問題一覧
1
An exercise given to the Client for him to review the stipulations of the contract documents within a reasonable nime.
Due Diligence
2
A principle, when drafting the contract, where parties are bound by terms and consequences
Mutuality
3
Instructions which may be issued prior to the bidding to supplement and/or modify the drawings, specifications, and/or General Conditions of the contract.Instructions which may be issued prior to the bidding to supplement and/or modify the drawings, specifications, and/or General Conditions of the contract.
Special Provisions
4
Information, advice a notification pertinent to the project delivered in person or sent by registered mall to the individual, firm or corporation at the last known business address of such individual, firm or corporation
Written Notice
5
An approved form of security furnished by the contractor a guarantee to the quality of materials and equipment installed and the workmanship performed by the Contractor.
Guarantee Bond
6
A period wherein the Contractor shall execute at his own expense all work necessary for the rectification of Imperfections.A period wherein the Contractor shall execute at his own expense all work necessary for the rectification of Imperfections.
Period of making good the known defects
7
Article 1723 of the civil code
Civil Liability of Architects and Engineers
8
An approved form of security furnished by the contractor as a guarantee of good faith on his part that he will pay all obligations arising from the contract.
Payment Bond
9
The amount retained by the Owner under the provision of the contract.The amount retained by the Owner under the provision of the contract.
Retention Bond
10
Labor or materials, or both as weil as equipment, transportation, or other facilities necessary to commence and complete the construction called for in the Contract.Labor or materials, or both as weil as equipment, transportation, or other facilities necessary to commence and complete the construction called for in the Contract.
Work
11
Additional information on contract documents issued to bidders before date of bidding
Bid Bulletin
12
Allocated payment value in proportion to the work performed by the Contractor.
Pro-Rata Payment
13
it is an outline description enumerating the type or trade names of materials be used.
Schedule Of Materials And Finishes
14
An approved form of security furnished by the Contractor as a guarantee of good faith that he will execute the work in accorcance with the terms of the contract.
Performance Bond
15
A principle, when drating the contract, which binds only those involved and assigns.
Relativity
16
Article 1305 of the Civil Code
Def. Of A Contract
17
A contractual obligation of one party to compensate the loss incurred to the other party or as a security against legal lability for one's actions
Indemnity
18
A contract, represented by a policy, in which the client receives financial protection or reimbursement against losses in case of claims on damages on lives and properties lost or affected,
Insurance
19
The Client shall at all times provide and maintain adequate weather tight temporary office with water, light, telephone, and toilet facilittes for the use of the Architect, resident engineers, Inspectors, contractor, and sub-contractors.The Client shall at all times provide and maintain adequate weather tight temporary office with water, light, telephone, and toilet facilittes for the use of the Architect, resident engineers, Inspectors, contractor, and sub-contractors.
False
20
A listing of the different parts of the work indicating the materials and labor Included therein.A listing of the different parts of the work indicating the materials and labor Included therein.
Scope Of Work
21
A listing of the different parts of the work indicating in each part the corresponding value of materials and labor, including an allowance for profit and overhead.
Breakdown Of Work And Corresponding Value
22
Technically qualified men referred to as Project Representatives, resident Architects, Resident Engineers or Construction Inspectors employed by the Owner may be stationed on the Project to assist the Architect and the Engineers in the general supervision and direction of the Work: In case of any dispute arising between the Project Representative, Resident Architect, Resident Engineer, or Construction Inspector, and the Contractor, they shall have authority to reject materials or suspend the work until the question at Issue can be referred to and decide by the Client.Technically qualified men referred to as Project Representatives, resident Architects, Resident Engineers or Construction Inspectors employed by the Owner may be stationed on the Project to assist the Architect and the Engineers in the general supervision and direction of the Work: In case of any dispute arising between the Project Representative, Resident Architect, Resident Engineer, or Construction Inspector, and the Contractor, they shall have authority to reject materials or suspend the work until the question at Issue can be referred to and decide by the Client.
True
23
Neither the final certificate nor payment nor any provision in the Contract Documents shall relieve the Contractor of responsibility for faulty materials or workmanship and, he shall remedy any defects due thereto and pay for any damage to other work resulting there from, which shall appear within a period of one year from the date of acceptance of work.
True
24
The drawings and specifications are supplementary.The drawings and specifications are supplementary.
False
25
The Contractor shall use such methods and appliances for the performance of all the operations connected with the work embraced under this Contract as will produce a satisfactory quality of work and rate of progress which will ensure the completion of the work within the contract time.The Contractor shall use such methods and appliances for the performance of all the operations connected with the work embraced under this Contract as will produce a satisfactory quality of work and rate of progress which will ensure the completion of the work within the contract time.
True
26
Should the Contractor fail to remove unsatisfactory workmen or fall to furnish suitable and sufficient equipment or personnel for the proper prosecution of the work, the Construction Manager may withhold payment which are or may become due or may suspend the work until such orders are complied with.Should the Contractor fail to remove unsatisfactory workmen or fall to furnish suitable and sufficient equipment or personnel for the proper prosecution of the work, the Construction Manager may withhold payment which are or may become due or may suspend the work until such orders are complied with.
True
27
it, in the Contractor's opinion, any work indicated on the drawings, or specified in such manner as will make impossible to produce a first-class work, he shall refer same to the Architect for interpretation before proceeding with work if the contractor falls to make such reference
True
28
The Client shall prepare at his own expense and submit with slich promptness as to cause no delay in his own work or in that of any other contractor doing work on the same building, two copies of all shop or setting drawings, templates, patterns and models as weil as schedule required for the work of the various trades
False
29
Before the bidding and the awarding f the contract, the Contractor Is expected to have visited the lacality of the work and made his own estimates of the facilities and difficulties attending to the execution of the proposed contract, including local conditions and all other contingencies
True
30
The Contractor shall and thereby warrants and/or guarantees for a period of one year, or for longer periods where so provided in Specifications, as evidenced by date of final certificate Issued by the Architect, all materials and workmanship Installed under Contract to be of good quality in every respect and to remain so for periods described herein.
True
31
The Project engineer or Superintendent shall represent the Contractor in his absence and all directions given to him shall be as binding as if given to the Contractor. He shall have full authority to execute the orders or directions without delay and to prompt supply such materials, tools, paints, equipment, and labor as may be required:
True
32
The Client shall make all necessary arrangements with the local utility companies in order that temporary facilities for water, power, and telephone are sufficiently provided till the completion of the work. All expenses incurred in connections therewith shall be paid by the Client
False
33
Upon failure to complete the said contract within the contract time, the Contractor shall be required to pay the Owner the liquidated damages in the amount stipulated in the Contract Agreement, the said payment to be made as liquidated damages, and not by way of penalty.
True
34
Good specifications expand or clarify drawing notes, define quality of materials and workmanship, establish the scope of the work, and describe the responsibilities of the constructor
True
35
Responsibility for adequacy of the design and for sufficiency of the drawings and specifications shall be borne by the Contractor
False
36
if there be variance between drawings and the Specifications, the provisions of the specifications shall control,if there be variance between drawings and the Specifications, the provisions of the specifications shall control,
True
37
The compiete requirements of the work to be performed under the contract shali be set forth in drawings and specifications to be supplied by the Contractor
False
38
The Contractor shall furnish from time to time all additional detail drawings and Instructions essential to the proper execution of the work.
False
39
The Contractor shall keep at the site of work, in good order one copy each of all drawings, specifications, Breakdown of work, Schedule of Construction Work and including all instructions and graphs avallable to the Architect and his representatives:
True
40
Should a conflict occur between Drawings, or a conflict between specifications and Drawings, the Contractor shall be deemed to have estimated a more expensive way of doing work unless he shall gave asked for and obtained a decision
True
41
The Owner shall be responsible for the establishment of lot lines, boundary lines, easement, and benchmarks by a certified surveyor.The Owner shall be responsible for the establishment of lot lines, boundary lines, easement, and benchmarks by a certified surveyor.
True
42
Testing of all samples shall comply with the Specifications and government standards and shall be performed by competent entity or testing faboratory. All cost for shipment, delivery, handling, and testing of sampies are to be paid by the Owner.
False
43
The Contractor shall perform any work and shall furnish and install all materials and equipment necessary during an emergency endangering life or property. He shall not wait for instructions before proceeding to properly protect both life and property.
True
44
The Architect may at any time order extra work or make changes by altering, adding to or deducting from the work.
False
45
At the completion of the work, the Architect shall remove all his rubbish from and about the bullding and all his tools, scaffolding and surplus materiais and turn over the work for occupancy with.
False
46
The Owner shall have the right to take possession of and use any completed or partially completed portions of the work
True
47
The Contractor shall execute at his own expense all work necessary for making good of known defect, Imperfections or fault
True
48
The Owner cannot deduct from any sum due or to become due the Contractor any sums accruing for liquidated damage
False
49
The Owner reserves the right to let other contracts in connection with the work.
True
50
The Client and the sub contractor has no contract relations.
True
51
the Owner should fail to pay the contractor any sum within (30) days, the contractor may suspend work or terminate contract
True
52
The Owner, at any time, may terminate the Contract due to bankruptcy reason.
True
53
The Contract can be assigned in whole or in part by the Contractor or shall any part of the work be subiet by the Contractor.
False
54
The right to enter contract is one of the liberties guaranteed to individual.
True
55
The Engineer shall pay for services of a licensed surveyor when so required to confirm and certify the location of column centers, piers, wall, pits, trenches, pipe work, culvert work, utility lines and work of similar nature required by the Contract
False
56
No substitution shali be made for any material, articie, or process required under ContractNo substitution shali be made for any material, articie, or process required under Contract
True
57
The Contractor shall not be liable and should not pay for all damages occasioned in any manner by his acts or neglect, or of his agents, employees, or workmen, if neighboring properties are damaged due to his negligence or fault.
False
58
Should the Contractor be obstructed or delayed in the prosecution or completion of the work by Act of God or Force Majeure, such delay may be granted, such period considered reasonable, with an extension of time:
True
59
No such extension of time shall be granted for any alleged fallure to furnish materials or Information unless they be required in the proper prosecution of the work in the order.
True
60
The Engineer shall pay workmen employed by him on his project such rates as are provided by existing laws:The Engineer shall pay workmen employed by him on his project such rates as are provided by existing laws:
False