ログイン

SPP and Regular Design Services

SPP and Regular Design Services
26問 • 1年前
  • Mat
  • 通報

    問題一覧

  • 1

    Which method of selecting an architect is often used by government agencies or private institutions undertaking a project? 

    Comparative selection

  • 2

    Which method of selecting an architect is often used by an individual undertaking a relatively small project? 

    direct selection

  • 3

    Which of the following describes the architectural competition in selecting an architect? 

    Most expensive and time consuming

  • 4

    Which compensation method for architect’s services is made by adding all costs of technical services and uses a multiplier to take care of overhead and profit? 

    Multiple of direct personnel expenses

  • 5

    Which compensation method for architects’ services is flexible and any change will not affect owner-architect agreement? 

    Percentage of construction cost

  • 6

    Which of the following does not describe the multiple of direct personnel expenses method of compensation? 

    Based on value of creative design

  • 7

    Which of the following describes the percentage of construction cost compensation method for architects’ services? 

    Related to size and type of project

  • 8

    Among the methods for compensation for architects’ services, which is considered the most fair to both architect and client?

    Percentage of construction cost

  • 9

    In the architect’s regular design services, under which phase does preparation of forms for contract letting, invitation/instruction to bidders, and bidders’ proposals fall? 

    Construction phase

  • 10

    In the architect’s regular design services, under which phase does submission of probable/preliminary project construction cost fall? 

    Schematic design phase

  • 11

    In the architect’s regular design services, under which phase shall the preparation of construction drawings, specifications and Bill of Quantities fall?

    contract document phase

  • 12

    Which of the following activities of an architect does not fall under Construction phase? 

    checking of salaries of workers

  • 13

    Upon completion of contract documents phase, what percentage of the fee is expected to have  been given to the architect by the owner? 

    85%

  • 14

    If the architect’s professional fee is P200,000.00, which of the following amount shall be paid to the architect upon signing of the Agreement? 

    10,000.00

  • 15

    For a residential project worth P 3,000,000.00, which of the following amount shall be the architect’s professional fee if the method of compensation used is percentage of construction cost and the rate is based on UAP Schedule of Minimum Basic Fee?

    300,000.00

  • 16

    An architect has done the renovation of a residence in Valenzuela. Project construction cost is P 3,000,000.00. Using UAP Standards, how much does the architect expect to receive as a minimum basic fee from his client?

    450,000.00

  • 17

    If the architect’s fee is 3,000,000.00, how much is he expected to receive upon completion of the project, assuming that he has been compensated fully for the first three phases of his services? 

    450,000.00

  • 18

    What percentage of construction cost is the architect’s minimum basic fee for monumental buildings/other facilities requiring consummate design skills/precise detailing?

    15%

  • 19

    What is generally the basis of the architect’s minimum basic fee? 

    project construction cost

  • 20

    In a typical owner-architect agreement, who is responsible for payment of taxes on professional services (exclusive of income taxes)? 

    owner

  • 21

    In a typical-owner agreement, which of the following is chargeable to the owner? 

    miniature models

  • 22

    In a typical owner-architect agreement, which of the following is not part of architects’ professional fees? 

    Special interior design

  • 23

    Under the owner-architect agreement, which of the following include (s) the contract document phase of architect’s basic services? 

    all listed items

  • 24

    Who is responsible for payment of professional services required by architect such as normal structural, electrical, plumbing, and mechanical engineering services?

    Architect

  • 25

    Which of the following is not included in the Project Construction Cost? 

    salaries of construction inspector

  • 26

     Which of the following must be paid separately by the Owner to the Architect if designed and planned by the architect? 

    Landscaping

  • BU2 Quiz 100

    BU2 Quiz 100

    Mat · 30問 · 1年前

    BU2 Quiz 100

    BU2 Quiz 100

    30問 • 1年前
    Mat

    RA 9266/Code of Ethics

    RA 9266/Code of Ethics

    Mat · 43問 · 1年前

    RA 9266/Code of Ethics

    RA 9266/Code of Ethics

    43問 • 1年前
    Mat

    TOA Topics

    TOA Topics

    Mat · 17問 · 1年前

    TOA Topics

    TOA Topics

    17問 • 1年前
    Mat

    Mechanics of Rigid Bodies

    Mechanics of Rigid Bodies

    Mat · 20問 · 1年前

    Mechanics of Rigid Bodies

    Mechanics of Rigid Bodies

    20問 • 1年前
    Mat

    Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies

    Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies

    Mat · 4回閲覧 · 31問 · 1年前

    Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies

    Strength of Materials | 2 Prob set on Mechanic of Deformable Bodies

    4回閲覧 • 31問 • 1年前
    Mat

    Theory of Structure

    Theory of Structure

    Mat · 10問 · 1年前

    Theory of Structure

    Theory of Structure

    10問 • 1年前
    Mat

    Construction Materials and Method

    Construction Materials and Method

    Mat · 30問 · 1年前

    Construction Materials and Method

    Construction Materials and Method

    30問 • 1年前
    Mat

    Identification (RC Technology)

    Identification (RC Technology)

    Mat · 33問 · 1年前

    Identification (RC Technology)

    Identification (RC Technology)

    33問 • 1年前
    Mat

    RC Design

    RC Design

    Mat · 23問 · 1年前

    RC Design

    RC Design

    23問 • 1年前
    Mat

    Steel Design

    Steel Design

    Mat · 30問 · 1年前

    Steel Design

    Steel Design

    30問 • 1年前
    Mat

    Timber Design

    Timber Design

    Mat · 16問 · 1年前

    Timber Design

    Timber Design

    16問 • 1年前
    Mat

    REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS

    REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS

    Mat · 50問 · 1年前

    REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS

    REINFORCED CONCRETE DESIGN CODES & SPECIFICATIONS

    50問 • 1年前
    Mat

    Q9

    Q9

    Mat · 25問 · 1年前

    Q9

    Q9

    25問 • 1年前
    Mat

    CORREL HOA JUNE 20, 2018

    CORREL HOA JUNE 20, 2018

    Mat · 78問 · 1年前

    CORREL HOA JUNE 20, 2018

    CORREL HOA JUNE 20, 2018

    78問 • 1年前
    Mat

    CORREL TOA JUNE 20, 2018

    CORREL TOA JUNE 20, 2018

    Mat · 38問 · 1年前

    CORREL TOA JUNE 20, 2018

    CORREL TOA JUNE 20, 2018

    38問 • 1年前
    Mat

    CORREL HOA MARCH 20, 2018

    CORREL HOA MARCH 20, 2018

    Mat · 88問 · 1年前

    CORREL HOA MARCH 20, 2018

    CORREL HOA MARCH 20, 2018

    88問 • 1年前
    Mat

    CORREL TOA MARCH 20, 2018

    CORREL TOA MARCH 20, 2018

    Mat · 46問 · 1年前

    CORREL TOA MARCH 20, 2018

    CORREL TOA MARCH 20, 2018

    46問 • 1年前
    Mat

    CORREL PLANNING 2018

    CORREL PLANNING 2018

    Mat · 85問 · 1年前

    CORREL PLANNING 2018

    CORREL PLANNING 2018

    85問 • 1年前
    Mat

    HOA 1

    HOA 1

    Mat · 60問 · 1年前

    HOA 1

    HOA 1

    60問 • 1年前
    Mat

    HOA 2

    HOA 2

    Mat · 30問 · 1年前

    HOA 2

    HOA 2

    30問 • 1年前
    Mat

    HOA 3

    HOA 3

    Mat · 24問 · 1年前

    HOA 3

    HOA 3

    24問 • 1年前
    Mat

    HOA 4

    HOA 4

    Mat · 46問 · 1年前

    HOA 4

    HOA 4

    46問 • 1年前
    Mat

    CORREL ARCHI DESIGN 2018

    CORREL ARCHI DESIGN 2018

    Mat · 74問 · 1年前

    CORREL ARCHI DESIGN 2018

    CORREL ARCHI DESIGN 2018

    74問 • 1年前
    Mat

    CORREL BTECH AND MATERIALS

    CORREL BTECH AND MATERIALS

    Mat · 73問 · 1年前

    CORREL BTECH AND MATERIALS

    CORREL BTECH AND MATERIALS

    73問 • 1年前
    Mat

    CORREL BU 2018

    CORREL BU 2018

    Mat · 44問 · 1年前

    CORREL BU 2018

    CORREL BU 2018

    44問 • 1年前
    Mat

    問題一覧

  • 1

    Which method of selecting an architect is often used by government agencies or private institutions undertaking a project? 

    Comparative selection

  • 2

    Which method of selecting an architect is often used by an individual undertaking a relatively small project? 

    direct selection

  • 3

    Which of the following describes the architectural competition in selecting an architect? 

    Most expensive and time consuming

  • 4

    Which compensation method for architect’s services is made by adding all costs of technical services and uses a multiplier to take care of overhead and profit? 

    Multiple of direct personnel expenses

  • 5

    Which compensation method for architects’ services is flexible and any change will not affect owner-architect agreement? 

    Percentage of construction cost

  • 6

    Which of the following does not describe the multiple of direct personnel expenses method of compensation? 

    Based on value of creative design

  • 7

    Which of the following describes the percentage of construction cost compensation method for architects’ services? 

    Related to size and type of project

  • 8

    Among the methods for compensation for architects’ services, which is considered the most fair to both architect and client?

    Percentage of construction cost

  • 9

    In the architect’s regular design services, under which phase does preparation of forms for contract letting, invitation/instruction to bidders, and bidders’ proposals fall? 

    Construction phase

  • 10

    In the architect’s regular design services, under which phase does submission of probable/preliminary project construction cost fall? 

    Schematic design phase

  • 11

    In the architect’s regular design services, under which phase shall the preparation of construction drawings, specifications and Bill of Quantities fall?

    contract document phase

  • 12

    Which of the following activities of an architect does not fall under Construction phase? 

    checking of salaries of workers

  • 13

    Upon completion of contract documents phase, what percentage of the fee is expected to have  been given to the architect by the owner? 

    85%

  • 14

    If the architect’s professional fee is P200,000.00, which of the following amount shall be paid to the architect upon signing of the Agreement? 

    10,000.00

  • 15

    For a residential project worth P 3,000,000.00, which of the following amount shall be the architect’s professional fee if the method of compensation used is percentage of construction cost and the rate is based on UAP Schedule of Minimum Basic Fee?

    300,000.00

  • 16

    An architect has done the renovation of a residence in Valenzuela. Project construction cost is P 3,000,000.00. Using UAP Standards, how much does the architect expect to receive as a minimum basic fee from his client?

    450,000.00

  • 17

    If the architect’s fee is 3,000,000.00, how much is he expected to receive upon completion of the project, assuming that he has been compensated fully for the first three phases of his services? 

    450,000.00

  • 18

    What percentage of construction cost is the architect’s minimum basic fee for monumental buildings/other facilities requiring consummate design skills/precise detailing?

    15%

  • 19

    What is generally the basis of the architect’s minimum basic fee? 

    project construction cost

  • 20

    In a typical owner-architect agreement, who is responsible for payment of taxes on professional services (exclusive of income taxes)? 

    owner

  • 21

    In a typical-owner agreement, which of the following is chargeable to the owner? 

    miniature models

  • 22

    In a typical owner-architect agreement, which of the following is not part of architects’ professional fees? 

    Special interior design

  • 23

    Under the owner-architect agreement, which of the following include (s) the contract document phase of architect’s basic services? 

    all listed items

  • 24

    Who is responsible for payment of professional services required by architect such as normal structural, electrical, plumbing, and mechanical engineering services?

    Architect

  • 25

    Which of the following is not included in the Project Construction Cost? 

    salaries of construction inspector

  • 26

     Which of the following must be paid separately by the Owner to the Architect if designed and planned by the architect? 

    Landscaping