil/structural documents

  • 12

    firewalls are not allowed for R1 developments, however, an abutment of up to 3.20m in height is allowed, provided that above ____, the abutment shall be made of perforated concrete blocks.

    1.50m

  • 13

    for a sloping lot with a 2.00m difference between the highest and lowest points of the lot, where will be established gradeline be for building height determination?

    the highest point if the lot

  • 14

    what is the min. parking slot size for a standard truck?

    3.60 x 12.00 m

  • 15

    if you add the ISA and USA, what will you get?

    TOSL

  • 16

    if you substract the ISA max from the MACA, what will you get?

    PSO max

  • 17

    if you multiply the FLAR by the TLA, what will you get?

    GFA

  • 18

    what is the min. area for habitable rooms, acc. to the national building code?

    6.00 sqm

  • 19

    what is the min. air space provision per person for habitable rooms?

    14 cum

  • 20

    what is the min. width for an access road serving an interior lot intended to serve 4 dwelling units?

    3.00 m

  • 21

    what is the min. ceiling height required for the seventh floor of a naturally-ventillated building

    2.70 m

  • 22

    for agricultural areas, the NBC requires at least ____ of easement for each side of the waterway.

    20 m

  • 23

    townhouses characterize which zoning classification?

    R-4

  • 24

    before using or occupying a completed building, this document must be issued first.

    certificate of occupancy

  • 25

    the bldg code requires that the owner hire a fulltime inspector for the construction. this inspector must be a:

    licensed architect

  • 26

    this refers to any new construction which increases the height or area of an existing building

    addition

  • 27

    this uses wood construction with protective fire resistant materials and is one-hour fire-resistivity throughout.

    type 2

  • 28

    which is NOT included among the valid grounds for declaring a building as dangerous?

    aesthetic deficiency

  • 29

    type 2 constructions are not allowed in which zones?

    highly fire restrictive zones

  • 30

    on a non-arcaded RROW, signs may be allowed to project by as much as

    1200mm

  • 31

    for glass panels that need to be larger than 3.00x3.00m, the minimum thickness needs to be:

    15mm

  • 32

    acc. to the NBC, the max. speed of escalator is

    38 meters/minute

  • 33

    acc to the NBC, the minimum stairway with for the buildings with an occupant loat of 10-50 is

    0.90m

  • 34

    which formula could be used to yield building bulk?

    TLA x PSOmax x BHLmeters

  • 35

    every fence or building corner must be truncated at the corner to form a chaflan on roads that are less than 3.60m wide. what is the minimum width of a chaflan?

    4 m

  • 36

    what is the maximum allowable slope for PWD ramps, according to BP344

    1:12

  • 37

    what is the minimum width required for a curb cutout leading to a 1.20m-wide crossing?

    0.90m

  • 38

    what us the min. width of an accessible parking slot?

    3.70m

  • 39

    what are th minimum dimensions of a toilet stall for PWDs?

    1.70m x 1.80m

  • 40

    what is the maximum travel distance allowed for accessible elevators?

    30m from entrance

  • 41

    for PWD washrooms, what is the maximum height allowed for a lavatory counter?

    800mm

  • 42

    what is the minimum clear width for doors according to BP 344

    800mm

  • 43

    fires involving energized electrical equipment are classified as:

    class C

  • 44

    what is the maximum allowable riser height for stairs in BP 220?

    250mm

  • 45

    what is the minimum THREAD WIDTH for stairs in BP 220?

    200mm

  • 46

    fires involving ordinary combustile materials such as wood, cloth, rubber, and plastics

    class A

  • 47

    what is the min. ceiling height required for socialized and economic housing (not including mezzanines)?

    2.00m

  • 48

    results of the annual fire pump flow test, the annual main drain test, and the standpipe water flow test should be included in the:

    FSMR

  • 49

    for economic housing, what is the minimum lot area required for single-detached developments?

    72 sqm

  • 50

    for socialized housing, what is the minimum lot frontage required for single detached developments?

    8.00m

  • 51

    what is the minimum SIDE SETBACK required for SOCIALIZED and ECONOMIC housing?

    1.50m

  • 52

    what is the MINIMUM FLOOR AREA required for open market housing?

    42 sqm

  • 53

    what is the minimum lot area required for open area market, duplex housing?

    96sqm

  • 54

    for BP 220, what is the minimum thickness required for firewalls?

    6 inches

  • 55

    what is the minimum floor area required for a medium cost family condominium according ti PD 957?

    22 sqm

  • 56

    the maximum number of persons that may be allowed to occupy a particular building or space

    occupant load

  • 57

    this document is issued upon determination that design and specification is in accordance with the provisions of the fire code

    FSEC

  • 58

    which of the ff shall take precedence over the other?

    an architects duty to the public

  • 59

    an architect registered and licensed under RA 9266, who is directly and professionally responsible and liable for the construction supervision of the project

    architect in charge of construction

  • 60

    which of the ff is grounds for suspension/revocation of an architects fee?

    all of the choices

  • 61

    which will need to be registered with the SEC

    a partnership

  • 62

    which method of selection is recommended for small projects?

    direct selection

  • 63

    as defined by SPP 201, the goal of this is to achieve an unimpaired program at minimum cost

    value management

  • 64

    in the multiple of direct personnel expenses, what is added to the "fee" to get the total cost charged to the client?

    reimbursibles

  • 65

    when there is a continuing relationship with the owner involving a series of projects, which method of compensation is recommended?

    professional fee plus expenses

  • 66

    which is not a phase in the regular design services of the architect?

    site development

  • 67

    whish is not an architect's duty when he functions as a construction manager?

    design revisions

  • 68

    the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments like RROWs are going to be built

    physical planning

  • 69

    forensic architecture is a

    specialized architectural service

  • 70

    which SPP documents covers Construction Management (CM) services?

    SPP-204B

  • 71

    for the multiple of direct personnel expense method of compensation, what is the multiplier recommended by the SPP?

    1.5-2.5

  • 72

    during regular design service, when should the architect submit or update the SPPCC?

    all of the choices

  • 73

    in SPP 202, projects are classified according to the degree of complexity of the project. which fall under Group 2?

    mall

  • 74

    in SPP 202, projects are classified according to the degree of complexity of the project. which falls under Group 3

    all of the choices

  • 75

    the architect's fee is a

    net amount

  • 76

    which is not part of the PCC

    cost of acquiring the lot

  • 77

    which is the largest amount

    PDC

  • 78

    what is the minimum tread required for new stairs in RA 9514

    280mm

  • 79

    what is the minimum riser height required for new stairs in RA 9514?

    100mm

  • 80

    which handrail height is NOT allowed by RA 9514?

    870mm

  • 81

    based on RA 9514, how many exits are required if the occupant load is 600?

    3 exits

  • 82

    what is the min. lot frontage required for a socialized duplex housing unit?

    6.00m

  • 83

    the minimum tread for exiting stairs, according to RA 9514?

    230mm

  • 84

    minimum ramp width, according to RA 9514.

    1120mm

  • 85

    minimum elevator pit depth according to the NBC

    600mm

  • 86

    area per person for places of assembly, standing rooms.

    0.28sqm

  • 87

    firewall extension under the eaves, according to the NBC

    300mm

  • 88

    minimum floor area of a single-occupancy condominium for medium cost housing.

    18sqm

  • 89

    minimum width of a pathwalk, according to BP 220.

    3.00m

  • 90

    minimum width of passageway for courts according to NBC.

    1.20m

  • 91

    maximum distance of the required turning space from dead end, according to BP 344.

    3.50m

  • 92

    maximum height of a flush control device for PWD toilets, according to BP 344.

    1200mm from the floor

  • 93

    minimum width of the stairs for OL greater than 10, according to the NBC

    0.90m

  • 94

    minimum depth of tactile strip that needs to be provided at the top and the bottom of stairs, according to BP 344.

    300mm

  • 95

    maximum "LONGITUDINAL GRADIENT" of a WALKWAY, according to BP 344.

    1:20

  • 96

    maximum cross gradient of a walkway, according to BP 344.

    1:100

  • 97

    maximum projection of GRATINGS from the surfaces of the walkway, according to BP 344.

    6.5mm

  • 98

    minimum clearance of a handrail that is vertically mounted on top of a ledge, according to BP 344.

    40mm

  • 99

    minimum clearance of a handrail that is horizontally mounted onto a wall, according to BP 344.

    50mm

  • 100

    maximum crossing speed for pedestrians prescibed by BP 344.

    0.90m/sec

  • Architect Dictums and Philosophies

    Architect Dictums and Philosophies

    LazyXKing · 90問 · 1年前

    Architect Dictums and Philosophies

    Architect Dictums and Philosophies

    90問 • 1年前
    LazyXKing

    FIRE PROTECTION 1

    FIRE PROTECTION 1

    LazyXKing · 100問 · 1年前

    FIRE PROTECTION 1

    FIRE PROTECTION 1

    100問 • 1年前
    LazyXKing

    FIRE PROTECTION 2

    FIRE PROTECTION 2

    LazyXKing · 46問 · 1年前

    FIRE PROTECTION 2

    FIRE PROTECTION 2

    46問 • 1年前
    LazyXKing

    DAY 01am-part1

    DAY 01am-part1

    LazyXKing · 53問 · 1年前

    DAY 01am-part1

    DAY 01am-part1

    53問 • 1年前
    LazyXKing

    DAY 01 pm-part1

    DAY 01 pm-part1

    LazyXKing · 100問 · 1年前

    DAY 01 pm-part1

    DAY 01 pm-part1

    100問 • 1年前
    LazyXKing

    DAY 01 pm-part2

    DAY 01 pm-part2

    LazyXKing · 100問 · 1年前

    DAY 01 pm-part2

    DAY 01 pm-part2

    100問 • 1年前
    LazyXKing

    DAY 01 pm-part3

    DAY 01 pm-part3

    LazyXKing · 99問 · 1年前

    DAY 01 pm-part3

    DAY 01 pm-part3

    99問 • 1年前
    LazyXKing

    RA 9266

    RA 9266

    LazyXKing · 30問 · 1年前

    RA 9266

    RA 9266

    30問 • 1年前
    LazyXKing

    BLDG LAWS & PROFPRAC PREBOARD 2

    BLDG LAWS & PROFPRAC PREBOARD 2

    LazyXKing · 100問 · 1年前

    BLDG LAWS & PROFPRAC PREBOARD 2

    BLDG LAWS & PROFPRAC PREBOARD 2

    100問 • 1年前
    LazyXKing

    BLDG LAWS & PROFPRAC PREBOARD 3

    BLDG LAWS & PROFPRAC PREBOARD 3

    LazyXKing · 45問 · 1年前

    BLDG LAWS & PROFPRAC PREBOARD 3

    BLDG LAWS & PROFPRAC PREBOARD 3

    45問 • 1年前
    LazyXKing

    BLDG LAWS & PROFPRAC PREBOARD 4

    BLDG LAWS & PROFPRAC PREBOARD 4

    LazyXKing · 97問 · 1年前

    BLDG LAWS & PROFPRAC PREBOARD 4

    BLDG LAWS & PROFPRAC PREBOARD 4

    97問 • 1年前
    LazyXKing

    VERNACULAR TERMS o1

    VERNACULAR TERMS o1

    LazyXKing · 86問 · 1年前

    VERNACULAR TERMS o1

    VERNACULAR TERMS o1

    86問 • 1年前
    LazyXKing

    VERNACULAR TERMS o2

    VERNACULAR TERMS o2

    LazyXKing · 98問 · 1年前

    VERNACULAR TERMS o2

    VERNACULAR TERMS o2

    98問 • 1年前
    LazyXKing

    VERNACULAR TERMS o3

    VERNACULAR TERMS o3

    LazyXKing · 100問 · 1年前

    VERNACULAR TERMS o3

    VERNACULAR TERMS o3

    100問 • 1年前
    LazyXKing

    VERNACULAR TERMS o4

    VERNACULAR TERMS o4

    LazyXKing · 53問 · 1年前

    VERNACULAR TERMS o4

    VERNACULAR TERMS o4

    53問 • 1年前
    LazyXKing

    HOA RANDOMS MST 01

    HOA RANDOMS MST 01

    LazyXKing · 100問 · 1年前

    HOA RANDOMS MST 01

    HOA RANDOMS MST 01

    100問 • 1年前
    LazyXKing

    HOA RANDOMS MST 02

    HOA RANDOMS MST 02

    LazyXKing · 100問 · 1年前

    HOA RANDOMS MST 02

    HOA RANDOMS MST 02

    100問 • 1年前
    LazyXKing

    HOA MST RANDOMS 03

    HOA MST RANDOMS 03

    LazyXKing · 7問 · 1年前

    HOA MST RANDOMS 03

    HOA MST RANDOMS 03

    7問 • 1年前
    LazyXKing

    DESIGN DAY 2

    DESIGN DAY 2

    LazyXKing · 97問 · 1年前

    DESIGN DAY 2

    DESIGN DAY 2

    97問 • 1年前
    LazyXKing

    問題一覧

  • 1

    construction involving CHANGES IN MATERIAL USED, PARTITIONING, LOCATIONS/SIZES OF OPENINGS, STRUCTURAL PART, exiting utilities and equipment without INCREASING THE OVERALL AREA

    alteration

  • 2

    TRANSFER of buildings or PORTIONS thereof from an original location to another, either within the same lot or to a different one

    moving

  • 3

    ANY PHYSICAL CHANGES made on a building/structure to INCREASE ITS VALUE, UTILITY and/or to IMPROVE ITS AETHETIC QUALITY

    renovation

  • 4

    about bldg official (BO), according to RULE 2 of the IRR of PD 1096 the BO must either be a duly registered architect or civil engr

    true

  • 5

    about bldg official (BO), according to RULE 2 of the IRR of PD 1096 the BO must be of good moral character

    true

  • 6

    about bldg official (BO), according to RULE 2 of the IRR of PD 1096 the BO must hve atleast 5 yrs of diversified nd professional exp in bldg design nd construction

    true

  • 7

    which of the ff violations is the gravest, acc to rule 2 of the NBC IRR

    NON-COMPLIANCE with work STOPPAGE ORDER for construction or demolition without permit

  • 8

    whose duty is it to declare buildings as ruinous or dangerous

    building official's duty

  • 9

    min. front setback required for an industrial project when the rrow adjoining the property is 30 meters wide

    8 meters

  • 10

    written authorization granted by the building official to an applicant allowing him to proceed with construction after plans, specifications and other pertinent documents have been found to be in conformity with the code

    building permit

  • 11

    acc to rule 2 of the NBC IRR, which does not fall under civil/structural documents?

    all of the above are included under civil/structural documents

  • 12

    firewalls are not allowed for R1 developments, however, an abutment of up to 3.20m in height is allowed, provided that above ____, the abutment shall be made of perforated concrete blocks.

    1.50m

  • 13

    for a sloping lot with a 2.00m difference between the highest and lowest points of the lot, where will be established gradeline be for building height determination?

    the highest point if the lot

  • 14

    what is the min. parking slot size for a standard truck?

    3.60 x 12.00 m

  • 15

    if you add the ISA and USA, what will you get?

    TOSL

  • 16

    if you substract the ISA max from the MACA, what will you get?

    PSO max

  • 17

    if you multiply the FLAR by the TLA, what will you get?

    GFA

  • 18

    what is the min. area for habitable rooms, acc. to the national building code?

    6.00 sqm

  • 19

    what is the min. air space provision per person for habitable rooms?

    14 cum

  • 20

    what is the min. width for an access road serving an interior lot intended to serve 4 dwelling units?

    3.00 m

  • 21

    what is the min. ceiling height required for the seventh floor of a naturally-ventillated building

    2.70 m

  • 22

    for agricultural areas, the NBC requires at least ____ of easement for each side of the waterway.

    20 m

  • 23

    townhouses characterize which zoning classification?

    R-4

  • 24

    before using or occupying a completed building, this document must be issued first.

    certificate of occupancy

  • 25

    the bldg code requires that the owner hire a fulltime inspector for the construction. this inspector must be a:

    licensed architect

  • 26

    this refers to any new construction which increases the height or area of an existing building

    addition

  • 27

    this uses wood construction with protective fire resistant materials and is one-hour fire-resistivity throughout.

    type 2

  • 28

    which is NOT included among the valid grounds for declaring a building as dangerous?

    aesthetic deficiency

  • 29

    type 2 constructions are not allowed in which zones?

    highly fire restrictive zones

  • 30

    on a non-arcaded RROW, signs may be allowed to project by as much as

    1200mm

  • 31

    for glass panels that need to be larger than 3.00x3.00m, the minimum thickness needs to be:

    15mm

  • 32

    acc. to the NBC, the max. speed of escalator is

    38 meters/minute

  • 33

    acc to the NBC, the minimum stairway with for the buildings with an occupant loat of 10-50 is

    0.90m

  • 34

    which formula could be used to yield building bulk?

    TLA x PSOmax x BHLmeters

  • 35

    every fence or building corner must be truncated at the corner to form a chaflan on roads that are less than 3.60m wide. what is the minimum width of a chaflan?

    4 m

  • 36

    what is the maximum allowable slope for PWD ramps, according to BP344

    1:12

  • 37

    what is the minimum width required for a curb cutout leading to a 1.20m-wide crossing?

    0.90m

  • 38

    what us the min. width of an accessible parking slot?

    3.70m

  • 39

    what are th minimum dimensions of a toilet stall for PWDs?

    1.70m x 1.80m

  • 40

    what is the maximum travel distance allowed for accessible elevators?

    30m from entrance

  • 41

    for PWD washrooms, what is the maximum height allowed for a lavatory counter?

    800mm

  • 42

    what is the minimum clear width for doors according to BP 344

    800mm

  • 43

    fires involving energized electrical equipment are classified as:

    class C

  • 44

    what is the maximum allowable riser height for stairs in BP 220?

    250mm

  • 45

    what is the minimum THREAD WIDTH for stairs in BP 220?

    200mm

  • 46

    fires involving ordinary combustile materials such as wood, cloth, rubber, and plastics

    class A

  • 47

    what is the min. ceiling height required for socialized and economic housing (not including mezzanines)?

    2.00m

  • 48

    results of the annual fire pump flow test, the annual main drain test, and the standpipe water flow test should be included in the:

    FSMR

  • 49

    for economic housing, what is the minimum lot area required for single-detached developments?

    72 sqm

  • 50

    for socialized housing, what is the minimum lot frontage required for single detached developments?

    8.00m

  • 51

    what is the minimum SIDE SETBACK required for SOCIALIZED and ECONOMIC housing?

    1.50m

  • 52

    what is the MINIMUM FLOOR AREA required for open market housing?

    42 sqm

  • 53

    what is the minimum lot area required for open area market, duplex housing?

    96sqm

  • 54

    for BP 220, what is the minimum thickness required for firewalls?

    6 inches

  • 55

    what is the minimum floor area required for a medium cost family condominium according ti PD 957?

    22 sqm

  • 56

    the maximum number of persons that may be allowed to occupy a particular building or space

    occupant load

  • 57

    this document is issued upon determination that design and specification is in accordance with the provisions of the fire code

    FSEC

  • 58

    which of the ff shall take precedence over the other?

    an architects duty to the public

  • 59

    an architect registered and licensed under RA 9266, who is directly and professionally responsible and liable for the construction supervision of the project

    architect in charge of construction

  • 60

    which of the ff is grounds for suspension/revocation of an architects fee?

    all of the choices

  • 61

    which will need to be registered with the SEC

    a partnership

  • 62

    which method of selection is recommended for small projects?

    direct selection

  • 63

    as defined by SPP 201, the goal of this is to achieve an unimpaired program at minimum cost

    value management

  • 64

    in the multiple of direct personnel expenses, what is added to the "fee" to get the total cost charged to the client?

    reimbursibles

  • 65

    when there is a continuing relationship with the owner involving a series of projects, which method of compensation is recommended?

    professional fee plus expenses

  • 66

    which is not a phase in the regular design services of the architect?

    site development

  • 67

    whish is not an architect's duty when he functions as a construction manager?

    design revisions

  • 68

    the orderly arrangement within a piece of land or property on which vertical structures such as buildings, monuments and the like, as well as horizontal developments like RROWs are going to be built

    physical planning

  • 69

    forensic architecture is a

    specialized architectural service

  • 70

    which SPP documents covers Construction Management (CM) services?

    SPP-204B

  • 71

    for the multiple of direct personnel expense method of compensation, what is the multiplier recommended by the SPP?

    1.5-2.5

  • 72

    during regular design service, when should the architect submit or update the SPPCC?

    all of the choices

  • 73

    in SPP 202, projects are classified according to the degree of complexity of the project. which fall under Group 2?

    mall

  • 74

    in SPP 202, projects are classified according to the degree of complexity of the project. which falls under Group 3

    all of the choices

  • 75

    the architect's fee is a

    net amount

  • 76

    which is not part of the PCC

    cost of acquiring the lot

  • 77

    which is the largest amount

    PDC

  • 78

    what is the minimum tread required for new stairs in RA 9514

    280mm

  • 79

    what is the minimum riser height required for new stairs in RA 9514?

    100mm

  • 80

    which handrail height is NOT allowed by RA 9514?

    870mm

  • 81

    based on RA 9514, how many exits are required if the occupant load is 600?

    3 exits

  • 82

    what is the min. lot frontage required for a socialized duplex housing unit?

    6.00m

  • 83

    the minimum tread for exiting stairs, according to RA 9514?

    230mm

  • 84

    minimum ramp width, according to RA 9514.

    1120mm

  • 85

    minimum elevator pit depth according to the NBC

    600mm

  • 86

    area per person for places of assembly, standing rooms.

    0.28sqm

  • 87

    firewall extension under the eaves, according to the NBC

    300mm

  • 88

    minimum floor area of a single-occupancy condominium for medium cost housing.

    18sqm

  • 89

    minimum width of a pathwalk, according to BP 220.

    3.00m

  • 90

    minimum width of passageway for courts according to NBC.

    1.20m

  • 91

    maximum distance of the required turning space from dead end, according to BP 344.

    3.50m

  • 92

    maximum height of a flush control device for PWD toilets, according to BP 344.

    1200mm from the floor

  • 93

    minimum width of the stairs for OL greater than 10, according to the NBC

    0.90m

  • 94

    minimum depth of tactile strip that needs to be provided at the top and the bottom of stairs, according to BP 344.

    300mm

  • 95

    maximum "LONGITUDINAL GRADIENT" of a WALKWAY, according to BP 344.

    1:20

  • 96

    maximum cross gradient of a walkway, according to BP 344.

    1:100

  • 97

    maximum projection of GRATINGS from the surfaces of the walkway, according to BP 344.

    6.5mm

  • 98

    minimum clearance of a handrail that is vertically mounted on top of a ledge, according to BP 344.

    40mm

  • 99

    minimum clearance of a handrail that is horizontally mounted onto a wall, according to BP 344.

    50mm

  • 100

    maximum crossing speed for pedestrians prescibed by BP 344.

    0.90m/sec