Entrance
問題一覧
1
1 Tangential (Hoop) Stress 2 Axial Stress 3 Radial Stress
2
true
3
Reduce supercharging, Reduce noise in measurement
4
True
5
False
6
Pressure exerted by the weight of the static column of fluid
7
Repeatabilty of Investigation and Final Build Up, 60sec slope stability of <0.1
8
the porosity decreases, the pore pressure increases, the density increases
9
To ensure the drawdown goes below formation pressure
10
Incorrect tracking of depth by the MWD engineer
11
1 Equalization Valve 2 Pretest Chamber 3 Strain Gauge 4 ACQG 5 Probe
12
.. a condition in which the drill string joints are stuck together due to increased torque during makeup., ... a condition in which the bit gets stuck in soft formations., ... the process of sticking the pin into the box during a connection.
13
Become narrower
14
Over Pressured
15
False
16
1 .. are a consequence of breakouts. 2 ... have two nearly-parallel faces with plume structures. 3 .. are the result of natural fractures or weak planes.
17
Pressure of the fluid contained in the pore spaces of sediments or other rocks
18
... a condition in which the drill stem becomes stuck against the wall of the wellbore because part of the drill stem has become embedded in the filter cake formed on the side of the hole.
19
Increase in the ROP with insufficient hole cleaning, Mud engineer actively changing mud weight, Moving up/down the drill string at different speeds
20
MDT
21
Drilling engineers, Geologists, Reservoir engineers, Production engineers
22
StethoScope can help in the casing point optimization
23
True
24
Reservoir fluid identification, Oil to water contact, Mobility, Mud weight optimization
25
Very low
26
Real Time drilling optimization, Geosteering, Reduce drilling risk
27
D test
28
Pump Module
29
TeleScope
30
1
31
A test
32
Pressure did not stabilize during the build up
33
Supercharging is increasing the pressure of the formation immediately around the wellbore due to overbalanced drilling
34
4
35
False
36
Kicks (flow from well), increase in gas level, splintered cavings at the shakers, increase in torque and drag
37
True
38
A single probe designed tool
39
When over-pressure is due to under compaction only
40
True
41
Invaded zone
42
True
43
0.43
44
Fasle
45
It is the borehole pressure required to initiate a fracture in the formation
Mechanics + hydrolics
Mechanics + hydrolics
ユーザ名非公開 · 45問 · 1年前Mechanics + hydrolics
Mechanics + hydrolics
45問 • 1年前2. Tool Preparation
2. Tool Preparation
ユーザ名非公開 · 31問 · 1年前2. Tool Preparation
2. Tool Preparation
31問 • 1年前3. Execution and confirmation
3. Execution and confirmation
ユーザ名非公開 · 74問 · 1年前3. Execution and confirmation
3. Execution and confirmation
74問 • 1年前sonicScope
sonicScope
ユーザ名非公開 · 31問 · 10ヶ月前sonicScope
sonicScope
31問 • 10ヶ月前問題一覧
1
1 Tangential (Hoop) Stress 2 Axial Stress 3 Radial Stress
2
true
3
Reduce supercharging, Reduce noise in measurement
4
True
5
False
6
Pressure exerted by the weight of the static column of fluid
7
Repeatabilty of Investigation and Final Build Up, 60sec slope stability of <0.1
8
the porosity decreases, the pore pressure increases, the density increases
9
To ensure the drawdown goes below formation pressure
10
Incorrect tracking of depth by the MWD engineer
11
1 Equalization Valve 2 Pretest Chamber 3 Strain Gauge 4 ACQG 5 Probe
12
.. a condition in which the drill string joints are stuck together due to increased torque during makeup., ... a condition in which the bit gets stuck in soft formations., ... the process of sticking the pin into the box during a connection.
13
Become narrower
14
Over Pressured
15
False
16
1 .. are a consequence of breakouts. 2 ... have two nearly-parallel faces with plume structures. 3 .. are the result of natural fractures or weak planes.
17
Pressure of the fluid contained in the pore spaces of sediments or other rocks
18
... a condition in which the drill stem becomes stuck against the wall of the wellbore because part of the drill stem has become embedded in the filter cake formed on the side of the hole.
19
Increase in the ROP with insufficient hole cleaning, Mud engineer actively changing mud weight, Moving up/down the drill string at different speeds
20
MDT
21
Drilling engineers, Geologists, Reservoir engineers, Production engineers
22
StethoScope can help in the casing point optimization
23
True
24
Reservoir fluid identification, Oil to water contact, Mobility, Mud weight optimization
25
Very low
26
Real Time drilling optimization, Geosteering, Reduce drilling risk
27
D test
28
Pump Module
29
TeleScope
30
1
31
A test
32
Pressure did not stabilize during the build up
33
Supercharging is increasing the pressure of the formation immediately around the wellbore due to overbalanced drilling
34
4
35
False
36
Kicks (flow from well), increase in gas level, splintered cavings at the shakers, increase in torque and drag
37
True
38
A single probe designed tool
39
When over-pressure is due to under compaction only
40
True
41
Invaded zone
42
True
43
0.43
44
Fasle
45
It is the borehole pressure required to initiate a fracture in the formation