ログイン

dmc 2010-13 part 2 section 1 - 28
10問 • 1年前
  • engineer cute
  • 通報

    問題一覧

  • 1

    in connection to existing control 1st order of accuracy what is the minimum observation

    3

  • 2

    in connection to existing control 1st order of accuracy what is the recommended observation

    4 or more

  • 3

    in connection to existing control 2nd order of accuracy what is the minimum observation

    2

  • 4

    in connection to existing control 2nd order of accuracy what is the recommended observation

    3 or more

  • 5

    in connection to existing control 3rd order of accuracy what is the minimum observation

    2

  • 6

    in connection to existing control 3rd order of accuracy what is the recommended observation

    2

  • 7

    minimum of ___ independent observation to ensure true redundancy

    2

  • 8

    time difference between succeeding observation shall be at least ____

    1 hr

  • 9

    old geodetic control points shall be included in the _________ together with the new control points

    geodetic network design

  • 10

    each recovered control points shall have the old ptm ppcs and prs 92 coordinates due to

    number of titled properties are tied to the said monuments

  • dmc 2010-13 part 1 section 1 - 28

    dmc 2010-13 part 1 section 1 - 28

    engineer cute · 100問 · 1年前

    dmc 2010-13 part 1 section 1 - 28

    dmc 2010-13 part 1 section 1 - 28

    100問 • 1年前
    engineer cute

    dmc 2010-13 part 3

    dmc 2010-13 part 3

    engineer cute · 96問 · 1年前

    dmc 2010-13 part 3

    dmc 2010-13 part 3

    96問 • 1年前
    engineer cute

    survey symbols

    survey symbols

    engineer cute · 95問 · 1年前

    survey symbols

    survey symbols

    95問 • 1年前
    engineer cute

    dao 27

    dao 27

    engineer cute · 59問 · 1年前

    dao 27

    dao 27

    59問 • 1年前
    engineer cute

    dmc 2010 plotting of bbim mbim

    dmc 2010 plotting of bbim mbim

    engineer cute · 14問 · 1年前

    dmc 2010 plotting of bbim mbim

    dmc 2010 plotting of bbim mbim

    14問 • 1年前
    engineer cute

    dmc japun additional

    dmc japun additional

    engineer cute · 16問 · 1年前

    dmc japun additional

    dmc japun additional

    16問 • 1年前
    engineer cute

    bp220

    bp220

    engineer cute · 44問 · 1年前

    bp220

    bp220

    44問 • 1年前
    engineer cute

    geodesy/carto mcq’s

    geodesy/carto mcq’s

    engineer cute · 46問 · 1年前

    geodesy/carto mcq’s

    geodesy/carto mcq’s

    46問 • 1年前
    engineer cute

    agricultural land reform laws

    agricultural land reform laws

    engineer cute · 93問 · 1年前

    agricultural land reform laws

    agricultural land reform laws

    93問 • 1年前
    engineer cute

    2019 terms

    2019 terms

    engineer cute · 28問 · 1年前

    2019 terms

    2019 terms

    28問 • 1年前
    engineer cute

    問題一覧

  • 1

    in connection to existing control 1st order of accuracy what is the minimum observation

    3

  • 2

    in connection to existing control 1st order of accuracy what is the recommended observation

    4 or more

  • 3

    in connection to existing control 2nd order of accuracy what is the minimum observation

    2

  • 4

    in connection to existing control 2nd order of accuracy what is the recommended observation

    3 or more

  • 5

    in connection to existing control 3rd order of accuracy what is the minimum observation

    2

  • 6

    in connection to existing control 3rd order of accuracy what is the recommended observation

    2

  • 7

    minimum of ___ independent observation to ensure true redundancy

    2

  • 8

    time difference between succeeding observation shall be at least ____

    1 hr

  • 9

    old geodetic control points shall be included in the _________ together with the new control points

    geodetic network design

  • 10

    each recovered control points shall have the old ptm ppcs and prs 92 coordinates due to

    number of titled properties are tied to the said monuments