    for Secretary parks and protected areas delimitation surveys, ___ if area covers 2 or more regions

    SO

  • 2

    for Secretary delimitation surveys fro watershed reservation, ___ if area covers 2 or more regions

    SO

  • 3

    for Director LMB political boundary surveys, __ if area involved boundary dispute between tow or more provinces belonging to diff regions

    SO

  • 4

    for Director LMB isolated land surveys, __ if area is covered by special law/proclamation giving jurisdiction to the LMB

    SA

  • 5

    Admin, NAMRIA Delimitation Survey on land classification

    SO

  • 6

    RED, Cadastral Surveys

    SO

  • 7

    RED, Parks and protected areas delimitation survey, __ if area is ____ has and above

    SO, 5000

  • 8

    RED, Political Boundary Survey, __ if there is no involved inter regional boundary dispute

    SO

  • 9

    RED, Delimitation survey for watershed reservation, __ if area in the same region is _____ has and above

    SO, 5000

  • 10

    RED Reclamation project surveys, __ if area is ___ has and above

    SO, 100

  • 11

    RED Isolated land surveys, __ if area is more than __ has

    SO, 100

  • 12

    RED Surveyof LGU lands, __ for area more than __ has

    SO, 100

  • 13

    RED Foreshore land surveys, __ if area is more than ___ has

    SA,100

  • 14

    RTD for lands Political boundary survey __ if the involved are the barangays of the same city or municipality

    SO

  • 15

    RTD for lands Public land subdivision

    SO

  • 16

    Rtd for lands Reclamation project surveys __ if the area is less than __ has

    SO, 100

  • 17

    RTD for lands Townsite Reservation and Group Settlement Surveys, __ if the area is up to ____ has

    SO, 1500

  • 18

    RTD for lands Isolated lnd surveys__ if the area is more than __ has up to 100 has

    SO, 12 up to 100 has

  • 19

    RTD for lands Survey of LGU Lands, __ if area is up to ___

    SO, 100

  • 20

    RTD for lands foreshore land surveys, __ if area is __ has up to __ has

    SA, 12 up to 100

  • 21

    Regional Director MGB Mineral land surveys

    SO

  • 22

    RTD for forestry delimitation survey for watershed reservation, __ if area in the same region is less thn ____ has

    SO, 5000

  • 23

    RTD for PAWCZMS Parks and protected areas delimitation surveys, __ if area is less than ____ has

    SO, 5000

  • 24

    CENRO Isolated surveys__ if area is __ has and below

    SA, 12

  • 25

    CENRO Foreshore land surveys __ if area is __ has and below

    SA, 12 has

  • 26

    Validity period of Survey authority

    6 months

  • 27

    The validity of registration of steel tapes

    2 years or up to 3 breaks

  • 28

    validity of engineers transit and optical electronic theodolites

    3 years

  • 29

    validity of EDM and ETS

    2 years

  • 30

    validity of GNSS receivers

    2 years

  • 31

    Geodetic Control first order relative error

    1/100,000

  • 32

    Geodetic Control second order relative error

    1/50,000

  • 33

    Geodetic control third order relative error

    1/20,000

  • 34

    Geodetic control fourth order relative error

    1/10,000

  • 35

    Geodetic control first order linear error

    1 cm per km

  • 36

    Geodetic control first order nominal space

    50 km

  • 37

    Geodetic control first order vertical accuracy

    4.80 mm multiplied by the square root of the distance

  • 38

    Geodetic control second order linear error

    2cm per km

  • 39

    Geodetic control second order nominal space

    25 km

  • 40

    Geodetic control second order vertical accuracy

    8.40 mm multiplied by the square root of the distance

  • 41

    Geodetic control third order linear error

    5 cm per km

  • 42

    Geodetic control third order vertical accuracy

    12.0 mm multiplied by the square root of distance

  • 43

    Geodetic control fourth order linear error

    10 cm per km

  • 44

    Project control primary control what is the area to be controlled?

    over 15,000 has

  • 45

    Project control primary control what is the accuracy of geodetic control

    3rd order

  • 46

    Project control primary control what is the relative error

    1/20,000

  • 47

    Project control primary control what is the linear error

    5 cm per km

  • 48

    Project control primary control what is the vertical accuracy

    12.0 mm multiplied by the square root of the distance

  • 49

    Project control 3rd order

    Primary control

  • 50

    Project control secondary control what is the area to be controlled

    1,500 to 15,000 has

  • 51

    Project control secondary control

    4th order

  • 52

    Project control secondary what is the relative error

    1/10,000

  • 53

    Project control secondary control what is the linear error

    10 cm per km

  • 54

    Project control tertiary control what is the area to be controlled

    less than 1,500 has

  • 55

    Project control tertiary control what is the relative error

    1/5000

  • 56

    Project control tertiary control what is the linear error

    20 cm per km

  • 57

    In Traverse angular error or closure in primary

    2.5 sq root P

  • 58

    in traverse angular error of closure in secondary

    10.0 sq root S

  • 59

    in traverse angular error of closure in tertiary

    30” sq root T

  • dmc 2010-13 part 1 section 1 - 28

    dmc 2010-13 part 1 section 1 - 28

    engineer cute · 100問 · 1年前

    dmc 2010-13 part 1 section 1 - 28

    dmc 2010-13 part 1 section 1 - 28

    100問 • 1年前
    engineer cute

    dmc 2010-13 part 2 section 1 - 28

    dmc 2010-13 part 2 section 1 - 28

    engineer cute · 10問 · 1年前

    dmc 2010-13 part 2 section 1 - 28

    dmc 2010-13 part 2 section 1 - 28

    10問 • 1年前
    engineer cute

    dmc 2010-13 part 3

    dmc 2010-13 part 3

    engineer cute · 96問 · 1年前

    dmc 2010-13 part 3

    dmc 2010-13 part 3

    96問 • 1年前
    engineer cute

    survey symbols

    survey symbols

    engineer cute · 95問 · 1年前

    survey symbols

    survey symbols

    95問 • 1年前
    engineer cute

    dmc 2010 plotting of bbim mbim

    dmc 2010 plotting of bbim mbim

    engineer cute · 14問 · 1年前

    dmc 2010 plotting of bbim mbim

    dmc 2010 plotting of bbim mbim

    14問 • 1年前
    engineer cute

    dmc japun additional

    dmc japun additional

    engineer cute · 16問 · 1年前

    dmc japun additional

    dmc japun additional

    16問 • 1年前
    engineer cute

    bp220

    bp220

    engineer cute · 44問 · 1年前

    bp220

    bp220

    44問 • 1年前
    engineer cute

    geodesy/carto mcq’s

    geodesy/carto mcq’s

    engineer cute · 46問 · 1年前

    geodesy/carto mcq’s

    geodesy/carto mcq’s

    46問 • 1年前
    engineer cute

    agricultural land reform laws

    agricultural land reform laws

    engineer cute · 93問 · 1年前

    agricultural land reform laws

    agricultural land reform laws

    93問 • 1年前
    engineer cute

    2019 terms

    2019 terms

    engineer cute · 28問 · 1年前

    2019 terms

    2019 terms

    28問 • 1年前
    engineer cute

    問題一覧

  • 1

    for Secretary parks and protected areas delimitation surveys, ___ if area covers 2 or more regions

    SO

  • 2

    for Secretary delimitation surveys fro watershed reservation, ___ if area covers 2 or more regions

    SO

  • 3

    for Director LMB political boundary surveys, __ if area involved boundary dispute between tow or more provinces belonging to diff regions

    SO

  • 4

    for Director LMB isolated land surveys, __ if area is covered by special law/proclamation giving jurisdiction to the LMB

    SA

  • 5

    Admin, NAMRIA Delimitation Survey on land classification

    SO

  • 6

    RED, Cadastral Surveys

    SO

  • 7

    RED, Parks and protected areas delimitation survey, __ if area is ____ has and above

    SO, 5000

  • 8

    RED, Political Boundary Survey, __ if there is no involved inter regional boundary dispute

    SO

  • 9

    RED, Delimitation survey for watershed reservation, __ if area in the same region is _____ has and above

    SO, 5000

  • 10

    RED Reclamation project surveys, __ if area is ___ has and above

    SO, 100

  • 11

    RED Isolated land surveys, __ if area is more than __ has

    SO, 100

  • 12

    RED Surveyof LGU lands, __ for area more than __ has

    SO, 100

  • 13

    RED Foreshore land surveys, __ if area is more than ___ has

    SA,100

  • 14

    RTD for lands Political boundary survey __ if the involved are the barangays of the same city or municipality

    SO

  • 15

    RTD for lands Public land subdivision

    SO

  • 16

    Rtd for lands Reclamation project surveys __ if the area is less than __ has

    SO, 100

  • 17

    RTD for lands Townsite Reservation and Group Settlement Surveys, __ if the area is up to ____ has

    SO, 1500

  • 18

    RTD for lands Isolated lnd surveys__ if the area is more than __ has up to 100 has

    SO, 12 up to 100 has

  • 19

    RTD for lands Survey of LGU Lands, __ if area is up to ___

    SO, 100

  • 20

    RTD for lands foreshore land surveys, __ if area is __ has up to __ has

    SA, 12 up to 100

  • 21

    Regional Director MGB Mineral land surveys

    SO

  • 22

    RTD for forestry delimitation survey for watershed reservation, __ if area in the same region is less thn ____ has

    SO, 5000

  • 23

    RTD for PAWCZMS Parks and protected areas delimitation surveys, __ if area is less than ____ has

    SO, 5000

  • 24

    CENRO Isolated surveys__ if area is __ has and below

    SA, 12

  • 25

    CENRO Foreshore land surveys __ if area is __ has and below

    SA, 12 has

  • 26

    Validity period of Survey authority

    6 months

  • 27

    The validity of registration of steel tapes

    2 years or up to 3 breaks

  • 28

    validity of engineers transit and optical electronic theodolites

    3 years

  • 29

    validity of EDM and ETS

    2 years

  • 30

    validity of GNSS receivers

    2 years

  • 31

    Geodetic Control first order relative error

    1/100,000

  • 32

    Geodetic Control second order relative error

    1/50,000

  • 33

    Geodetic control third order relative error

    1/20,000

  • 34

    Geodetic control fourth order relative error

    1/10,000

  • 35

    Geodetic control first order linear error

    1 cm per km

  • 36

    Geodetic control first order nominal space

    50 km

  • 37

    Geodetic control first order vertical accuracy

    4.80 mm multiplied by the square root of the distance

  • 38

    Geodetic control second order linear error

    2cm per km

  • 39

    Geodetic control second order nominal space

    25 km

  • 40

    Geodetic control second order vertical accuracy

    8.40 mm multiplied by the square root of the distance

  • 41

    Geodetic control third order linear error

    5 cm per km

  • 42

    Geodetic control third order vertical accuracy

    12.0 mm multiplied by the square root of distance

  • 43

    Geodetic control fourth order linear error

    10 cm per km

  • 44

    Project control primary control what is the area to be controlled?

    over 15,000 has

  • 45

    Project control primary control what is the accuracy of geodetic control

    3rd order

  • 46

    Project control primary control what is the relative error

    1/20,000

  • 47

    Project control primary control what is the linear error

    5 cm per km

  • 48

    Project control primary control what is the vertical accuracy

    12.0 mm multiplied by the square root of the distance

  • 49

    Project control 3rd order

    Primary control

  • 50

    Project control secondary control what is the area to be controlled

    1,500 to 15,000 has

  • 51

    Project control secondary control

    4th order

  • 52

    Project control secondary what is the relative error

    1/10,000

  • 53

    Project control secondary control what is the linear error

    10 cm per km

  • 54

    Project control tertiary control what is the area to be controlled

    less than 1,500 has

  • 55

    Project control tertiary control what is the relative error

    1/5000

  • 56

    Project control tertiary control what is the linear error

    20 cm per km

  • 57

    In Traverse angular error or closure in primary

    2.5 sq root P

  • 58

    in traverse angular error of closure in secondary

    10.0 sq root S

  • 59

    in traverse angular error of closure in tertiary

    30” sq root T