is the electrical interconnection of all metal parts of an aircraft, provided for the following reasons:
2
Reduces radio
3
Battery Operated device
4
pull-off checks
5
to allow for drainage of moisture
6
of insulation damage and fluid contamination.
7
100 degree above the heat shrink temperature
8
Flexibility required Vibration suffered
9
not affected by the length of the cable
10
Where the diameter of cable is not important
11
released from the rear and extracted From the rear
12
The test should be carried out with a 250 V tester.
13
above the fluid line
14
the number of time per second that the meter takes measurement
15
1,999 counts of resolution
16
260 degrees centigrade
17
the shortest pulse width
mod 4 test
mod 4 test
Aljuboory · 81問 · 1年前mod 4 test
mod 4 test
81問 • 1年前mod 2 test
mod 2 test
Aljuboory · 100問 · 1年前mod 2 test
mod 2 test
100問 • 1年前mod 2,2
mod 2,2
Aljuboory · 94問 · 1年前mod 2,2
mod 2,2
94問 • 1年前mod 6,1
mod 6,1
Aljuboory · 277問 · 1年前mod 6,1
mod 6,1
277問 • 1年前c7.1
c7.1
Aljuboory · 18問 · 1年前c7.1
c7.1
18問 • 1年前c7.2
c7.2
Aljuboory · 11問 · 1年前c7.2
c7.2
11問 • 1年前c7.3
c7.3
Aljuboory · 36問 · 1年前c7.3
c7.3
36問 • 1年前c7,4
c7,4
Aljuboory · 20問 · 1年前c7,4
c7,4
20問 • 1年前c7.5
c7.5
Aljuboory · 11問 · 1年前c7.5
c7.5
11問 • 1年前c7.8
c7.8
Aljuboory · 5問 · 1年前c7.8
c7.8
5問 • 1年前c7.9
c7.9
Aljuboory · 8問 · 1年前c7.9
c7.9
8問 • 1年前7.10
7.10
Aljuboory · 12問 · 1年前7.10
7.10
12問 • 1年前c7.11
c7.11
Aljuboory · 6問 · 1年前c7.11
c7.11
6問 • 1年前c7.12
c7.12
Aljuboory · 10問 · 1年前c7.12
c7.12
10問 • 1年前c7.13
c7.13
Aljuboory · 10問 · 1年前c7.13
c7.13
10問 • 1年前c7.14
c7.14
Aljuboory · 17問 · 1年前c7.14
c7.14
17問 • 1年前c7.15
c7.15
Aljuboory · 20問 · 1年前c7.15
c7.15
20問 • 1年前c7.16
c7.16
Aljuboory · 14問 · 1年前c7.16
c7.16
14問 • 1年前c7.17
c7.17
Aljuboory · 14問 · 1年前c7.17
c7.17
14問 • 1年前c7.18
c7.18
Aljuboory · 36問 · 1年前c7.18
c7.18
36問 • 1年前c7.19
c7.19
Aljuboory · 11問 · 1年前c7.19
c7.19
11問 • 1年前c7.20
c7.20
Aljuboory · 18問 · 1年前c7.20
c7.20
18問 • 1年前問題一覧
1
is the electrical interconnection of all metal parts of an aircraft, provided for the following reasons:
2
Reduces radio
3
Battery Operated device
4
pull-off checks
5
to allow for drainage of moisture
6
of insulation damage and fluid contamination.
7
100 degree above the heat shrink temperature
8
Flexibility required Vibration suffered
9
not affected by the length of the cable
10
Where the diameter of cable is not important
11
released from the rear and extracted From the rear
12
The test should be carried out with a 250 V tester.
13
above the fluid line
14
the number of time per second that the meter takes measurement
15
1,999 counts of resolution
16
260 degrees centigrade