  • 1

    What flooding level is reportable in regards to cre. What other weather reportable

    above sleeper

  • 2

    Minimum distance from cre gear

    1.5 m 5ft

  • 3

    Removing tcoc nearest or furthest from conductor rail first

    nearest

  • 4

    Applying tcoc, nearest or furthest from conductor rail first

    furthest

  • 5

    Use short circuit bar when 4 scenarios

    person in contact with cre, passengers alighting from train stopped by failure,accident, short circuit on train cannot be isolated, shown in tocs instructions to crew

  • routes

    routes

    john collins · 58問 · 1年前

    routes

    routes

    58問 • 1年前
    john collins

    rules ac

    rules ac

    john collins · 11問 · 1年前

    rules ac

    rules ac

    11問 • 1年前
    john collins

    rules g1 pts

    rules g1 pts

    john collins · 9問 · 1年前

    rules g1 pts

    rules g1 pts

    9問 • 1年前
    john collins

    rules m3 managing incidents, floods,snow

    rules m3 managing incidents, floods,snow

    john collins · 9問 · 1年前

    rules m3 managing incidents, floods,snow

    rules m3 managing incidents, floods,snow

    9問 • 1年前
    john collins

    rules p1 single line working

    rules p1 single line working

    john collins · 19問 · 1年前

    rules p1 single line working

    rules p1 single line working

    19問 • 1年前
    john collins

    rules sp speeds

    rules sp speeds

    john collins · 5問 · 1年前

    rules sp speeds

    rules sp speeds

    5問 • 1年前
    john collins

    rules m1 dealing with accident evacuation

    rules m1 dealing with accident evacuation

    john collins · 17問 · 1年前

    rules m1 dealing with accident evacuation

    rules m1 dealing with accident evacuation

    17問 • 1年前
    john collins

    rules m2 train stopped by failure

    rules m2 train stopped by failure

    john collins · 10問 · 1年前

    rules m2 train stopped by failure

    rules m2 train stopped by failure

    10問 • 1年前
    john collins

    rules ss2 shunting

    rules ss2 shunting

    john collins · 6問 · 1年前

    rules ss2 shunting

    rules ss2 shunting

    6問 • 1年前
    john collins

    rules tw5 defective

    rules tw5 defective

    john collins · 10問 · 1年前

    rules tw5 defective

    rules tw5 defective

    10問 • 1年前
    john collins

    rules tw1 prep and movement

    rules tw1 prep and movement

    john collins · 19問 · 1年前

    rules tw1 prep and movement

    rules tw1 prep and movement

    19問 • 1年前
    john collins

    RLU AND FLU TEST

    RLU AND FLU TEST

    john collins · 5問 · 1年前

    RLU AND FLU TEST

    RLU AND FLU TEST

    5問 • 1年前
    john collins

    SHUNTING

    SHUNTING

    john collins · 18問 · 1年前

    SHUNTING

    SHUNTING

    18問 • 1年前
    john collins

    POSSESSION RUNNING LINE ENGINEERING T3

    POSSESSION RUNNING LINE ENGINEERING T3

    john collins · 14問 · 1年前

    POSSESSION RUNNING LINE ENGINEERING T3

    POSSESSION RUNNING LINE ENGINEERING T3

    14問 • 1年前
    john collins

    問題一覧

  • 1

    What flooding level is reportable in regards to cre. What other weather reportable

    above sleeper

  • 2

    Minimum distance from cre gear

    1.5 m 5ft

  • 3

    Removing tcoc nearest or furthest from conductor rail first

    nearest

  • 4

    Applying tcoc, nearest or furthest from conductor rail first

    furthest

  • 5

    Use short circuit bar when 4 scenarios

    person in contact with cre, passengers alighting from train stopped by failure,accident, short circuit on train cannot be isolated, shown in tocs instructions to crew