問題一覧
1
It is defined as a rule of conduct
Law
2
The supreme law of the land
The Philippine Constitution
3
It means the 1987 constitution of the republic of the Philippines adopted by the constitutional convention of 1986 and October 15, 1986, and ratified by the people of the republic of the Philippines in February to 1987
The Philippine Constitution
4
Is responsible for making enabling laws to make sure the spirit of the constitution is a pelt in the country and at times I meant or change the constitution itself
Congress
5
Convey principles and sentiments for the Senate or the house of representatives
Resolutions
6
Require approval of both chambers of Congress in the signature of the president
Joint Resolutions
7
Used for matters affecting the operation of both chambers of Congress must be a roof in the same form by both houses
Concurrent Resolutions
8
Deal with matters entirely within the prerogative of one chamber of congress
Simple Resolutions
9
Laws in the making
Bills
10
This were in innovation made by president, Ferdinand Marcos, with the proclamation of martial law
Presidential Decrees
11
Including acts of Congress municipal charters municipal legislations, court rules administrative rules in orders legislative Bruce and presidential issuances
Batas Pambansa
12
A piece of legislation used to create policy in order to carry out the principles of the constitution
Republic Act
13
The creation of the professional regulation commission
P.D. 223
14
Validity period of PRC license
3 years
15
Continuing professional development act of 2016
R.A 10912
16
chairman of the regulatory board of civil engineering
Praxedes P. Bernardo
17
Member of RBCE
Romeo A. Estañero
18
Member of RBCE(2)
Pericles P. Dakay
19
How many years are you held liable for all the plans that you sign?
15 years
20
an act to ordain and Institute the civil code of the Philippines
R.A. 386
21
An act to regulate the practice of civil engineering in the Philippines
R.A. 544
22
An act repeal and replace section 24 of republic act number 544, entitled an app to regulate the practice of civil engineering in the Philippines
R.A. 1582
23
Architecture act of 2004
R.A. 9266
24
an act, creating the Philippine licensing board for contractors, prescribing its powers duties and functions providing funds, therefore and for other purposes
R.A. 4566
25
ASEP
Association of structural engineers of the Philippines
26
Accessibility law
BP 344
27
Regulating the sale of subdivision lots
PD 957
28
an act authorizing the Ministry of human settlements, do Stabley Sh t and promulgate different levels of standards and technical requirements for economic and socialize thousand projects in urban and rule areas from those provided under presidential decrees number 957 1216, 1096 and 1185
BP 220
29
Sustainability and climate action
The Green Building Code
30
DPWH secretary
Manuel M. Bonoan
31
act to Define condominium
RA 4726
32
Regulate the trade of master plumber, or plumbing law
RA 1378
33
code on sanitation
PD 856
34
Fire code of the Philippines, 2008
RA 9514
35
the horizontal distance measured 90° from the outermost phase of the building to the property lines
Setback
36
Modernizing the PRC
RA 8981
37
The national building code of the Philippines
PD 1096
38
An act prescribing the intellectual property code, and establishing the intellectual property office
RA 8293
39
Total set box only at grade level
8 meters
40
The second in upper floors in mezzanine level, shall there after comply with the minimum ____ meters set back, unless otherwise provided under the
3 meters
41
Ceiling, heights
1st-2.70 m 2nd-2.40 m
42
Common building code violations
No building permit , no setbacks, or means of egress
43
Unobstructed bus to leave building structures and spaces
Means Of Egress
44
Involves examining in managing causal factors
Disaster Management
45
Is allocation from which aircraft flight operations take place regardless of whether they involve air cargo passengers, or neither, and regardless of whether it is public or frat private use
Aerodeome
46
Is defined as the horizontal distance between the outer, most building or structure line of a lower floor and death of a higher floor, wherein the outermost building line of a higher floor is farther from the property line
Incremental Setback
47
A document issued by the building official to an owner or applicant to proceed with the construction installation edition, alteration, renovation, conversion, repair, moving demolition on other work activity of a specific project, building, structure or portions. They're off after the accompanying principal plans, specifications, and other part in a document with the Julie notarized applications are found , satisfactory and substantially, confirming with the NBCP and implementing rules and regulations
Building Permit
48
It is an architectural discipline in which it involves the process of analyzing. How do you space instructors will be used this is the application of codes and regulations sit by national standards such as those minimum requirements by NBCP.
Space Planning
49
Describe the products, materials and work required by a construction contract
Specifications
50
Structure built through specification
Noah's Ark
51
Are a part of the construction contract the detail the work materials installation required to complete the project
Construction Specifications
52
This provide step-by-step, details and instructions on how the types of materials to be used in the desired installation methods
Prescriptive Specs
53
This provisions with a reference, national or state building codes and standards that must be compliant with
General
54
List the type of production material required, based on the performance and structural requirements
Required Products
55
Details the methods of installations, and how to measure quality are effectiveness
Execution Procedures
56
This will provide all the operations to requirements to complete a project
Performance Specs
57
Distr types of the specifications are there any rest of the breed. They are used when a specific type of product or material is required for installation.
Proprietary Specs
58
It may result to/in client setting an unpleasant shock when tenders are open in drastically, modifying or abandoning the work at an early stage
Under Estimate
59
May lose the job or the client
Over Estimate
60
Divided into as many operations are items required
Unit Quantity Method
61
Taken out in the proper unit of measurement
Total Quantity Method
62
Defined as a document used in tendering in the construction industry, in which materials, parts, and labor or itemize
Bill Of Quantities
63
Is defined as a list of the raw materials, subassemblies intermediate assembly subcomponents parts in the quantities of each needed to manufacture an end product
Bill Of Materials
64
In this step, the project owner or general contractor sense out the invitation for bid request for proposal, or request a tender
Bid Solicitation
65
Is a call by clients to contractors to provide specific products or services that meat product specifications
Invitation To Bid
66
refers to the acquisition of goods consulting services in the contracting for infrastructure projects by the procuring entity
Procurement
67
Refers to any brunch department, office, agency or instrumentality of the government, including a State universities and colleges government owned and controlled corporation. etc.
Procuring Entity
68
Refers to documents issued by the procuring entity as the basis for bids furnishing all information is necessary for a prospective bidder to prepare a bid for the goods, infrastructure projects and consulting services to be provided
Bidding Documents
69
Refers to a signed offer our proposal submitted by a supplier, manufacturer, distributor, contractor or consultant in response to the meeting
Bid
70
refers to a method of broker meant which is open to participation by any interested party, in which consist of the following processes : etc.
Competetive Bidding
71
Defined in the civil code is a meeting of the minds with respect to the other, to give something or to render some service
Contract
72
A contract provision, setting for the damages a party must be in the event of his bitch
Penalty Provision
73
A rule that certain kinds of contracts are enforceable, unless signed, and in the writing, or unless there is a written memorandum of their terms, signed by the party to be charge
Statute Of Frauds
74
Is written agreement in which one party guarantees that the second party will fulfill its obligations to a third-party
Construction Bond
75
This guarantee that suppliers can meet financial obligations when contacted performance targets are missed
Surety Bond
76
Is issued all prospective readers to clarify, modify, end, or amend items in the building documents as discussed and agreed during the pre-bid conference
Bid Bulletin
77
maybe use generally in the complex acquisition, as a means of briefing respective beaters and explaining complicated specifications
Pre-Bid Conference
78
It's a list of instructions, stipulating the manner in which bids are to be prepared
Instruction To Bidders
79
Means information, advice or notification pertinent to the project, delivered in person or sent by registered mail to the individual
Written Notice
80
Read the information, adding to clarifying, or modifying the bidding documents
Addendum
81
is the party who request the certainty to issue the bond and whose obligations are guaranteed?
Principal
82
Is the party who requires the principal to obtain the bond, and who receives the benefit of the guarantee
Obligee
83
Is the party who issues the bond that guarantees the obligations of the principal?
Surety
84
If a bidding contractor is awarded a contract in response to attend her, and then refuses to enter into the contract in accordance with the terms of the tender the shirt, you will pay the owner and the price difference between dentist on her bed in the next lowest bid up to the penalty limit of the band
Bid Bonds
85
Guarantee that the contractor that has entered into a construction contract, will perform all of its obligations under the contract
Performance Bonds
86
Provide for payment of the band the principal's subcontractors and material suppliers should be the principal not make payments as required
Labour And Material Payment Bonds
87
Guarantee that payment will be made to the lien claimants for whom the bond is posted if the proof there builders lien claims subject to the provision of existing act of the land
Construction Lien Bonds
88
Marks the date, when a contractor or subcontractor works is to begin on the construction project
Notice To Proceed
89
Supervises the CM. It has greater responsibility to the project as he or she overseas more than the construction process.
Project Manager
90
His primary responsibility is the exercise of overall cost control, which relieves the owner of many of the anxieties that usually beset, particularly thise concerned with forecasting cost and completion dates
Construction Manager