ログイン

drftng 2.1
44問 • 2年前
  • Keun
  • 通報

    問題一覧

  • 1

    a plumbing system performs two major functions which are

    For water distribution, Sewage disposal

  • 2

    refers to a network of pipes, pumps, valves, storage tanks, and othe infrastructure designed to transport and deliver water from a centralized source, such as a water treatment plant or well, to consumers

    Water distribution

  • 3

    the process of removing and destroying or converting the noxious substances of sewage especially by ammonification and nitrification through bacterial action

    Sewage disposal

  • 4

    The disposal of waste matter such as feces or dirty water from homes and factories. It is carried away in sewers or drains for dumping or conversion into a form that is not toxic.

    Sewage disposal

  • 5

    The water distribution system is shown in an elevation, on plan and on isometry using the different symbols, hence this is called as

    Schematic drawing

  • 6

    WC

    Water closet

  • 7

    VAC

    Vent and ceiling

  • 8

    VSTR

    Vent stack thru roof

  • 9

    CWL

    Cold water line

  • 10

    HWL

    Hot water line

  • 11

    CDP

    Concrete drain pipe

  • 12

    CISP

    Cast iron soil pipe

  • 13

    DS

    Down spout

  • 14

    CIVS

    Cast iron vent stack

  • 15

    CB

    Catch basin

  • 16

    JB

    Junction box

  • 17

    WM

    Water meter

  • 18

    GIPWL

    Galvanize iron pipe water line

  • 19

    CWR

    Cold water riser

  • 20

    CWDF

    Cold water down feed

  • 21

    FL

    Fire line

  • 22

    DD

    Deck drain

  • 23

    CD

    Canopy drain

  • 24

    SPR

    Sprinkle riser

  • 25

    DSPR

    Dry stand pipe riser

  • 26

    FHC

    Fire hose cabinet

  • 27

    LAV

    Lavatory

  • 28

    FD

    Floor drain

  • 29

    CO

    Clean out

  • 30

    drawn on a small scale

    Plumbing drawing

  • 31

    ?

    Double brach elbow

  • 32

    ?

    Straight cross

  • 33

    ?

    Safety valve

  • 34

    ?

    Gate valve

  • 35

    ?

    Hand valve

  • 36

    ?

    Pipe outline up

  • 37

    ?

    Pipe outline down

  • 38

    ?

    Coupling

  • 39

    ?

    Elbow 90

  • 40

    ?

    Elbow 45

  • 41

    ?

    Tee 90

  • 42

    ?

    Lateral 90

  • 43

    ?

    Clean out

  • 44

    ?

    Reducer

  • PE lipens istepeng

    PE lipens istepeng

    Keun · 16問 · 2年前

    PE lipens istepeng

    PE lipens istepeng

    16問 • 2年前
    Keun

    PE lipens not rel

    PE lipens not rel

    Keun · 30問 · 2年前

    PE lipens not rel

    PE lipens not rel

    30問 • 2年前
    Keun

    PE lepins rel

    PE lepins rel

    Keun · 32問 · 2年前

    PE lepins rel

    PE lepins rel

    32問 • 2年前
    Keun

    science 3rd

    science 3rd

    Keun · 19問 · 2年前

    science 3rd

    science 3rd

    19問 • 2年前
    Keun

    Entrep (3rd)

    Entrep (3rd)

    Keun · 49問 · 2年前

    Entrep (3rd)

    Entrep (3rd)

    49問 • 2年前
    Keun

    Science (3rd)

    Science (3rd)

    Keun · 34問 · 2年前

    Science (3rd)

    Science (3rd)

    34問 • 2年前
    Keun

    Throw it back

    Throw it back

    Keun · 8問 · 2年前

    Throw it back

    Throw it back

    8問 • 2年前
    Keun

    Muse sick

    Muse sick

    Keun · 57問 · 2年前

    Muse sick

    Muse sick

    57問 • 2年前
    Keun

    Muse sick 2

    Muse sick 2

    Keun · 24問 · 2年前

    Muse sick 2

    Muse sick 2

    24問 • 2年前
    Keun

    icf sksk

    icf sksk

    Keun · 10問 · 2年前

    icf sksk

    icf sksk

    10問 • 2年前
    Keun

    araling panliputangina

    araling panliputangina

    Keun · 20問 · 2年前

    araling panliputangina

    araling panliputangina

    20問 • 2年前
    Keun

    entrepurrrnaurship

    entrepurrrnaurship

    Keun · 24問 · 2年前

    entrepurrrnaurship

    entrepurrrnaurship

    24問 • 2年前
    Keun

    draftorture

    draftorture

    Keun · 8問 · 2年前

    draftorture

    draftorture

    8問 • 2年前
    Keun

    Scieyang

    Scieyang

    Keun · 13問 · 2年前

    Scieyang

    Scieyang

    13問 • 2年前
    Keun

    entrippings

    entrippings

    Keun · 18問 · 2年前

    entrippings

    entrippings

    18問 • 2年前
    Keun

    filip

    filip

    Keun · 37問 · 2年前

    filip

    filip

    37問 • 2年前
    Keun

    musika

    musika

    Keun · 28問 · 2年前

    musika

    musika

    28問 • 2年前
    Keun

    drafterist

    drafterist

    Keun · 46問 · 2年前

    drafterist

    drafterist

    46問 • 2年前
    Keun

    問題一覧

  • 1

    a plumbing system performs two major functions which are

    For water distribution, Sewage disposal

  • 2

    refers to a network of pipes, pumps, valves, storage tanks, and othe infrastructure designed to transport and deliver water from a centralized source, such as a water treatment plant or well, to consumers

    Water distribution

  • 3

    the process of removing and destroying or converting the noxious substances of sewage especially by ammonification and nitrification through bacterial action

    Sewage disposal

  • 4

    The disposal of waste matter such as feces or dirty water from homes and factories. It is carried away in sewers or drains for dumping or conversion into a form that is not toxic.

    Sewage disposal

  • 5

    The water distribution system is shown in an elevation, on plan and on isometry using the different symbols, hence this is called as

    Schematic drawing

  • 6

    WC

    Water closet

  • 7

    VAC

    Vent and ceiling

  • 8

    VSTR

    Vent stack thru roof

  • 9

    CWL

    Cold water line

  • 10

    HWL

    Hot water line

  • 11

    CDP

    Concrete drain pipe

  • 12

    CISP

    Cast iron soil pipe

  • 13

    DS

    Down spout

  • 14

    CIVS

    Cast iron vent stack

  • 15

    CB

    Catch basin

  • 16

    JB

    Junction box

  • 17

    WM

    Water meter

  • 18

    GIPWL

    Galvanize iron pipe water line

  • 19

    CWR

    Cold water riser

  • 20

    CWDF

    Cold water down feed

  • 21

    FL

    Fire line

  • 22

    DD

    Deck drain

  • 23

    CD

    Canopy drain

  • 24

    SPR

    Sprinkle riser

  • 25

    DSPR

    Dry stand pipe riser

  • 26

    FHC

    Fire hose cabinet

  • 27

    LAV

    Lavatory

  • 28

    FD

    Floor drain

  • 29

    CO

    Clean out

  • 30

    drawn on a small scale

    Plumbing drawing

  • 31

    ?

    Double brach elbow

  • 32

    ?

    Straight cross

  • 33

    ?

    Safety valve

  • 34

    ?

    Gate valve

  • 35

    ?

    Hand valve

  • 36

    ?

    Pipe outline up

  • 37

    ?

    Pipe outline down

  • 38

    ?

    Coupling

  • 39

    ?

    Elbow 90

  • 40

    ?

    Elbow 45

  • 41

    ?

    Tee 90

  • 42

    ?

    Lateral 90

  • 43

    ?

    Clean out

  • 44

    ?

    Reducer