問題一覧
1
Three starts within 30 minutes
2
Shipos crew
3
Cryogenic
4
if it creates a hazard to navigation
5
once a month
6
protect personnel from electric shock
7
throwing the entire container overboard
8
Master and Chief Engineer
9
Piping under 3 inches nominal pipe size need not to be hydrostatically tested
10
Chief Engineer
11
shut to solid stream
12
evacuate patient to a hospital
13
They shall be kept clear of and suitably insulated from any woodwork or other combustible matter
14
applying chemical agents
15
pushing the plunger on the center of the hydrostatic release
16
Certificate of Documentation
17
Served by two electric power feeder circuits
18
pain at the site of teh fracture and possible numbness or paralysis below the injury
19
Above the uppermost continuous deck
20
From 35 degrees on one side to 30 degrees to the other side in no more than 28 seconds
21
Its smothering effect is excellent for class B fires.
22
removing the fuel
23
The location and capacity of all fuel and cargo tanks on the vessel
24
Combustible gas indicator
25
4
26
CO2 is very toxic
27
Low toxicity
28
A rupture disk may be fitted in series with the relief valve
29
throwing the entire container overboard, then pulling on the operating cord to inflate the raft
30
Stop fueling
31
Environmental Risk Management
32
Two
33
0.27 MPA
34
Signal the shore control point to shutdown
35
stop lowering boats
36
assessment
37
drill a hole at each end of the crack
38
Master
39
10 knots
40
A small leak of water into the suit will destroy the protective qualities against hypothermia
41
High toxicity
42
Measurement
43
Engine room control console
44
keeping a icebag over the location of the appendix
45
it must be more than 12 miles from the nearest coast
46
Spanners
47
Stop loading
48
Valve bodies, discs, spindles, and seats must all be made of bronze or a corrosion resistant material
49
Served by two electric power feeder circuits
50
Foam
51
Dry store room
52
New personnel
53
tested monthly
54
Controls the quantity of foam concentrate to be injected into the fire line
55
Three
56
SASS
57
Galley exhaust emission
58
Two, at least one of which shall be independent of watertight doors.
59
port authorites
60
avoiding possible injury to the spinal cord by incorrect handling
61
The entire steering gear be tested within 12 hours prior to departure
62
Minimum acces in the ship is to be maintained at all times
63
10-14 months
64
Elevate head
65
The hydrostatic test shall be applied from the boiler drum to the throttle valve
66
Management by objectives
67
The floating fog forms walls of water
68
25
69
identify the decision objectives
70
The same or higher
71
smothering
72
Certificate of Inspection
73
18 hrs and 36 hrs respectively
74
To some fixed object on the ship
75
Steering gear
76
Planning
77
Make sure the operating cord is secured to the vessel before throwing it over the side
78
fire & gs pump
79
combustible gas indicator
80
The suit should be worn only when abandoning ship
81
directed to move to a cool space unassisted
82
Discharge to shore facility only
83
water
84
Enabling Objectives
85
Increase the search frequency and detail of the persons due to board or disembark
86
Run emergency generator, driven by an internal combustion engine, under load for at least 2 hours.
87
60 months
88
One month
89
reproductive hazard
90
stop loading
91
Steering gear motor
92
Within 45 seconds
93
To provide an attachment for the hose from shore for firefighting
94
CSO
95
10 knots
96
National authorities where the ship is sailing
97
Replace the hose
98
voyage is completed
99
minimum of 10 M and maximum of 15 M
100
25
MPLE
MPLE
ユーザ名非公開 · 41問 · 13日前MPLE
MPLE
41問 • 13日前Weekly Test 3
Weekly Test 3
ユーザ名非公開 · 50問 · 13日前Weekly Test 3
Weekly Test 3
50問 • 13日前Weekly Test 2
Weekly Test 2
ユーザ名非公開 · 50問 · 13日前Weekly Test 2
Weekly Test 2
50問 • 13日前Weekly Test 1
Weekly Test 1
ユーザ名非公開 · 50問 · 13日前Weekly Test 1
Weekly Test 1
50問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 9問 · 13日前Refresher SPDI 1
Refresher SPDI 1
9問 • 13日前Refresher SPDI 1
Refresher SPDI 1
ユーザ名非公開 · 100問 · 13日前Refresher SPDI 1
Refresher SPDI 1
100問 • 13日前Definition of Terms 3
Definition of Terms 3
ユーザ名非公開 · 90問 · 13日前Definition of Terms 3
Definition of Terms 3
90問 • 13日前Definition of Terms 2
Definition of Terms 2
ユーザ名非公開 · 90問 · 13日前Definition of Terms 2
Definition of Terms 2
90問 • 13日前Definition of Terms 1
Definition of Terms 1
ユーザ名非公開 · 90問 · 13日前Definition of Terms 1
Definition of Terms 1
90問 • 13日前WT 6
WT 6
ユーザ名非公開 · 50問 · 13日前WT 6
WT 6
50問 • 13日前WT 3
WT 3
ユーザ名非公開 · 50問 · 13日前WT 3
WT 3
50問 • 13日前WT 2
WT 2
ユーザ名非公開 · 48問 · 13日前WT 2
WT 2
48問 • 13日前SPI version D pt 2
SPI version D pt 2
ユーザ名非公開 · 61問 · 13日前SPI version D pt 2
SPI version D pt 2
61問 • 13日前Standpipe Requirements
Standpipe Requirements
ユーザ名非公開 · 29問 · 13日前Standpipe Requirements
Standpipe Requirements
29問 • 13日前Principles and Code of Ethics
Principles and Code of Ethics
ユーザ名非公開 · 29問 · 13日前Principles and Code of Ethics
Principles and Code of Ethics
29問 • 13日前RNPCP Chapter 10 to 13
RNPCP Chapter 10 to 13
ユーザ名非公開 · 93問 · 13日前RNPCP Chapter 10 to 13
RNPCP Chapter 10 to 13
93問 • 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
ユーザ名非公開 · 94問 · 13日前RNPCP Chapter 6 to 9
RNPCP Chapter 6 to 9
94問 • 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
ユーザ名非公開 · 20問 · 13日前Item 303 Bituminous Seal Coat
Item 303 Bituminous Seal Coat
20問 • 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
ユーザ名非公開 · 10問 · 13日前Item 301 Bituminous Prime Coat
Item 301 Bituminous Prime Coat
10問 • 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
ユーザ名非公開 · 11問 · 13日前Item 300 Aggregate Surface Course
Item 300 Aggregate Surface Course
11問 • 13日前問題一覧
1
Three starts within 30 minutes
2
Shipos crew
3
Cryogenic
4
if it creates a hazard to navigation
5
once a month
6
protect personnel from electric shock
7
throwing the entire container overboard
8
Master and Chief Engineer
9
Piping under 3 inches nominal pipe size need not to be hydrostatically tested
10
Chief Engineer
11
shut to solid stream
12
evacuate patient to a hospital
13
They shall be kept clear of and suitably insulated from any woodwork or other combustible matter
14
applying chemical agents
15
pushing the plunger on the center of the hydrostatic release
16
Certificate of Documentation
17
Served by two electric power feeder circuits
18
pain at the site of teh fracture and possible numbness or paralysis below the injury
19
Above the uppermost continuous deck
20
From 35 degrees on one side to 30 degrees to the other side in no more than 28 seconds
21
Its smothering effect is excellent for class B fires.
22
removing the fuel
23
The location and capacity of all fuel and cargo tanks on the vessel
24
Combustible gas indicator
25
4
26
CO2 is very toxic
27
Low toxicity
28
A rupture disk may be fitted in series with the relief valve
29
throwing the entire container overboard, then pulling on the operating cord to inflate the raft
30
Stop fueling
31
Environmental Risk Management
32
Two
33
0.27 MPA
34
Signal the shore control point to shutdown
35
stop lowering boats
36
assessment
37
drill a hole at each end of the crack
38
Master
39
10 knots
40
A small leak of water into the suit will destroy the protective qualities against hypothermia
41
High toxicity
42
Measurement
43
Engine room control console
44
keeping a icebag over the location of the appendix
45
it must be more than 12 miles from the nearest coast
46
Spanners
47
Stop loading
48
Valve bodies, discs, spindles, and seats must all be made of bronze or a corrosion resistant material
49
Served by two electric power feeder circuits
50
Foam
51
Dry store room
52
New personnel
53
tested monthly
54
Controls the quantity of foam concentrate to be injected into the fire line
55
Three
56
SASS
57
Galley exhaust emission
58
Two, at least one of which shall be independent of watertight doors.
59
port authorites
60
avoiding possible injury to the spinal cord by incorrect handling
61
The entire steering gear be tested within 12 hours prior to departure
62
Minimum acces in the ship is to be maintained at all times
63
10-14 months
64
Elevate head
65
The hydrostatic test shall be applied from the boiler drum to the throttle valve
66
Management by objectives
67
The floating fog forms walls of water
68
25
69
identify the decision objectives
70
The same or higher
71
smothering
72
Certificate of Inspection
73
18 hrs and 36 hrs respectively
74
To some fixed object on the ship
75
Steering gear
76
Planning
77
Make sure the operating cord is secured to the vessel before throwing it over the side
78
fire & gs pump
79
combustible gas indicator
80
The suit should be worn only when abandoning ship
81
directed to move to a cool space unassisted
82
Discharge to shore facility only
83
water
84
Enabling Objectives
85
Increase the search frequency and detail of the persons due to board or disembark
86
Run emergency generator, driven by an internal combustion engine, under load for at least 2 hours.
87
60 months
88
One month
89
reproductive hazard
90
stop loading
91
Steering gear motor
92
Within 45 seconds
93
To provide an attachment for the hose from shore for firefighting
94
CSO
95
10 knots
96
National authorities where the ship is sailing
97
Replace the hose
98
voyage is completed
99
minimum of 10 M and maximum of 15 M
100
25