問題一覧
1
control surveys
2
geodetic and project control surveys
3
geodetic control surveys
4
gnss receivers
5
RED
6
Professional Geodetic Engineer
7
Namria Administrator
8
Section 4: Organization of the Geodetic Control Survey Party
9
project main office
10
office operations
11
field operations
12
survey control team, reconnaissance and monument recovery, monument setting team
13
project management, technical plans
14
NAMRIA, Survey Returns
15
Geodetic Control Survey Party
16
Financial Plan
17
Equipment
18
days
19
namria topographic map
20
scale
21
control points
22
proposed leveling
23
provincial governors office thru the provincial engineers office, penro, dpwh district engineers office, cenro, city/municipal mayor thru the city or municipal engineers office, head of the field office, barangay chairman, lot/owner claimant
24
geodetic network design
25
prs92
26
50 kilometers
27
25 kilometers
28
5 kilometers
29
variable (each barangay shall have at least a pair of control points not more than 2 km apart
30
intervisibility
31
points can be occupied, located in a stable ground, shall not be affected by any construction activity, swampy or loose areas should be avoided
32
terrain features, availability of old geodetic controls, number of gnss receivers, appropriate number of length of observations
33
available namria topographic map, fixed controls (old control points), points to be established, caution inorder to scale the map correctly, each station numbered in accordance, field reconnaisance
34
3 receivers
35
reconnaissance
36
square based frustum
37
30x30cm
38
40x40cm
39
120 cm
40
20 cm
41
100 cm
42
30x30cm
43
40x40 cm
44
20cm
45
100 cm
46
25x25 cm
47
35x35 cm
48
20 cm
49
100 cm
50
20x20cm
51
35x35 cm
52
100 cm
53
20 cm
54
80 cm
55
concrete monument
56
1:2:4
57
1 cubic meter cement, 2 cubic meter sand, 4 cubic meters gravel or (2 bags of cement, 4 bags of sand, 8 bags of gravel)
58
latitude, longitude, elevation
59
1 to 3000
60
up to 10km
61
limited to static
62
no limitation
63
static, rapid static, kinematic, real-time kinematic
64
model
65
batteries
66
storage
67
receiver setting
68
pivot sites
69
two
70
15
71
coordinate system
72
7, less than 5
73
static mode
74
brass/steel bar
75
second glitch
76
millimeter
77
misread
78
2
79
north
80
height
81
on
82
1hr
83
2hrs
84
at least 30 mins
85
1.5 hrs
86
2 hrs
87
3 hrs
88
4 hrs
89
2
90
at least 30 mins
91
20 mins
92
4
93
35 mins
94
5
95
15 mins
96
6 or more
97
10 mins
98
20mins
99
unbroken data
100
longer
SET 2
SET 2
Angel Borres · 150問 · 6ヶ月前SET 2
SET 2
150問 • 6ヶ月前Lesson 2
Lesson 2
ユーザ名非公開 · 28問 · 9ヶ月前Lesson 2
Lesson 2
28問 • 9ヶ月前LEA 103 SECURITY AND SURVEY INSPECTION 🧚 PART 1
LEA 103 SECURITY AND SURVEY INSPECTION 🧚 PART 1
#100 · 30問 · 1年前LEA 103 SECURITY AND SURVEY INSPECTION 🧚 PART 1
LEA 103 SECURITY AND SURVEY INSPECTION 🧚 PART 1
30問 • 1年前Hydrography
Hydrography
Na Me · 53問 · 1年前Hydrography
Hydrography
53問 • 1年前12. FRIEDHÖFE
12. FRIEDHÖFE
Jobandeep Sandhu · 23問 · 1年前12. FRIEDHÖFE
12. FRIEDHÖFE
23問 • 1年前index 2024
index 2024
Pratyasha Acharya · 93問 · 1年前index 2024
index 2024
93問 • 1年前CA
CA
D · 21問 · 1年前CA
CA
21問 • 1年前yeee boi
yeee boi
Charlie newton · 21問 · 1年前yeee boi
yeee boi
21問 • 1年前cdaan cuối kì
cdaan cuối kì
Kim Luyen · 64問 · 1年前cdaan cuối kì
cdaan cuối kì
64問 • 1年前III Lesson 1
III Lesson 1
Rysol Reyes · 40問 · 1年前III Lesson 1
III Lesson 1
40問 • 1年前survey
survey
KRYZL CHARYNE MICU · 24問 · 1年前survey
survey
24問 • 1年前FIRE PROTECTION AND ARSON INVESTIGATION
FIRE PROTECTION AND ARSON INVESTIGATION
Kristine Azalejrad · 79問 · 1年前FIRE PROTECTION AND ARSON INVESTIGATION
FIRE PROTECTION AND ARSON INVESTIGATION
79問 • 1年前station codes
station codes
Elijah Cresa Lopez · 45問 · 1年前station codes
station codes
45問 • 1年前kye
kye
ユーザ名非公開 · 38問 · 1年前kye
kye
38問 • 1年前問題一覧
1
control surveys
2
geodetic and project control surveys
3
geodetic control surveys
4
gnss receivers
5
RED
6
Professional Geodetic Engineer
7
Namria Administrator
8
Section 4: Organization of the Geodetic Control Survey Party
9
project main office
10
office operations
11
field operations
12
survey control team, reconnaissance and monument recovery, monument setting team
13
project management, technical plans
14
NAMRIA, Survey Returns
15
Geodetic Control Survey Party
16
Financial Plan
17
Equipment
18
days
19
namria topographic map
20
scale
21
control points
22
proposed leveling
23
provincial governors office thru the provincial engineers office, penro, dpwh district engineers office, cenro, city/municipal mayor thru the city or municipal engineers office, head of the field office, barangay chairman, lot/owner claimant
24
geodetic network design
25
prs92
26
50 kilometers
27
25 kilometers
28
5 kilometers
29
variable (each barangay shall have at least a pair of control points not more than 2 km apart
30
intervisibility
31
points can be occupied, located in a stable ground, shall not be affected by any construction activity, swampy or loose areas should be avoided
32
terrain features, availability of old geodetic controls, number of gnss receivers, appropriate number of length of observations
33
available namria topographic map, fixed controls (old control points), points to be established, caution inorder to scale the map correctly, each station numbered in accordance, field reconnaisance
34
3 receivers
35
reconnaissance
36
square based frustum
37
30x30cm
38
40x40cm
39
120 cm
40
20 cm
41
100 cm
42
30x30cm
43
40x40 cm
44
20cm
45
100 cm
46
25x25 cm
47
35x35 cm
48
20 cm
49
100 cm
50
20x20cm
51
35x35 cm
52
100 cm
53
20 cm
54
80 cm
55
concrete monument
56
1:2:4
57
1 cubic meter cement, 2 cubic meter sand, 4 cubic meters gravel or (2 bags of cement, 4 bags of sand, 8 bags of gravel)
58
latitude, longitude, elevation
59
1 to 3000
60
up to 10km
61
limited to static
62
no limitation
63
static, rapid static, kinematic, real-time kinematic
64
model
65
batteries
66
storage
67
receiver setting
68
pivot sites
69
two
70
15
71
coordinate system
72
7, less than 5
73
static mode
74
brass/steel bar
75
second glitch
76
millimeter
77
misread
78
2
79
north
80
height
81
on
82
1hr
83
2hrs
84
at least 30 mins
85
1.5 hrs
86
2 hrs
87
3 hrs
88
4 hrs
89
2
90
at least 30 mins
91
20 mins
92
4
93
35 mins
94
5
95
15 mins
96
6 or more
97
10 mins
98
20mins
99
unbroken data
100
longer