A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, where would you locate the masters bedroom?
north
2
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, what would you best provide to enjoy the vast panoramic view of the sea?
larger window
3
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, given if the dining and kitchen area of the house requires tiles that have darker shades than of the other tiles for accent purposes, how many 600 x 600 mm ceramic tiles are needed to cover the space?
234 tiles
4
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, what is the minimum setback for the project given the type of residential use? Occupancy, based on table viii.2, section 804 on rule 7 and 8?
4.5m front, 2m sides, 2m rear
5
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, referring on table viii. 2, section 804 of rule 7 and 8, how much is the AMBF of the project?
703. 40 m2
6
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, based on the given data of the project, how much is the AMBF?
703.40 m2
7
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. in project no. 2, based on the given data of the project, how much is the percentage of site occupancy?
67.34%
8
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, based on the given setback on table viii. 2 of rule 7 and 8, how much is the percentage of the project’s site occupancy?
7.34%
9
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. in project no. 2, given that the ground floor area has a 150mm thick concrete slab and requires 20 kilograms of rebars per cubic meter of concrete, how much is the actual kilograms of rebars needed for the whole ground floor?
2,020.20 kilograms
10
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. in project no. 2, the service kitchen needs to be elevated at approximately 150mm above grade which resulted to a 150mm thick slab on ground. How much volume of concrete is needed for the service kitchen? Given if it requires 18 kilograms of rebars per cubic meter of concrete, how many kilograms of rebars are needed?
8.04 cu.m. 130.5 kg of rebars
11
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no. 2, based on the acquired building footprint based/given on table viii.2, section 804 of rule 7 and 8, if the walls of the structure are aligned on all its sides, how many 1.20x2.40 meters ceiling board is to be used if the 1.20-meter roof eaves on all sides will have ceiling?
59 pieces
12
A. PROJECT NO. 2. TITLE AND GENERAL DESCRIPTION: A proposed 2-story residential project. R-1, with 2% slope B. STATEMEMT OF THE PROBLEM: The client’s friend referred you for a specific project located in Manila, Philippines. The project is located near the sea where panoramic view of the sunset is present. The client immediately approved the referral and sothe project started I no time. A rest house is to be built to a 1000 square meter rectangular lot with a 24-meter lot line parallel to the road. The client specified the space requirements for the project: Two(2) son’s bedrooms with a combined area of 94 square meters for both rooms; An office containing 35 square meters in area, a 66 square meter master’s bedroom; a 7x12 meters living room oriented at southwest part of the lot; a 25-square meter square foyer ,An 84-square meter dining and kitchen adjacent to the carport; and a 47-square meter service kitchen, the client also wants a maid’s room, a toilet for ground floor, and an four (4) car garage. The project required a 6 meter front setback, 2 meters setback on the sides and on the rear. C. PROJECT SITE FEATURES: The project site is located on an R1 Zone fronting a fronting a 14-meter wide road located on the south side of the property. The property is a regular inside lot. A 12-meter high, 5-meter in length abutment wall is provided for the four-car garage. A beautiful panoramic view of the sea horizon is visible on the north part of the property. The site slopes uniformly at 2% towards the road. D. DESIGN OBJECTIVES: A) To plan/design the project on an R-1 Zoned property B) To design and maximize space as accordance to the client’s needs. In project no.2, based on the acquired building footprint based/given on table viii.2, section 804 of rule 7 and 8, if the walls of the structure are aligned on all its sides, how much is the length of the gutter if the roof on the last floor has 1.20-metr roof eaves all around the structure?
120.94 meters
13
What is the common term for iron that is worked by being forged or hammered?
Wrought iron
14
What is the common term for a drawing of a face of a building, with all the features shown, as if in a single vertical plane?
elevation
15
What is the standard dimension of a college basketball court?
15 x 26 ,meters
16
What is the live load for ground floor level of a building>
200 kg/sqm
17
What is the live load for second floor level of a building?
200 kg/sqm
18
What is the distance of firewall projection form roof?
0.35 meters
19
What is the minimum rise/run of stairs?
200 mm
20
What is the minimum airspace for workshop and offices?
12 cu. m
21
What is the distance form finish floor to urinal tip?
0.40 meters
22
What is the distance form finish floor to switch?
1.50 meters
23
What is the maximum slump in millimeters?
100 mm
24
What is the minimum, standard dimension of reinforcing, bar/s for columns?
10 mm
25
What is the minimum standard dimension of reinforcing bar/s for 8” chb wall?
10 mm
26
what is the minimum area of t & b?
1.20 sq. m
27
What is the maximum depth of counter top?
0.70 metes
28
what is the distance between the counter top and cabinet?
0.70 meters
29
what is the common term for a portion of a float surface recessed, or raised form the surrounding area, distinctly set off by molding or some other decorative device?
brick wall
30
What is the common term for the overhanging edge of the roof?
overhung
31
In table vii.2, of rule 7 and 8, what is the building height limit, in meters, of the R-1 zoned structure?
10.00 meters
32
What is the common term for main post at the foot of a stairway or stoop?
newel
33
Based on rule 7 and 8, how much is the incremental setback per storey above second floor on the rear and sides of the C-3 zoned structures?
300 mm
34
In a 9-square meter one-storey square structure, how much is the area of a roof if it has 1-meter roof eaves on all sides?
25 square meters
35
What is the common term for the part of molding cornice, or wall that changes direction, usually at a right angle, toward the building wall?
back-faced
36
A . PROJECT NO. 3. TITLE AND GENERAL DESCRIPTION; A proposed one storey- wet and dry market, 2% slope, C-2 B. STATEMENT OF THE PROBLEM: A privately owned company, withits committee, decided to reinvent and expand their existing commercial building that sits on a 5,950 square meter lot and make it into wet and dry market. In order for the market to function, the client required these spaces: stores with an area of 48 square meters per unit, a 40- square meter office, and a32-square meter toilet space. Since the project needs to be sanitary, it requires a garbage pit space to accommodate wastes and residues. C. PROJECT SITE FEATURES: The site is located on a commercial zones area (C-2-). The property is regular inside lot and contains a 40x40 meters existing shed structure which will be preserved and will house other commercial kiosks and stalls for the market. The shorter side of the property stretches up to 70 meter I length and is adjacent and parallel to the 20-meter wide road right of way. The site has an existing 4 parking slots. D. DESIGN OBJECTIVES: A) To plan/design a wet and dry market in accordance to its zone C-2 B) to plan.design a market that maximizes service for the public. C) To plan.design a market that will serve as a landmark for its project location In project no. 3, given that the slab for the office is 0.15 meters thick, how many kilograms of steel reinforcing bars are needed if it requires 15 kilograms of reinforcing bars per cubic meter of concrete?
90 kilograms
37
A . PROJECT NO. 3. TITLE AND GENERAL DESCRIPTION; A proposed one storey- wet and dry market, 2% slope, C-2 B. STATEMENT OF THE PROBLEM: A privately owned company, withits committee, decided to reinvent and expand their existing commercial building that sits on a 5,950 square meter lot and make it into wet and dry market. In order for the market to function, the client required these spaces: stores with an area of 48 square meters per unit, a 40- square meter office, and a32-square meter toilet space. Since the project needs to be sanitary, it requires a garbage pit space to accommodate wastes and residues. C. PROJECT SITE FEATURES: The site is located on a commercial zones area (C-2-). The property is regular inside lot and contains a 40x40 meters existing shed structure which will be preserved and will house other commercial kiosks and stalls for the market. The shorter side of the property stretches up to 70 meter I length and is adjacent and parallel to the 20-meter wide road right of way. The site has an existing 4 parking slots. D. DESIGN OBJECTIVES: A) To plan/design a wet and dry market in accordance to its zone C-2 B) to plan.design a market that maximizes service for the public. C) To plan.design a market that will serve as a landmark for its project location In project no. 3, give on the store is arranges as such so that there will be one unit per bay and is arrayed in one line, what is the recommended wall material in between stores?
chb for added strength
38
A . PROJECT NO. 3. TITLE AND GENERAL DESCRIPTION; A proposed one storey- wet and dry market, 2% slope, C-2 B. STATEMENT OF THE PROBLEM: A privately owned company, withits committee, decided to reinvent and expand their existing commercial building that sits on a 5,950 square meter lot and make it into wet and dry market. In order for the market to function, the client required these spaces: stores with an area of 48 square meters per unit, a 40- square meter office, and a32-square meter toilet space. Since the project needs to be sanitary, it requires a garbage pit space to accommodate wastes and residues. C. PROJECT SITE FEATURES: The site is located on a commercial zones area (C-2-). The property is regular inside lot and contains a 40x40 meters existing shed structure which will be preserved and will house other commercial kiosks and stalls for the market. The shorter side of the property stretches up to 70 meter I length and is adjacent and parallel to the 20-meter wide road right of way. The site has an existing 4 parking slots. D. DESIGN OBJECTIVES: A) To plan/design a wet and dry market in accordance to its zone C-2 B) to plan.design a market that maximizes service for the public. C) To plan.design a market that will serve as a landmark for its project location In project no. 3, based on the acquired building footprint, if the exterior walls all throughout is aligned up to the last floor, what would be the area for the roof if it has 1.20-meters eaves in all sides.
5,272.16 square meters
39
A . PROJECT NO. 3. TITLE AND GENERAL DESCRIPTION; A proposed one storey- wet and dry market, 2% slope, C-2 B. STATEMENT OF THE PROBLEM: A privately owned company, withits committee, decided to reinvent and expand their existing commercial building that sits on a 5,950 square meter lot and make it into wet and dry market. In order for the market to function, the client required these spaces: stores with an area of 48 square meters per unit, a 40- square meter office, and a32-square meter toilet space. Since the project needs to be sanitary, it requires a garbage pit space to accommodate wastes and residues. C. PROJECT SITE FEATURES: The site is located on a commercial zones area (C-2-). The property is regular inside lot and contains a 40x40 meters existing shed structure which will be preserved and will house other commercial kiosks and stalls for the market. The shorter side of the property stretches up to 70 meter I length and is adjacent and parallel to the 20-meter wide road right of way. The site has an existing 4 parking slots. D. DESIGN OBJECTIVES: A) To plan/design a wet and dry market in accordance to its zone C-2 B) to plan.design a market that maximizes service for the public. C) To plan.design a market that will serve as a landmark for its project location In project no. 3, based on the acquired building footprint, if the exterior walls all throughout is aligned up to the last floor, how many 1.2 x 2.4 meters ceiling boars are needed to be installed in the last including the 1.20-meters roof eaves on all sides?
1,831 pieces 1.20 x 2.40 ceiling boars
40
A . PROJECT NO. 3. TITLE AND GENERAL DESCRIPTION; A proposed one storey- wet and dry market, 2% slope, C-2 B. STATEMENT OF THE PROBLEM: A privately owned company, withits committee, decided to reinvent and expand their existing commercial building that sits on a 5,950 square meter lot and make it into wet and dry market. In order for the market to function, the client required these spaces: stores with an area of 48 square meters per unit, a 40- square meter office, and a32-square meter toilet space. Since the project needs to be sanitary, it requires a garbage pit space to accommodate wastes and residues. C. PROJECT SITE FEATURES: The site is located on a commercial zones area (C-2-). The property is regular inside lot and contains a 40x40 meters existing shed structure which will be preserved and will house other commercial kiosks and stalls for the market. The shorter side of the property stretches up to 70 meter I length and is adjacent and parallel to the 20-meter wide road right of way. The site has an existing 4 parking slots. D. DESIGN OBJECTIVES: A) To plan/design a wet and dry market in accordance to its zone C-2 B) to plan.design a market that maximizes service for the public. C) To plan.design a market that will serve as a landmark for its project location Based on the table viii. 2 on rule 7and 8, how much is the minimum required setback, in meters, for basic R-2 zoned structures?
3.00 front, 2.00 sides, 2.00 rear
41
A . PROJECT NO. 3. TITLE AND GENERAL DESCRIPTION; A proposed one storey- wet and dry market, 2% slope, C-2 B. STATEMENT OF THE PROBLEM: A privately owned company, withits committee, decided to reinvent and expand their existing commercial building that sits on a 5,950 square meter lot and make it into wet and dry market. In order for the market to function, the client required these spaces: stores with an area of 48 square meters per unit, a 40- square meter office, and a32-square meter toilet space. Since the project needs to be sanitary, it requires a garbage pit space to accommodate wastes and residues. C. PROJECT SITE FEATURES: The site is located on a commercial zones area (C-2-). The property is regular inside lot and contains a 40x40 meters existing shed structure which will be preserved and will house other commercial kiosks and stalls for the market. The shorter side of the property stretches up to 70 meter I length and is adjacent and parallel to the 20-meter wide road right of way. The site has an existing 4 parking slots. D. DESIGN OBJECTIVES: A) To plan/design a wet and dry market in accordance to its zone C-2 B) to plan.design a market that maximizes service for the public. C) To plan.design a market that will serve as a landmark for its project location Which of the is not part of the building footprint?
basement
42
In Hot-dry climat, what solution is recommended to improve the comfort levet of the interior?
provide larger openings to introduce natural ventilation
43
What is the common term for the part of the total building load contributed by the weight of the structural building elements and material?
dead load
44
The following is not included in architectural interiors, except___________
fittings
45
What is the common term for soil, gravel, or sand used to equalize or raise the surface of the earth?
fill
46
What is the common term for a steel pipe column which is encased in concrete and another steel jacket on the outside to provide fire proofing?
composite structural
47
What is the common term for the process for /to bevel or round off a right angle corner?
chamfer
48
Which slope does not drain well and need to be paved?
1%
49
What is the common term for boundary an?? or topographic mapping of a site?
survery
50
What is the common term for an uncovered space next to the fountain walls of a building, for entrance of light and air to the basement?
driveway
51
Which is not an interior appliance?
exhaust pan
52
Which is not an architectural interior element?
eaves
53
Which color signifies purity and authority?
white
54
What is the maximum desirable grade of streets?
12%
55
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no. 4, what is the range of unpaved surface area (USA) of the project?
350 sqm
56
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. I project no. 4. What is the range of impervious surface area (ISA) of the project?
450 sqm
57
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no. 4, what is the range of the total open spaces within lot (TOSL) of the project?
830 sqm
58
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no. 4, what is the range of the allowable maximum volume of the building (AMVB) for the project considering the floor to floor height is 3 meters?
12,000 cu. m.
59
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no. 4, what is the range of the total gross floor area of the building (TGFA) for the project?
3,200 sqm
60
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no. 4. What is the range of the number of the tiles to be used in the lobby using 600 mm x 600 mm floor tiles?
540 pieces
61
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no.4, given that the slab at second floor is 0.12 meters thick, how may kolgrams of steel reinforcing bars are needed if it requires 15 kilograms of reinforcing bars per cubic meter of concrete?
1,350 kilograms
62
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no. 4, what is the range of the percentage of the sites occupancy of the project?
22% of the total lot area
63
A. PROJECT NO. 4 TITLE AND GENERAL DESCRIPTION: A proposed medium-rise office condominium, building project a development with a basement component and on a project site having a three percent ( 3.0%) slope towards the RROW. B. STATEMENT OF THE PROBLEM: A private development company has axquired a new lot with a total lot area (TLA) of One thousand three hundred fifity square meters (1,350.0 sqm.) shall be developed to host a medium-rise 8-storey condominium building will have a AMBF of 600 SQM. or 25 meters x 24 meters with firewall @ West . The lobby shall have an area of 192.00 sqm. with a least dimension of 8 meters. From second floor to eight floor, the project requires 6 units of office space per floor and areas for stairs, elevator, hallway and toilet. The building has a 3 level basement intended for parking with 600 sqm. at each level. The project also requires a 6.00 meters two-way elevators and stairs at each basements level. C. PROJECTS SITE FEATURES: The project site is rectangular in shape with a frontage of thiety meters (30.00) facing north. The site haeing a 6.00 meters wide driveway at the west portion towards the basements parking. The project required a 12.00 meters setback at front, 5.00 meters driveway at ease sided to serva as easement and 9.00 meters setback at rear. The project site uniformly slopes at three percent (3%) towards the RROW. D. DESIGN OBJECTIVES: A) To plan. Design a high-density commercial building, marketable and attractive to small and medium-sized buyers B) To plan/design the project in a way that can maximize profits for the project proponents, the ratio of saleable spaces based on GFA shall be 70:30; and C) To plan/design a building that shall serve as landmark I host area. In project no.4, what is the range for the area of roof of the project considering a 1.00 meter roof eaves with firewall at the west side of the building?
700 sqm
64
What is the minimum dimension of kitchen?
1.50 m
65
What is the maximum depth of wall shelves?
0.45 m
66
Which type of maps are used to determine erosion potential area?
geological map
67
On rule 7 and 8, how much is the total required minimum setback of the ninth floor or a c-3 zoned structure, based on the required incremental setback per storey above second floor on the rear and sides, from the property line?
4.10 meters
68
Bsed on rule 7 and 8, section 806, how much is the minimum required length of a kitchen?
1.50 m2
69
How much is the easement of the bodies of water for forest area according to the rule 7 and 8, tble viii.g.1?
40 m per side of waterway
70
INDUSTRIAL (Medium Industrial/Manufacturing Building) A proposed garment and undergarment FACTORY project site having four percent (4%) slope STATEMENT OF THE PROBLEM: A privately owned company has decided to erect a building on its property with a Total Lot Area (TLA) of eight thousand square meters (8,000 sqm) located in an industrial zone. The structure to be erected shall be an industrial building PROJECT SITE FEATURES: The project site is a rectangular inside (regular) lot with eighty meter (80m) wide frontage facing west. the project site uniformly slopes at four percent (4%) towards a creek six meter (6m) wide at the east. the side facing west is a road for regular access of container vans and trucks on a 24-hour basis. the road right of way (RROW) is a thrity meter (30m) wide street having a slope of 2/3 or 1% draining north and which has 2.4 meter wide sidewalks at both side. The surface of the sidewalk at the center of the Projects Site frontage is considered as elevation 0.0. The primary RROW is intersected at right angles by two minor streets, each with six meters (6m) RROW. The two (2) corners have six meters (6) "chaflans" with legs of 4.25 meters. To the left of the site are two (2) videoke bars and a restobar with live-band performances, and accross the creek are 2-stprey row houses What is the maximum allowable impervious surface area (ISA) for the project. if the building shall NOT have firewall? the answer is percentage (%) of the Total Lot Area
15
71
INDUSTRIAL (Medium Industrial/Manufacturing Building) A proposed garment and undergarment FACTORY project site having four percent (4%) slope STATEMENT OF THE PROBLEM: A privately owned company has decided to erect a building on its property with a Total Lot Area (TLA) of eight thousand square meters (8,000 sqm) located in an industrial zone. The structure to be erected shall be an industrial building PROJECT SITE FEATURES: The project site is a rectangular inside (regular) lot with eighty meter (80m) wide frontage facing west. the project site uniformly slopes at four percent (4%) towards a creek six meter (6m) wide at the east. the side facing west is a road for regular access of container vans and trucks on a 24-hour basis. the road right of way (RROW) is a thrity meter (30m) wide street having a slope of 2/3 or 1% draining north and which has 2.4 meter wide sidewalks at both side. The surface of the sidewalk at the center of the Projects Site frontage is considered as elevation 0.0. The primary RROW is intersected at right angles by two minor streets, each with six meters (6m) RROW. The two (2) corners have six meters (6) "chaflans" with legs of 4.25 meters. To the left of the site are two (2) videoke bars and a restobar with live-band performances, and accross the creek are 2-stprey row houses For the project site (zoned as industrial 2 under the NBCP) how much is the combined total for the maximum allowable ISA plus minimum USA (in square meters)
1600 (without firewall)
72
INDUSTRIAL (Medium Industrial/Manufacturing Building) A proposed garment and undergarment FACTORY project site having four percent (4%) slope STATEMENT OF THE PROBLEM: A privately owned company has decided to erect a building on its property with a Total Lot Area (TLA) of eight thousand square meters (8,000 sqm) located in an industrial zone. The structure to be erected shall be an industrial building PROJECT SITE FEATURES: The project site is a rectangular inside (regular) lot with eighty meter (80m) wide frontage facing west. the project site uniformly slopes at four percent (4%) towards a creek six meter (6m) wide at the east. the side facing west is a road for regular access of container vans and trucks on a 24-hour basis. the road right of way (RROW) is a thrity meter (30m) wide street having a slope of 2/3 or 1% draining north and which has 2.4 meter wide sidewalks at both side. The surface of the sidewalk at the center of the Projects Site frontage is considered as elevation 0.0. The primary RROW is intersected at right angles by two minor streets, each with six meters (6m) RROW. The two (2) corners have six meters (6) "chaflans" with legs of 4.25 meters. To the left of the site are two (2) videoke bars and a restobar with live-band performances, and accross the creek are 2-stprey row houses For the project site (zoned as 1-2 under the NBCP), How much is the maximum allowable maximum construction are MACA (in square meters), if the building shall not have a firewall?
6800
73
INDUSTRIAL (Medium Industrial/Manufacturing Building) A proposed garment and undergarment FACTORY project site having four percent (4%) slope STATEMENT OF THE PROBLEM: A privately owned company has decided to erect a building on its property with a Total Lot Area (TLA) of eight thousand square meters (8,000 sqm) located in an industrial zone. The structure to be erected shall be an industrial building PROJECT SITE FEATURES: The project site is a rectangular inside (regular) lot with eighty meter (80m) wide frontage facing west. the project site uniformly slopes at four percent (4%) towards a creek six meter (6m) wide at the east. the side facing west is a road for regular access of container vans and trucks on a 24-hour basis. the road right of way (RROW) is a thrity meter (30m) wide street having a slope of 2/3 or 1% draining north and which has 2.4 meter wide sidewalks at both side. The surface of the sidewalk at the center of the Projects Site frontage is considered as elevation 0.0. The primary RROW is intersected at right angles by two minor streets, each with six meters (6m) RROW. The two (2) corners have six meters (6) "chaflans" with legs of 4.25 meters. To the left of the site are two (2) videoke bars and a restobar with live-band performances, and accross the creek are 2-stprey row houses For the project using the prescribed FLAR designation/rights under the NBCP what shall be the maximum Gross floor area (GFA in square meters) that can be generated for the project?
24000
74
INDUSTRIAL (Medium Industrial/Manufacturing Building) A proposed garment and undergarment FACTORY project site having four percent (4%) slope STATEMENT OF THE PROBLEM: A privately owned company has decided to erect a building on its property with a Total Lot Area (TLA) of eight thousand square meters (8,000 sqm) located in an industrial zone. The structure to be erected shall be an industrial building PROJECT SITE FEATURES: The project site is a rectangular inside (regular) lot with eighty meter (80m) wide frontage facing west. the project site uniformly slopes at four percent (4%) towards a creek six meter (6m) wide at the east. the side facing west is a road for regular access of container vans and trucks on a 24-hour basis. the road right of way (RROW) is a thrity meter (30m) wide street having a slope of 2/3 or 1% draining north and which has 2.4 meter wide sidewalks at both side. The surface of the sidewalk at the center of the Projects Site frontage is considered as elevation 0.0. The primary RROW is intersected at right angles by two minor streets, each with six meters (6m) RROW. The two (2) corners have six meters (6) "chaflans" with legs of 4.25 meters. To the left of the site are two (2) videoke bars and a restobar with live-band performances, and accross the creek are 2-stprey row houses For the project under the NBCP and based on the maximum PSO and BHL what shall be the maximum Total Gross Floor Area (TGFA) for the project (in square meters)
117,600