SPP and Regular Design Services
問題一覧
1
Comparative selection
2
direct selection
3
Most expensive and time consuming
4
Multiple of direct personnel expenses
5
Percentage of construction cost
6
Based on value of creative design
7
Related to size and type of project
8
Percentage of construction cost
9
Construction phase
10
Schematic design phase
11
contract document phase
12
checking of salaries of workers
13
85%
14
10,000.00
15
300,000.00
16
450,000.00
17
450,000.00
18
15%
19
project construction cost
20
owner
21
miniature models
22
Special interior design
23
all listed items
24
Architect
25
salaries of construction inspector
26
Landscaping
BU2 Quiz 100
BU2 Quiz 100
Mat · 30問 · 1年前BU2 Quiz 100
BU2 Quiz 100
30問 • 1年前RA 9266/Code of Ethics
RA 9266/Code of Ethics
Mat · 43問 · 1年前RA 9266/Code of Ethics
RA 9266/Code of Ethics
43問 • 1年前TOA Topics
TOA Topics
Mat · 17問 · 1年前TOA Topics
TOA Topics
17問 • 1年前Mechanics of Rigid Bodies
Mechanics of Rigid Bodies
Mat · 20問 · 1年前Mechanics of Rigid Bodies
Mechanics of Rigid Bodies
20問 • 1年前Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies
Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies
Mat · 4回閲覧 · 31問 · 1年前Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies
Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies
4回閲覧 • 31問 • 1年前Theory of Structure
Theory of Structure
Mat · 10問 · 1年前Theory of Structure
Theory of Structure
10問 • 1年前Construction Materials and Method
Construction Materials and Method
Mat · 30問 · 1年前Construction Materials and Method
Construction Materials and Method
30問 • 1年前Identification (RC Technology)
Identification (RC Technology)
Mat · 33問 · 1年前Identification (RC Technology)
Identification (RC Technology)
33問 • 1年前RC Design
RC Design
Mat · 23問 · 1年前RC Design
RC Design
23問 • 1年前Steel Design
Steel Design
Mat · 30問 · 1年前Steel Design
Steel Design
30問 • 1年前Timber Design
Timber Design
Mat · 16問 · 1年前Timber Design
Timber Design
16問 • 1年前REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS
REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS
Mat · 50問 · 1年前REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS
REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS
50問 • 1年前Q9
Q9
Mat · 25問 · 1年前Q9
Q9
25問 • 1年前CORREL HOA JUNE 20, 2018
CORREL HOA JUNE 20, 2018
Mat · 78問 · 1年前CORREL HOA JUNE 20, 2018
CORREL HOA JUNE 20, 2018
78問 • 1年前CORREL TOA JUNE 20, 2018
CORREL TOA JUNE 20, 2018
Mat · 38問 · 1年前CORREL TOA JUNE 20, 2018
CORREL TOA JUNE 20, 2018
38問 • 1年前CORREL HOA MARCH 20, 2018
CORREL HOA MARCH 20, 2018
Mat · 88問 · 1年前CORREL HOA MARCH 20, 2018
CORREL HOA MARCH 20, 2018
88問 • 1年前CORREL TOA MARCH 20, 2018
CORREL TOA MARCH 20, 2018
Mat · 46問 · 1年前CORREL TOA MARCH 20, 2018
CORREL TOA MARCH 20, 2018
46問 • 1年前CORREL PLANNING 2018
CORREL PLANNING 2018
Mat · 85問 · 1年前CORREL PLANNING 2018
CORREL PLANNING 2018
85問 • 1年前HOA 1
HOA 1
Mat · 60問 · 1年前HOA 1
HOA 1
60問 • 1年前HOA 2
HOA 2
Mat · 30問 · 1年前HOA 2
HOA 2
30問 • 1年前HOA 3
HOA 3
Mat · 24問 · 1年前HOA 3
HOA 3
24問 • 1年前HOA 4
HOA 4
Mat · 46問 · 1年前HOA 4
HOA 4
46問 • 1年前CORREL ARCHI DESIGN 2018
CORREL ARCHI DESIGN 2018
Mat · 74問 · 1年前CORREL ARCHI DESIGN 2018
CORREL ARCHI DESIGN 2018
74問 • 1年前CORREL BTECH AND MATERIALS
CORREL BTECH AND MATERIALS
Mat · 73問 · 1年前CORREL BTECH AND MATERIALS
CORREL BTECH AND MATERIALS
73問 • 1年前CORREL BU 2018
CORREL BU 2018
Mat · 44問 · 1年前CORREL BU 2018
CORREL BU 2018
44問 • 1年前問題一覧
1
Comparative selection
2
direct selection
3
Most expensive and time consuming
4
Multiple of direct personnel expenses
5
Percentage of construction cost
6
Based on value of creative design
7
Related to size and type of project
8
Percentage of construction cost
9
Construction phase
10
Schematic design phase
11
contract document phase
12
checking of salaries of workers
13
85%
14
10,000.00
15
300,000.00
16
450,000.00
17
450,000.00
18
15%
19
project construction cost
20
owner
21
miniature models
22
Special interior design
23
all listed items
24
Architect
25
salaries of construction inspector
26
Landscaping