問題一覧
1
Computing Platform
2
(1945–55) Vacuum Tubes
3
Process
4
Process
5
Program
6
Multiprogramming
7
Sequential Process
8
Process Creation
9
Normal Exit, Error Exit
10
Fatal Error, Killed by another process
11
Running
12
Ready
13
Blocked
14
Lowest Layer
15
Above Layer
16
Process Table
17
Interrupt Handling and Scheduling
18
Modelling of Multiprogramming
19
Threads
20
Dispatcher
21
Multithreading
22
Inter-process Communication (IPC)
23
Race Conditions
24
Mutual Exclusion (mutex)
25
No Assumption
26
Progress
27
No Starvation
28
Critical Region
29
Strict Alternation
30
Producer Consumer Problem
31
Dining Philosophers Problem
32
Readers Writers Problem
33
Processes
34
Process Control Blocks (PCBs)
35
CreateProcess (Windows), fork/exec (Unix)
36
Scheduling, I/O, creation, termination
37
Running, ready, waiting
38
Process states, process queues, context switches
39
ICs and Multiprogramming
40
Hardware Architecture
41
Operating Systems
42
1959 to present
43
1981 to present
44
1983 to present
45
1992 to present
46
2000 to present
47
Thread Usage - A Word Processor
48
Thread Usage - A Multithreaded Web Server
49
CPU-Bound
50
I/O Bound
51
Scheduling
52
Batch
53
Interactive
54
Real-time
55
Non-preemptive scheduling
56
Preemptive Scheduling
57
First-Come, First-Served (FCFS)
58
Shortest Job First (SJF)
59
Round-Robin Scheduling
60
Multiple-level feedback queues (MLFQ)
61
Priority Scheduling
62
Earliest Deadline First (EDF)
63
Scheduling Summary
64
Parallel Communication
65
Serial Communication
66
Network
67
Node
68
Link
69
Physical Topology
70
Logical Topology
71
Speed
72
Cost
73
Security
74
Availability
75
Scalability
76
Reliability
77
Point to Point
78
Multipoint
79
Unicast, Multicast, Broadcast
80
Mesh
81
Star
82
Bus
83
Ring
84
Hybrid
85
LAN
86
WAN
87
PAN
88
MAN
89
File Systems
90
1725
91
1846
92
1946
93
1950s
94
1963
95
1960s
96
1969
97
1979
98
1995
99
2000
100
2000s
ART APP
ART APP
dulsetnet · 54問 · 1年前ART APP
ART APP
54問 • 1年前NET1
NET1
dulsetnet · 79問 · 2年前NET1
NET1
79問 • 2年前DB1
DB1
dulsetnet · 108問 · 2年前DB1
DB1
108問 • 2年前NET1
NET1
dulsetnet · 79問 · 2年前NET1
NET1
79問 • 2年前PT2
PT2
dulsetnet · 111問 · 2年前PT2
PT2
111問 • 2年前PT2
PT2
dulsetnet · 38問 · 2年前PT2
PT2
38問 • 2年前DB1
DB1
dulsetnet · 108問 · 2年前DB1
DB1
108問 • 2年前NET1
NET1
dulsetnet · 79問 · 2年前NET1
NET1
79問 • 2年前DB1
DB1
dulsetnet · 108問 · 2年前DB1
DB1
108問 • 2年前HCI
HCI
dulsetnet · 12問 · 1年前HCI
HCI
12問 • 1年前IPT
IPT
dulsetnet · 86問 · 1年前IPT
IPT
86問 • 1年前ETHICS
ETHICS
dulsetnet · 98問 · 1年前ETHICS
ETHICS
98問 • 1年前ART APPRECIATION
ART APPRECIATION
dulsetnet · 81問 · 1年前ART APPRECIATION
ART APPRECIATION
81問 • 1年前SAM41A
SAM41A
dulsetnet · 49問 · 1年前SAM41A
SAM41A
49問 • 1年前SIP
SIP
dulsetnet · 79問 · 1年前SIP
SIP
79問 • 1年前問題一覧
1
Computing Platform
2
(1945–55) Vacuum Tubes
3
Process
4
Process
5
Program
6
Multiprogramming
7
Sequential Process
8
Process Creation
9
Normal Exit, Error Exit
10
Fatal Error, Killed by another process
11
Running
12
Ready
13
Blocked
14
Lowest Layer
15
Above Layer
16
Process Table
17
Interrupt Handling and Scheduling
18
Modelling of Multiprogramming
19
Threads
20
Dispatcher
21
Multithreading
22
Inter-process Communication (IPC)
23
Race Conditions
24
Mutual Exclusion (mutex)
25
No Assumption
26
Progress
27
No Starvation
28
Critical Region
29
Strict Alternation
30
Producer Consumer Problem
31
Dining Philosophers Problem
32
Readers Writers Problem
33
Processes
34
Process Control Blocks (PCBs)
35
CreateProcess (Windows), fork/exec (Unix)
36
Scheduling, I/O, creation, termination
37
Running, ready, waiting
38
Process states, process queues, context switches
39
ICs and Multiprogramming
40
Hardware Architecture
41
Operating Systems
42
1959 to present
43
1981 to present
44
1983 to present
45
1992 to present
46
2000 to present
47
Thread Usage - A Word Processor
48
Thread Usage - A Multithreaded Web Server
49
CPU-Bound
50
I/O Bound
51
Scheduling
52
Batch
53
Interactive
54
Real-time
55
Non-preemptive scheduling
56
Preemptive Scheduling
57
First-Come, First-Served (FCFS)
58
Shortest Job First (SJF)
59
Round-Robin Scheduling
60
Multiple-level feedback queues (MLFQ)
61
Priority Scheduling
62
Earliest Deadline First (EDF)
63
Scheduling Summary
64
Parallel Communication
65
Serial Communication
66
Network
67
Node
68
Link
69
Physical Topology
70
Logical Topology
71
Speed
72
Cost
73
Security
74
Availability
75
Scalability
76
Reliability
77
Point to Point
78
Multipoint
79
Unicast, Multicast, Broadcast
80
Mesh
81
Star
82
Bus
83
Ring
84
Hybrid
85
LAN
86
WAN
87
PAN
88
MAN
89
File Systems
90
1725
91
1846
92
1946
93
1950s
94
1963
95
1960s
96
1969
97
1979
98
1995
99
2000
100
2000s