    shall be conducted in order to establish set of reference points for a cadastral survey, public land subdivision survey, townsite reservation and other similar survey projects

    project control surveys

  • 2

    instruments to be used for project control survey

    ETS, GNSS RECEIVERS

  • 3

    if ets surveying instruments are to be used the control survey shall be conducted either by _____ and ______

    traverse, triangulation

  • 4

    survey order of project control surveys shall be issued by

    RED

  • 5

    the project area shall be based on the recommendation of the

    RTD for Lands

  • 6

    In a network design for field survey using terrestrial conventional surveying instruments and techniques the ff should be considered the _____ and the physiographic features of the project area. control point should be established on solid ground

    terrain

  • 7

    the intervisibility of the stations shall be the primary concern. the lines connecting the control points within the network should create a closed ______

    polygon

  • 8

    a minimum of ___ reference points (three is preferred) should be visible from each control point.

    2

  • 9

    the network triangles should preferably ______

    equilateral

  • 10

    the available data on old ___________ and __________ based on records

    geodetic and project controls

  • 11

    all the main control points in a proposed cadastral projects and other large survey projects shall be conducted with a primary ____ order accuracy and shall be designated as BLLMS

    3rd

  • 12

    the first primary control point known as P1 shall be designated as

    BLLM # 1

  • 13

    when no location monuments have been previously established a pair of BLLMS to be numbered 1 and 2 shall be approximately plotted on the map at the most suitable

    location

  • 14

    all fixed controls old control points shall be plotted. at least three ____ order or ____ order geodetic control station shall be included in the network

    2nd or 3rd

  • 15

    the main control shall be designed and can be divided into ____ wherein each loops shall start from one geodetic control station and shall close to another geodetic control station

    loops

  • 16

    additional pairs of location monument shall be established along the main control project at an interval of ___ kilometers

    5

  • 17

    the one who provides the ____ distance shall be designated and numbered as BLLM #3 4 5 6

    shorter

  • 18

    the geodetic engineer should ensure that no lots shall have a distance of more than ___ km from the nearest reference point

    1

  • 19

    numbering of control points shall be coordinated with the

    LMS REGIONAL OFFICE

  • 20

    to avoid duplication of cadastral project numbers. lms office shall coordinate with ____ for the numbering

    LMB

  • 21

    Section: 45 Conduct of project control surveys for ets with _____ recorder a printed and a digital file or raw data shall be included in the survey returns

    electronic data

  • 22

    without electronic data recorder all field observations shall be recorded by the geodetic engineer in the _____

    field notes

  • 23

    geodetic engineers in private practice field notes/field notes cover on authorized LMB forms shall be properly filled out and sworn to ______

    before a notary public

  • 24

    geodetic engineers in government, field notes/field notes cover on authorized LMB forms should be sworn to before an official authorized to ______

    subscribe oath

  • 25

    refers to the establishment of main and subsidary controls over the entire area subject of the cadastral project

    project control survey

  • 26

    refers to the establishment of political boundary monuments defining the boundary lines of the entire city/municipality and their component barangay

    political boundary survey

  • 27

    refers to the determination of individual lot boundaries and their corresponding area primarily for the purpose of acquiring title

    lot surveys

  • 28

    the survey of cadastral project shall be considered as in progress from the issuance of survey order/authority contract by _____

    RED

  • 29

    the survey of cadastral project shall be considered as in progress from the issuance of survey order/authority contract by RED until the final approval of the survey returns by _____

    RTD FOR LANDS

  • 30

    Guidelines on the conduct of bidding and awarding of cadastral survey projects contracts

    RA 9184

  • 31

    Regional bids and award committee is headed by

    RTD FOR LANDS

  • 32

    Section 65: The political boundary of the municipality or city covered by a _______ shall be located, marked with concrete monuments and surveyed base on the law or executive orders

    cadastral projects

  • 33

    Section 66: If political boundary survey is an independenr project the hired GE by LGU will conduct the survey and shall required to submit a ______ of the local council

    resolution

  • 34

    Section 71: Pre survey conference Pre survey conference is headed by ____ and assisted by RTD for lands

    RED

  • 35

    CBM

    City Boundary Monument

  • 36

    MBM

    Municipal Boundary Monument

  • 37

    BBM

    Barangay Boundary Monument

  • 38

    Section 74: ______ shall be established at the prominent turns or angles of the boundaries and where they cross roads or large streams

    Political Boundary Monuments

  • 39

    Section 75: In case of boundary dispute a. Corners shall be defined by hardwood post or monuments with a diameter of at least ___ cm and length of 2 cm

    10cm

  • 40

    Section 75: In case of boundary dispute a. Corners shall be defined by hardwood post or monuments with a diameter of at least 10 cm and length of ___ cm

    2

  • 41

    Section 75: In case of boundary dispute b. claims on one lgu shall be indicated by _____ and the other lgus by heavy dash lines

    heavy dotted lines

  • 42

    Section 75: In case of boundary dispute b. claims on one lgu shall be indicated by heavy dotted lines and the other lgus by _____

    heavy dash lines

  • 43

    ______ on division between the lgu as indicated by tax dec

    heavy full line

  • 44

    for lot lines

    ordinary full lines

  • 45

    Section 80: After ___ days of date of issuance of survey order/signing of contract no GE shall be allowed to conduct a survey

    30

  • 46

    Sectio. 81: _____ done to gather information in the field prepare preliminary maps estimated number of lots and serve as guide to the lot survey team

    lot sketching

  • 47

    manufacturing, hauling and the actual setting of the monument in the ground

    monument setting

  • 48

    Sketch plan shall show 1. stream of __ meters or more in width

    5

  • 49

    Sketch plan shall show 2. stream less than __ meters in width thru which water flows continuously

    5

  • 50

    Sketch plan shall show 3. ____, ditches and canals

    irrigation

  • 51

    Sketch plan shall show 4. a strip of __ meters wide starting from the bank on each side of any rivers or stresms

    40

  • 52

    Sketch plan shall show 5. Strip of lands along the edge of the bodies of water shall reserve as easement of public use a. urban areas: __ meters

    3

  • 53

    Sketch plan shall show 5. Strip of lands along the edge of the bodies of water shall reserve as easement of public use b. agricultural areas: __ meters

    20

  • 54

    Sketch plan shall show 5. Strip of lands along the edge of the bodies of water shall reserve as easement of public use c. forested areas: __ meters

    40

  • 55

    if the area is within the __ meter bank protection of a forestland. lands bordering the seas, golfs, bays, or ports that is subjected to easement of salvage zone 20 meters measured landward from the interior limit of the shoreline is needed to reflected in the sketch

    40

  • 56

    a __ meter strip of land along the edge of a normal high waterline on rivers and streams with channels of atleast 5 m wide shall be reflected on the sketch map

    20

  • 57

    lots bordering natural features, if the water is continuously flowing even the width is less than __ meters

    5

  • 58

    a strip of land at least __ meters in width fronting the sea, ocean or other bodies of water that has considerable mangrove trees and was declared mangrove forest

    50

  • 59

    a strip of __ meters on both sides of rivers channels/banks that has existing mangrove plantation

    20

  • 60

    storm prone areas, mangrove forest strip __ meters wide inward along shoreline fronting seas, oceans and other bodies of water and 50 meters strip river bank protection

    100

  • 61

    storm prone areas, mangrove forest strip 100 meters wide inward along shoreline fronting seas, oceans and other bodies of water and __ meters strip river bank protection

    50

  • 62

    __ meter strips of land outside the boundaries and immediately adjacent to designated protected areas

    20

  • 63

    __ meter strip of forest land adjoining community-based forest management projects

    20

  • 64

    __ meters strips of land along the boundaries of reforestation projects adjacent to private alienable/disposable lands

    20

  • 65

    a buffer zone about __ meters of residual forest shall be established immediately surrounding the old growth forest stands.

    100

  • 66

    it shall be concrete and cylindrical in forms at least 10 cm in diameter by 50 cm in length set 15cm above ground and 35 cm below

    standard monument

  • 67

    part of the fence when not less than 10 cm in diameters

    concrete post

  • 68

    living edible fruit trees not less than __ cm in diameters or trees belonging to the first group with diameter not less than 15cm

    15

  • 69

    peg, being in a composition by fire, natural corosion or decay with nominal dimension of __ mm square in cross section for atleast 100 millimeters from the top and not less than 400millimeters in length

    50

  • 70

    peg, being in a composition by fire, natural corosion or decay with nominal dimension of 50 mm square in cross section for atleast __ millimeters from the top and not less than 400millimeters in length

    100

  • 71

    peg, being in a composition by fire, natural corosion or decay with nominal dimension of 50 mm square in cross section for atleast 100 millimeters from the top and not less than __ mm in length

    400

  • 72

    Section 88: acceptable corner markers (substitute markers) 1. acceptable living trees shall be blazed at about __ cm above ground

    20

  • 73

    Section 88: acceptable corner markers (substitute markers) 2. wooden post of narra, ipil, molave yacal of not less than __ cm in diameter

    15

  • 74

    Section 88: acceptable corner markers (substitute markers) 3. metal pipes having an outside diameter greater than __ cm shall be galvanized iron spike/conical hole not exceeding 2 cm in diameter and not less than 1cm depth

    2

  • 75

    cross (x) depth of at least __ mm

    5

  • 76

    ___ measurements are made

    cross (x)

  • 77

    Section 90: Individual lot survey shall only be conducted after a __ day posting of the pis

    30

  • 78

    Section 93: Approved Surveys b. the surrender of approved tracing _____ plan of land surveyed has not been titled and the claimant wants to combine the surveyed area

    cloth/sepia

  • 79

    if the claimant voluntarily excludes portion of of the surveyed and untitled lot. the excluded area shall be numbered as a separate

    cadastral lot

  • 80

    the ff shall be surveyed 1. titled/untitled properties without ____

    lot description

  • 81

    the ff shall be surveyed 2. titled/untitled with ___ or missing lot description

    erroneous

  • 82

    the ff shall be surveyed 3. titled/untitled with technical description from

    magnetic surveys

  • 83

    Section 94: All lands of the public domain shall be surveyed as one lot with the authority of

    RED

  • 84

    Section 97: All other mineral land surveys shall be projected by their tie lines in by coordinates and indicated in the cadastral map as

    dotted lines

  • 85

    Section 98: Public Land Subdivision pls and GSS within the Cadastral projectd the individual lot in the pls/gss be indicated in the map as

    red dotted lines

  • 86

    Article 6: Public Land Subdivision Section 116: Determination of position of the lots boundary from an established reference point using 1. GNSS observation - area is at least

    1,500 has

  • 87

    Article 6: Public Land Subdivision Section 116: Determination of position of the lots boundary from an established reference point using 2. ETS observation fro traverse, triangulation or trilateration from established PRS 92 if the area is below

    1,500 has

  • 88

    lot corners shall be determined by the side shot using conventional instruments with minimum specifications ets: area ___ has

    1,500

  • 89

    one second optica/electronic digital theodolite with edm for distance determination: area _____

    500-1,500 has

  • 90

    six second optical/electronic digital theodolite with edm: area _____

    10-500 has

  • 91

    twenty second engineers transit with 100 meter steel tape: area ____

    5-10 has

  • 92

    thirty second engineers transit with 50 meter steel tape: area ____

    less than 5 has

  • 93

    Section 130: the survey shall be conducted upon issuance of SO/SA from

    DENR officials

  • 94

    no survey on reclaimed lands survey shall be conducted without prior issuance of

    SA

  • 95

    boundary survey shall be first submitted for verification and approval before its subdivision into

    smaller lots

  • 96

    buffer zone ___ meters shall be maintained along the edge of a reclaimed land

    20 meters

  • dmc 2010-13 part 1 section 1 - 28

    dmc 2010-13 part 1 section 1 - 28

    engineer cute · 100問 · 1年前

    dmc 2010-13 part 1 section 1 - 28

    dmc 2010-13 part 1 section 1 - 28

    100問 • 1年前
    engineer cute

    dmc 2010-13 part 2 section 1 - 28

    dmc 2010-13 part 2 section 1 - 28

    engineer cute · 10問 · 1年前

    dmc 2010-13 part 2 section 1 - 28

    dmc 2010-13 part 2 section 1 - 28

    10問 • 1年前
    engineer cute

    survey symbols

    survey symbols

    engineer cute · 95問 · 1年前

    survey symbols

    survey symbols

    95問 • 1年前
    engineer cute

    dao 27

    dao 27

    engineer cute · 59問 · 1年前

    dao 27

    dao 27

    59問 • 1年前
    engineer cute

    dmc 2010 plotting of bbim mbim

    dmc 2010 plotting of bbim mbim

    engineer cute · 14問 · 1年前

    dmc 2010 plotting of bbim mbim

    dmc 2010 plotting of bbim mbim

    14問 • 1年前
    engineer cute

    dmc japun additional

    dmc japun additional

    engineer cute · 16問 · 1年前

    dmc japun additional

    dmc japun additional

    16問 • 1年前
    engineer cute

    bp220

    bp220

    engineer cute · 44問 · 1年前

    bp220

    bp220

    44問 • 1年前
    engineer cute

    geodesy/carto mcq’s

    geodesy/carto mcq’s

    engineer cute · 46問 · 1年前

    geodesy/carto mcq’s

    geodesy/carto mcq’s

    46問 • 1年前
    engineer cute

    agricultural land reform laws

    agricultural land reform laws

    engineer cute · 93問 · 1年前

    agricultural land reform laws

    agricultural land reform laws

    93問 • 1年前
    engineer cute

    2019 terms

    2019 terms

    engineer cute · 28問 · 1年前

    2019 terms

    2019 terms

    28問 • 1年前
    engineer cute

    問題一覧

  • 1

    shall be conducted in order to establish set of reference points for a cadastral survey, public land subdivision survey, townsite reservation and other similar survey projects

    project control surveys

  • 2

    instruments to be used for project control survey

    ETS, GNSS RECEIVERS

  • 3

    if ets surveying instruments are to be used the control survey shall be conducted either by _____ and ______

    traverse, triangulation

  • 4

    survey order of project control surveys shall be issued by

    RED

  • 5

    the project area shall be based on the recommendation of the

    RTD for Lands

  • 6

    In a network design for field survey using terrestrial conventional surveying instruments and techniques the ff should be considered the _____ and the physiographic features of the project area. control point should be established on solid ground

    terrain

  • 7

    the intervisibility of the stations shall be the primary concern. the lines connecting the control points within the network should create a closed ______

    polygon

  • 8

    a minimum of ___ reference points (three is preferred) should be visible from each control point.

    2

  • 9

    the network triangles should preferably ______

    equilateral

  • 10

    the available data on old ___________ and __________ based on records

    geodetic and project controls

  • 11

    all the main control points in a proposed cadastral projects and other large survey projects shall be conducted with a primary ____ order accuracy and shall be designated as BLLMS

    3rd

  • 12

    the first primary control point known as P1 shall be designated as

    BLLM # 1

  • 13

    when no location monuments have been previously established a pair of BLLMS to be numbered 1 and 2 shall be approximately plotted on the map at the most suitable

    location

  • 14

    all fixed controls old control points shall be plotted. at least three ____ order or ____ order geodetic control station shall be included in the network

    2nd or 3rd

  • 15

    the main control shall be designed and can be divided into ____ wherein each loops shall start from one geodetic control station and shall close to another geodetic control station

    loops

  • 16

    additional pairs of location monument shall be established along the main control project at an interval of ___ kilometers

    5

  • 17

    the one who provides the ____ distance shall be designated and numbered as BLLM #3 4 5 6

    shorter

  • 18

    the geodetic engineer should ensure that no lots shall have a distance of more than ___ km from the nearest reference point

    1

  • 19

    numbering of control points shall be coordinated with the

    LMS REGIONAL OFFICE

  • 20

    to avoid duplication of cadastral project numbers. lms office shall coordinate with ____ for the numbering

    LMB

  • 21

    Section: 45 Conduct of project control surveys for ets with _____ recorder a printed and a digital file or raw data shall be included in the survey returns

    electronic data

  • 22

    without electronic data recorder all field observations shall be recorded by the geodetic engineer in the _____

    field notes

  • 23

    geodetic engineers in private practice field notes/field notes cover on authorized LMB forms shall be properly filled out and sworn to ______

    before a notary public

  • 24

    geodetic engineers in government, field notes/field notes cover on authorized LMB forms should be sworn to before an official authorized to ______

    subscribe oath

  • 25

    refers to the establishment of main and subsidary controls over the entire area subject of the cadastral project

    project control survey

  • 26

    refers to the establishment of political boundary monuments defining the boundary lines of the entire city/municipality and their component barangay

    political boundary survey

  • 27

    refers to the determination of individual lot boundaries and their corresponding area primarily for the purpose of acquiring title

    lot surveys

  • 28

    the survey of cadastral project shall be considered as in progress from the issuance of survey order/authority contract by _____

    RED

  • 29

    the survey of cadastral project shall be considered as in progress from the issuance of survey order/authority contract by RED until the final approval of the survey returns by _____

    RTD FOR LANDS

  • 30

    Guidelines on the conduct of bidding and awarding of cadastral survey projects contracts

    RA 9184

  • 31

    Regional bids and award committee is headed by

    RTD FOR LANDS

  • 32

    Section 65: The political boundary of the municipality or city covered by a _______ shall be located, marked with concrete monuments and surveyed base on the law or executive orders

    cadastral projects

  • 33

    Section 66: If political boundary survey is an independenr project the hired GE by LGU will conduct the survey and shall required to submit a ______ of the local council

    resolution

  • 34

    Section 71: Pre survey conference Pre survey conference is headed by ____ and assisted by RTD for lands

    RED

  • 35

    CBM

    City Boundary Monument

  • 36

    MBM

    Municipal Boundary Monument

  • 37

    BBM

    Barangay Boundary Monument

  • 38

    Section 74: ______ shall be established at the prominent turns or angles of the boundaries and where they cross roads or large streams

    Political Boundary Monuments

  • 39

    Section 75: In case of boundary dispute a. Corners shall be defined by hardwood post or monuments with a diameter of at least ___ cm and length of 2 cm

    10cm

  • 40

    Section 75: In case of boundary dispute a. Corners shall be defined by hardwood post or monuments with a diameter of at least 10 cm and length of ___ cm

    2

  • 41

    Section 75: In case of boundary dispute b. claims on one lgu shall be indicated by _____ and the other lgus by heavy dash lines

    heavy dotted lines

  • 42

    Section 75: In case of boundary dispute b. claims on one lgu shall be indicated by heavy dotted lines and the other lgus by _____

    heavy dash lines

  • 43

    ______ on division between the lgu as indicated by tax dec

    heavy full line

  • 44

    for lot lines

    ordinary full lines

  • 45

    Section 80: After ___ days of date of issuance of survey order/signing of contract no GE shall be allowed to conduct a survey

    30

  • 46

    Sectio. 81: _____ done to gather information in the field prepare preliminary maps estimated number of lots and serve as guide to the lot survey team

    lot sketching

  • 47

    manufacturing, hauling and the actual setting of the monument in the ground

    monument setting

  • 48

    Sketch plan shall show 1. stream of __ meters or more in width

    5

  • 49

    Sketch plan shall show 2. stream less than __ meters in width thru which water flows continuously

    5

  • 50

    Sketch plan shall show 3. ____, ditches and canals

    irrigation

  • 51

    Sketch plan shall show 4. a strip of __ meters wide starting from the bank on each side of any rivers or stresms

    40

  • 52

    Sketch plan shall show 5. Strip of lands along the edge of the bodies of water shall reserve as easement of public use a. urban areas: __ meters

    3

  • 53

    Sketch plan shall show 5. Strip of lands along the edge of the bodies of water shall reserve as easement of public use b. agricultural areas: __ meters

    20

  • 54

    Sketch plan shall show 5. Strip of lands along the edge of the bodies of water shall reserve as easement of public use c. forested areas: __ meters

    40

  • 55

    if the area is within the __ meter bank protection of a forestland. lands bordering the seas, golfs, bays, or ports that is subjected to easement of salvage zone 20 meters measured landward from the interior limit of the shoreline is needed to reflected in the sketch

    40

  • 56

    a __ meter strip of land along the edge of a normal high waterline on rivers and streams with channels of atleast 5 m wide shall be reflected on the sketch map

    20

  • 57

    lots bordering natural features, if the water is continuously flowing even the width is less than __ meters

    5

  • 58

    a strip of land at least __ meters in width fronting the sea, ocean or other bodies of water that has considerable mangrove trees and was declared mangrove forest

    50

  • 59

    a strip of __ meters on both sides of rivers channels/banks that has existing mangrove plantation

    20

  • 60

    storm prone areas, mangrove forest strip __ meters wide inward along shoreline fronting seas, oceans and other bodies of water and 50 meters strip river bank protection

    100

  • 61

    storm prone areas, mangrove forest strip 100 meters wide inward along shoreline fronting seas, oceans and other bodies of water and __ meters strip river bank protection

    50

  • 62

    __ meter strips of land outside the boundaries and immediately adjacent to designated protected areas

    20

  • 63

    __ meter strip of forest land adjoining community-based forest management projects

    20

  • 64

    __ meters strips of land along the boundaries of reforestation projects adjacent to private alienable/disposable lands

    20

  • 65

    a buffer zone about __ meters of residual forest shall be established immediately surrounding the old growth forest stands.

    100

  • 66

    it shall be concrete and cylindrical in forms at least 10 cm in diameter by 50 cm in length set 15cm above ground and 35 cm below

    standard monument

  • 67

    part of the fence when not less than 10 cm in diameters

    concrete post

  • 68

    living edible fruit trees not less than __ cm in diameters or trees belonging to the first group with diameter not less than 15cm

    15

  • 69

    peg, being in a composition by fire, natural corosion or decay with nominal dimension of __ mm square in cross section for atleast 100 millimeters from the top and not less than 400millimeters in length

    50

  • 70

    peg, being in a composition by fire, natural corosion or decay with nominal dimension of 50 mm square in cross section for atleast __ millimeters from the top and not less than 400millimeters in length

    100

  • 71

    peg, being in a composition by fire, natural corosion or decay with nominal dimension of 50 mm square in cross section for atleast 100 millimeters from the top and not less than __ mm in length

    400

  • 72

    Section 88: acceptable corner markers (substitute markers) 1. acceptable living trees shall be blazed at about __ cm above ground

    20

  • 73

    Section 88: acceptable corner markers (substitute markers) 2. wooden post of narra, ipil, molave yacal of not less than __ cm in diameter

    15

  • 74

    Section 88: acceptable corner markers (substitute markers) 3. metal pipes having an outside diameter greater than __ cm shall be galvanized iron spike/conical hole not exceeding 2 cm in diameter and not less than 1cm depth

    2

  • 75

    cross (x) depth of at least __ mm

    5

  • 76

    ___ measurements are made

    cross (x)

  • 77

    Section 90: Individual lot survey shall only be conducted after a __ day posting of the pis

    30

  • 78

    Section 93: Approved Surveys b. the surrender of approved tracing _____ plan of land surveyed has not been titled and the claimant wants to combine the surveyed area

    cloth/sepia

  • 79

    if the claimant voluntarily excludes portion of of the surveyed and untitled lot. the excluded area shall be numbered as a separate

    cadastral lot

  • 80

    the ff shall be surveyed 1. titled/untitled properties without ____

    lot description

  • 81

    the ff shall be surveyed 2. titled/untitled with ___ or missing lot description

    erroneous

  • 82

    the ff shall be surveyed 3. titled/untitled with technical description from

    magnetic surveys

  • 83

    Section 94: All lands of the public domain shall be surveyed as one lot with the authority of

    RED

  • 84

    Section 97: All other mineral land surveys shall be projected by their tie lines in by coordinates and indicated in the cadastral map as

    dotted lines

  • 85

    Section 98: Public Land Subdivision pls and GSS within the Cadastral projectd the individual lot in the pls/gss be indicated in the map as

    red dotted lines

  • 86

    Article 6: Public Land Subdivision Section 116: Determination of position of the lots boundary from an established reference point using 1. GNSS observation - area is at least

    1,500 has

  • 87

    Article 6: Public Land Subdivision Section 116: Determination of position of the lots boundary from an established reference point using 2. ETS observation fro traverse, triangulation or trilateration from established PRS 92 if the area is below

    1,500 has

  • 88

    lot corners shall be determined by the side shot using conventional instruments with minimum specifications ets: area ___ has

    1,500

  • 89

    one second optica/electronic digital theodolite with edm for distance determination: area _____

    500-1,500 has

  • 90

    six second optical/electronic digital theodolite with edm: area _____

    10-500 has

  • 91

    twenty second engineers transit with 100 meter steel tape: area ____

    5-10 has

  • 92

    thirty second engineers transit with 50 meter steel tape: area ____

    less than 5 has

  • 93

    Section 130: the survey shall be conducted upon issuance of SO/SA from

    DENR officials

  • 94

    no survey on reclaimed lands survey shall be conducted without prior issuance of

    SA

  • 95

    boundary survey shall be first submitted for verification and approval before its subdivision into

    smaller lots

  • 96

    buffer zone ___ meters shall be maintained along the edge of a reclaimed land

    20 meters