問題一覧
1
Block Fiddle
2
provides an effective catenary and absorbs shock dute to its weight
3
Slew travel limits
4
nonferrous
5
Extend arm with thumb pointing downward and flex fingersin and out
6
The crane operator and signalman muste be familiar with hand signals
7
28°F (-2À°C) and 40À°F(4À°C)
8
The filters and strainers be check frequently
9
They may be kept open if they can be automatically closed from the bridge
10
Cross out the error with single line and rewrite the entry correctly.
11
Bow lines
12
The cranes are powered by independent internal combustion power units.
13
Cargo holds
14
Tightness of flared tube end
15
Stack weights should be less when a solid bar lashing as compared to a wire lashing
16
There is danger of heavy cargo sweat if outside air in introduced by ventilation
17
Radioactive I and corrosive
18
The engine room
19
Inherent characteristics
20
Boot topping
21
Changing the air filter
22
The crane operators and signal ma nmust be familiar with the correct hand signals
23
pallet
24
Refrigerated fruit that is ripening
25
Bitumastic
26
Companionway
27
Bleed of all stored energy from the accumulators
28
Maintain the proper water level at all times
29
approximately halfway up the bulkhead
30
Safety
31
prevent the user from closing the tool with too much force
32
Correct the cause of the scoring and install a new shaft sleeve
33
Topping lift
34
Bolster plate
35
closed, opened a falf turn, and then closed again
36
Asbestos
37
Prior to getting underway
38
Galvanizing
39
bonding cable before the fuel hose has been connected
40
fid
41
Equalizing beam
42
Overloading
43
Kinetic energy
44
loading rate should be decreased
45
for that sailor to feed the hauling part a bosun/s chair hitch
46
Awning
47
Jews/'harp
48
Luff, slew, and hoist operations
49
Use one hand to give any motion signal, and place the other hand motionless in front of the hand giving the motion signal
50
Temperature difference hot and cold regions
51
steam cylinder drain valve
52
Contamination of a food cargo by an odorous cargo
53
Billboard
54
red and white label
55
With arm extended and finger closed, point thumb downward.
56
Bevel open
57
A fusible link
58
lifting capacity of the of the winch
59
Secure boiler fires
60
Boom table
61
bevel closed
62
reduce efficiency of refrigerating plant
63
allow the sediments and water to settle
64
Coal should be surface ventilated only.
65
it is of high value or easy pilferable
66
Using the proper slings or other lifting devices during cargo operations
67
stranding
68
after the shore pumps are stopped
69
the gland is properly adjusted to permit a slight leakage of seawater
70
using temporarily opened cylinder clearance pocket
71
White and black
72
four times the sum of the relief valve setting and the static head
73
carriage clamp screw is loosened
74
MFAG
75
spontaneous combustion
76
butt
MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 1
Weekly Test 1
ユーザ名非公開 · 50問 · 13日前Weekly Test 1
Weekly Test 1
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前WT 2
WT 2
ユーザ名非公開 · 48問 · 13日前WT 2
WT 2
48問 • 13日前WT 1
WT 1
ユーザ名非公開 · 50問 · 13日前WT 1
WT 1
50問 • 13日前Standpipe Requirements
Standpipe Requirements
ユーザ名非公開 · 29問 · 13日前Standpipe Requirements
Standpipe Requirements
29問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
ユーザ名非公開 · 78問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 1)
Item 311 Portland Cement Concrete Pavement (PART 1)
78問 • 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
ユーザ名非公開 · 61問 · 13日前Item 311 Portland Cement Concrete Pavement (PART 2)
Item 311 Portland Cement Concrete Pavement (PART 2)
61問 • 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
ユーザ名非公開 · 36問 · 13日前Item 406 Prestressed Concrete Structures
Item 406 Prestressed Concrete Structures
36問 • 13日前Principles and Code of Ethics
Principles and Code of Ethics
ユーザ名非公開 · 29問 · 13日前Principles and Code of Ethics
Principles and Code of Ethics
29問 • 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
ユーザ名非公開 · 79問 · 13日前RNPCP Appendix A and B
RNPCP Appendix A and B
79問 • 13日前RNPCP Chapter 10 to 13
RNPCP Chapter 10 to 13
ユーザ名非公開 · 93問 · 13日前RNPCP Chapter 10 to 13
RNPCP Chapter 10 to 13
93問 • 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
ユーザ名非公開 · 94問 · 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94問 • 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
ユーザ名非公開 · 20問 · 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20問 • 13日前Item 206 Chemically Stabilized Road Mix Subbase/Base Course
Item 206 Chemically Stabilized Road Mix Subbase/Base Course
ユーザ名非公開 · 11問 · 13日前Item 206 Chemically Stabilized Road Mix Subbase/Base Course
Item 206 Chemically Stabilized Road Mix Subbase/Base Course
11問 • 13日前Item 205 Asphalt Stabilized Road Mix Base Course
Item 205 Asphalt Stabilized Road Mix Base Course
ユーザ名非公開 · 7問 · 13日前Item 205 Asphalt Stabilized Road Mix Base Course
Item 205 Asphalt Stabilized Road Mix Base Course
7問 • 13日前Item 204 Portland Cement Stabilized Road Mix Base Course
Item 204 Portland Cement Stabilized Road Mix Base Course
ユーザ名非公開 · 7問 · 13日前Item 204 Portland Cement Stabilized Road Mix Base Course
Item 204 Portland Cement Stabilized Road Mix Base Course
7問 • 13日前Item 203 Lime Stabilized Road Mix Base Course
Item 203 Lime Stabilized Road Mix Base Course
ユーザ名非公開 · 27問 · 13日前Item 203 Lime Stabilized Road Mix Base Course
Item 203 Lime Stabilized Road Mix Base Course
27問 • 13日前問題一覧
1
Block Fiddle
2
provides an effective catenary and absorbs shock dute to its weight
3
Slew travel limits
4
nonferrous
5
Extend arm with thumb pointing downward and flex fingersin and out
6
The crane operator and signalman muste be familiar with hand signals
7
28°F (-2À°C) and 40À°F(4À°C)
8
The filters and strainers be check frequently
9
They may be kept open if they can be automatically closed from the bridge
10
Cross out the error with single line and rewrite the entry correctly.
11
Bow lines
12
The cranes are powered by independent internal combustion power units.
13
Cargo holds
14
Tightness of flared tube end
15
Stack weights should be less when a solid bar lashing as compared to a wire lashing
16
There is danger of heavy cargo sweat if outside air in introduced by ventilation
17
Radioactive I and corrosive
18
The engine room
19
Inherent characteristics
20
Boot topping
21
Changing the air filter
22
The crane operators and signal ma nmust be familiar with the correct hand signals
23
pallet
24
Refrigerated fruit that is ripening
25
Bitumastic
26
Companionway
27
Bleed of all stored energy from the accumulators
28
Maintain the proper water level at all times
29
approximately halfway up the bulkhead
30
Safety
31
prevent the user from closing the tool with too much force
32
Correct the cause of the scoring and install a new shaft sleeve
33
Topping lift
34
Bolster plate
35
closed, opened a falf turn, and then closed again
36
Asbestos
37
Prior to getting underway
38
Galvanizing
39
bonding cable before the fuel hose has been connected
40
fid
41
Equalizing beam
42
Overloading
43
Kinetic energy
44
loading rate should be decreased
45
for that sailor to feed the hauling part a bosun/s chair hitch
46
Awning
47
Jews/'harp
48
Luff, slew, and hoist operations
49
Use one hand to give any motion signal, and place the other hand motionless in front of the hand giving the motion signal
50
Temperature difference hot and cold regions
51
steam cylinder drain valve
52
Contamination of a food cargo by an odorous cargo
53
Billboard
54
red and white label
55
With arm extended and finger closed, point thumb downward.
56
Bevel open
57
A fusible link
58
lifting capacity of the of the winch
59
Secure boiler fires
60
Boom table
61
bevel closed
62
reduce efficiency of refrigerating plant
63
allow the sediments and water to settle
64
Coal should be surface ventilated only.
65
it is of high value or easy pilferable
66
Using the proper slings or other lifting devices during cargo operations
67
stranding
68
after the shore pumps are stopped
69
the gland is properly adjusted to permit a slight leakage of seawater
70
using temporarily opened cylinder clearance pocket
71
White and black
72
four times the sum of the relief valve setting and the static head
73
carriage clamp screw is loosened
74
MFAG
75
spontaneous combustion
76
butt