    essentially employs a prime mover coupled to an alternator for production of electric power

    Generating Station

  • 2

    the connecting links between the generating station and the distribution system and lead to other power system over interconnection.

    Transmission System

  • 3

    it connects all the individual loads in a given locality to the transmission

    Distribution System

  • 4

    It is the opposition of line conductors to current flow. Distributed uniformly along the whole length of the line as shown in the figure

    Resistance

  • 5

    When an alternating current flows through a conductor, a changing flux is set up which links the conductor. Due to these flux linkages.

    Inductance

  • 6

    We know that any two conductors separated by an insulating material constitute a capacitor. As any two conductors of an overhead transmission lines are separated by air which act as an insulation.

    Capacitance

  • 7

    When the length of an overhead transmission line is up to about to 50km and the line voltage is comparatively low (<20 kV)

    Short Transmission Line

  • 8

    When the length of of an overhead transmission line is about 50-150km and the line voltage is moderately high (>20kV<100 kV)

    Medium Transmission Line

  • 9

    When the length of an overhead transmission line is more than 150 km and line voltage is very high (>100kV)

    Long Transmission Line

  • 10

    When a transmission line is carrying current there is a voltage drop in the line due to the resistance and inductance of the line

    Voltage Regulation

  • 11

    The power obtained at the receiving end of a transmission line is generally less than the sending end power due to losses in the line resistance.

    Transmission Efficiency

  • 12

    is the plot variation of load demand with respect to time

    Load Curve

  • 13

    __________ defined as the maximum load occuring in the time under consideration.

    Peak and Maximum Demand

  • 14

    is define as the ratio of average load during a period to maximum load during the same period

    Load Factor

  • 15

    applies to a group of loads whose individual maximum demand do not all ocur at the same time

    Diversity Factor

  • 16

    The difference between the maximum demand and the effective plant rating is known as _________

    Generating Plant Margin

  • 17

    Largest and the most Complex man made system

    Power System

  • 18

    The number 1 goal is to design a power system which will not present any electrical hazard to the people who utilize the facility and/or the utilization equipment fed from the electrical system.

    Safety

  • 19

    as well as local electrical codes provide a minimum standards and requirements in the area of wiring design and protection.

    NEC- NATIONAL ELECTRICAL CODE

  • 20

    The owners overall budget for first cost purchase and installation of the electrical distribution system and electrical utilization equipment will be a key factor in determining which of various alternate system designs are to be selected

    Minimum Initial Investment

  • 21

    The degree of service ______ and _______ needed will vary depending on the type and use of the facility as well as the loads or processes being supplied by the electrical distribution system

    Maximum Service Continuity, Continuity and Reliability

  • 22

    In industrial manufacturing plants, electrical utilization loads are periodically relocated or changed requiring changes in the electrical distribution system

    Maximum Flexibility and Expandability

  • 23

    Electrical Efficiency can generally be _______ by designing systems that minimize the losses in conductors, transformers and utilization equipment. Proper Voltage level

    Maximum Electrical Efficiency, Maximized

  • 24

    Usually the simpler the electrical system design and the simpler the electrical equipment , the less the associated maintenance cost and operators errors

    Maximum Maintenance Cost

  • 25

    The power input requirements of all utilization equipment has to be considered including the acceptable operating range or the equipment and the electrical distribution system has to be designed to meet these needs

    Maximum Power Quality

  • 26

    simply the conversion of energy from one form to another

    Generation

  • 27

    The machine used in fossil generation are highspeed but ________

    Slow Starting

  • 28

    the main issues are environmental as burning of fuel causes pollution therefore__________ used

    Low Sulphur Content Fuel

  • 29

    Are slow machines but they are quick starting and have a good ramping rate

    Hydral Machines

  • 30

    In nuclear plants, the basic cycle is similar to that of fossil plant but the required heat is provided by the ________rather from burning fuels

    nuclear reaction

  • 31

    The transmission line maybe _____ or _____depending upon the application

    AC or DC

  • 32

    The Overhead AC lines are applied on power system at voltages in the range of

    115KV TO 800KV

  • 33

    either solid round, stranded or bundled stranding provides flexibility

    Conductors

  • 34

    acts as a shield to protect the energized conductors from lightning strokes

    Groundwires

  • 35

    Suspend the energized phase conductors and insulate them from ground tower

    Insulators

  • 36

    DC lines are sometimes called _________since they can be used to interconnect two systems operating at different frequencies

    Asynchronous Ties

  • 37

    In this mode of transmission the _________ voltages and currents are converted to DC line and are converted back to AC at the other end

    3 phase, 60hz

  • 38

    are used in very densely populated area but they are rarely used because they are more expensive as they are require insulating materials instead of air to separate the conductors from each other and from ground.

    Underground Cables

  • 39

    the utilization of electric power is collectively called

    loads

  • 40

    There are also some technical disadvantages associated with underground Cables. One major problem is the___________in the underground cables

    very high capacitance inherent

  • 41

    The capacitance gives rise to ___________special equipment must be installed to compensate for the effect of charging currents which adds to the cost

    charging current

  • 42

    Power Monitoring communication systems connected to _____________ can provide the trending and historical data necessary for future capacity growth.

    Electronic Metering

  • EE14 MIDTERM REVIEWER

    EE14 MIDTERM REVIEWER

    PJ ZERO · 42問 · 2年前

    EE14 MIDTERM REVIEWER

    EE14 MIDTERM REVIEWER

    42問 • 2年前
    PJ ZERO

    FME9 MIDTERM EXAM

    FME9 MIDTERM EXAM

    PJ ZERO · 25問 · 2年前

    FME9 MIDTERM EXAM

    FME9 MIDTERM EXAM

    25問 • 2年前
    PJ ZERO

    FME9 2

    FME9 2

    PJ ZERO · 22問 · 2年前

    FME9 2

    FME9 2

    22問 • 2年前
    PJ ZERO

    EEE2 QUIZ

    EEE2 QUIZ

    PJ ZERO · 30問 · 2年前

    EEE2 QUIZ

    EEE2 QUIZ

    30問 • 2年前
    PJ ZERO

    FLUIDS FINALS

    FLUIDS FINALS

    PJ ZERO · 24問 · 2年前

    FLUIDS FINALS

    FLUIDS FINALS

    24問 • 2年前
    PJ ZERO

    FLUIDS FINALS

    FLUIDS FINALS

    PJ ZERO · 24問 · 2年前

    FLUIDS FINALS

    FLUIDS FINALS

    24問 • 2年前
    PJ ZERO

    FLUIDS MIDTERM REVIEWER

    FLUIDS MIDTERM REVIEWER

    PJ ZERO · 13問 · 1年前

    FLUIDS MIDTERM REVIEWER

    FLUIDS MIDTERM REVIEWER

    13問 • 1年前
    PJ ZERO

    問題一覧

  • 1

    essentially employs a prime mover coupled to an alternator for production of electric power

    Generating Station

  • 2

    the connecting links between the generating station and the distribution system and lead to other power system over interconnection.

    Transmission System

  • 3

    it connects all the individual loads in a given locality to the transmission

    Distribution System

  • 4

    It is the opposition of line conductors to current flow. Distributed uniformly along the whole length of the line as shown in the figure

    Resistance

  • 5

    When an alternating current flows through a conductor, a changing flux is set up which links the conductor. Due to these flux linkages.

    Inductance

  • 6

    We know that any two conductors separated by an insulating material constitute a capacitor. As any two conductors of an overhead transmission lines are separated by air which act as an insulation.

    Capacitance

  • 7

    When the length of an overhead transmission line is up to about to 50km and the line voltage is comparatively low (<20 kV)

    Short Transmission Line

  • 8

    When the length of of an overhead transmission line is about 50-150km and the line voltage is moderately high (>20kV<100 kV)

    Medium Transmission Line

  • 9

    When the length of an overhead transmission line is more than 150 km and line voltage is very high (>100kV)

    Long Transmission Line

  • 10

    When a transmission line is carrying current there is a voltage drop in the line due to the resistance and inductance of the line

    Voltage Regulation

  • 11

    The power obtained at the receiving end of a transmission line is generally less than the sending end power due to losses in the line resistance.

    Transmission Efficiency

  • 12

    is the plot variation of load demand with respect to time

    Load Curve

  • 13

    __________ defined as the maximum load occuring in the time under consideration.

    Peak and Maximum Demand

  • 14

    is define as the ratio of average load during a period to maximum load during the same period

    Load Factor

  • 15

    applies to a group of loads whose individual maximum demand do not all ocur at the same time

    Diversity Factor

  • 16

    The difference between the maximum demand and the effective plant rating is known as _________

    Generating Plant Margin

  • 17

    Largest and the most Complex man made system

    Power System

  • 18

    The number 1 goal is to design a power system which will not present any electrical hazard to the people who utilize the facility and/or the utilization equipment fed from the electrical system.

    Safety

  • 19

    as well as local electrical codes provide a minimum standards and requirements in the area of wiring design and protection.

    NEC- NATIONAL ELECTRICAL CODE

  • 20

    The owners overall budget for first cost purchase and installation of the electrical distribution system and electrical utilization equipment will be a key factor in determining which of various alternate system designs are to be selected

    Minimum Initial Investment

  • 21

    The degree of service ______ and _______ needed will vary depending on the type and use of the facility as well as the loads or processes being supplied by the electrical distribution system

    Maximum Service Continuity, Continuity and Reliability

  • 22

    In industrial manufacturing plants, electrical utilization loads are periodically relocated or changed requiring changes in the electrical distribution system

    Maximum Flexibility and Expandability

  • 23

    Electrical Efficiency can generally be _______ by designing systems that minimize the losses in conductors, transformers and utilization equipment. Proper Voltage level

    Maximum Electrical Efficiency, Maximized

  • 24

    Usually the simpler the electrical system design and the simpler the electrical equipment , the less the associated maintenance cost and operators errors

    Maximum Maintenance Cost

  • 25

    The power input requirements of all utilization equipment has to be considered including the acceptable operating range or the equipment and the electrical distribution system has to be designed to meet these needs

    Maximum Power Quality

  • 26

    simply the conversion of energy from one form to another

    Generation

  • 27

    The machine used in fossil generation are highspeed but ________

    Slow Starting

  • 28

    the main issues are environmental as burning of fuel causes pollution therefore__________ used

    Low Sulphur Content Fuel

  • 29

    Are slow machines but they are quick starting and have a good ramping rate

    Hydral Machines

  • 30

    In nuclear plants, the basic cycle is similar to that of fossil plant but the required heat is provided by the ________rather from burning fuels

    nuclear reaction

  • 31

    The transmission line maybe _____ or _____depending upon the application

    AC or DC

  • 32

    The Overhead AC lines are applied on power system at voltages in the range of

    115KV TO 800KV

  • 33

    either solid round, stranded or bundled stranding provides flexibility

    Conductors

  • 34

    acts as a shield to protect the energized conductors from lightning strokes

    Groundwires

  • 35

    Suspend the energized phase conductors and insulate them from ground tower

    Insulators

  • 36

    DC lines are sometimes called _________since they can be used to interconnect two systems operating at different frequencies

    Asynchronous Ties

  • 37

    In this mode of transmission the _________ voltages and currents are converted to DC line and are converted back to AC at the other end

    3 phase, 60hz

  • 38

    are used in very densely populated area but they are rarely used because they are more expensive as they are require insulating materials instead of air to separate the conductors from each other and from ground.

    Underground Cables

  • 39

    the utilization of electric power is collectively called

    loads

  • 40

    There are also some technical disadvantages associated with underground Cables. One major problem is the___________in the underground cables

    very high capacitance inherent

  • 41

    The capacitance gives rise to ___________special equipment must be installed to compensate for the effect of charging currents which adds to the cost

    charging current

  • 42

    Power Monitoring communication systems connected to _____________ can provide the trending and historical data necessary for future capacity growth.

    Electronic Metering