marlaw
問題一覧
1
IV
2
In the Tropical cirteria, there shall be more than one tropical storm in 10 years in an area of 5° square in any one separate calendar month.
3
Northern Winter Seasonal Zones and Area
4
Southern Winter Seasonal Zone
5
WINTER: 16 October to 15 April; SUMMER: 16 April to 15 October
6
Tropical Zone
7
WINTER: 16 April to 15 October; SUMMER: 16 October to 15 April
8
Seasonal Tropical Areas
9
TROPICAL: 1 November to 15 July, SUMMER: 16 July to 31 October
10
Philippine Sea
11
TROPICAL: 1 September to 31 May, SUMMER: 1 June to 31 August
12
TROPICAL: 1 December to 30 Abril: SUMMER: 1 May to 30 November
13
TROPICAL: 1 April to 30 November; SUMMER: 1 December to 31 March
14
Every Contracting Government shall have no responsibility for facilitating the conduct of the audit and implementation of a programme of actions to address the findings, based on the guidelines developed by the Organization.
15
16 - Audit Standard doe not, mean the Code for Implementation.
16
The freeboard deck is normally the uppermost complete deck not exposed to weather and sea, which has permanent means of closing all openings in the weather part thereof, and below which all the openings in the sides of the ship are fitted with permanent means of watertight closing
17
Completion date of the survey on which this certificate is based (dd/mm/yy)
18
Load line
19
to allot a maximum legal limit up to which a ship can be loaded by cargo
20
The risk of having the vessel sailing with inadequate freeboard and buoyancy can be limited.
21
The complete Load line markings consist of 2 vital parts.
22
Deck Line
23
It is the 300mm diameter and 25mm thick round shaped disc
24
it is the 300mm diameter and 25mm thick round shaped disc
25
New ships constructed on or after 1 January 2007
26
The buoyancy and immersion of the vessel does not depend on the type of water and its density.
27
Every ship that has been surveyed and marked in accordance with the present Load line convention are issued by the authorized administration, an International Load Line Certificate
28
I, II, III, IV
29
25 per cent less than those calculated
30
IV
31
Two- thirds of the fore and aft.
nav
nav
Hope Nueva España · 58問 · 2年前nav
nav
58問 • 2年前marlaw
marlaw
Hope Nueva España · 14問 · 2年前marlaw
marlaw
14問 • 2年前marlaw(2)
marlaw(2)
Hope Nueva España · 90問 · 2年前marlaw(2)
marlaw(2)
90問 • 2年前MARCOM
MARCOM
Hope Nueva España · 40問 · 2年前MARCOM
MARCOM
40問 • 2年前nav(2)
nav(2)
Hope Nueva España · 30問 · 2年前nav(2)
nav(2)
30問 • 2年前nav(semi)
nav(semi)
Hope Nueva España · 60問 · 2年前nav(semi)
nav(semi)
60問 • 2年前navfinals
navfinals
Hope Nueva España · 45問 · 2年前navfinals
navfinals
45問 • 2年前marlawfinals
marlawfinals
Hope Nueva España · 50問 · 2年前marlawfinals
marlawfinals
50問 • 2年前dwatch
dwatch
Hope Nueva España · 13問 · 2年前dwatch
dwatch
13問 • 2年前marpower
marpower
Hope Nueva España · 25問 · 2年前marpower
marpower
25問 • 2年前entrep
entrep
Hope Nueva España · 37問 · 2年前entrep
entrep
37問 • 2年前seammidterms
seammidterms
Hope Nueva España · 50問 · 1年前seammidterms
seammidterms
50問 • 1年前navmidterms
navmidterms
Hope Nueva España · 40問 · 1年前navmidterms
navmidterms
40問 • 1年前navmidterms2
navmidterms2
Hope Nueva España · 18問 · 1年前navmidterms2
navmidterms2
18問 • 1年前entrepmid
entrepmid
Hope Nueva España · 55問 · 1年前entrepmid
entrepmid
55問 • 1年前entrepmid22
entrepmid22
Hope Nueva España · 35問 · 1年前entrepmid22
entrepmid22
35問 • 1年前mtexfinal
mtexfinal
Hope Nueva España · 36問 · 1年前mtexfinal
mtexfinal
36問 • 1年前問題一覧
1
IV
2
In the Tropical cirteria, there shall be more than one tropical storm in 10 years in an area of 5° square in any one separate calendar month.
3
Northern Winter Seasonal Zones and Area
4
Southern Winter Seasonal Zone
5
WINTER: 16 October to 15 April; SUMMER: 16 April to 15 October
6
Tropical Zone
7
WINTER: 16 April to 15 October; SUMMER: 16 October to 15 April
8
Seasonal Tropical Areas
9
TROPICAL: 1 November to 15 July, SUMMER: 16 July to 31 October
10
Philippine Sea
11
TROPICAL: 1 September to 31 May, SUMMER: 1 June to 31 August
12
TROPICAL: 1 December to 30 Abril: SUMMER: 1 May to 30 November
13
TROPICAL: 1 April to 30 November; SUMMER: 1 December to 31 March
14
Every Contracting Government shall have no responsibility for facilitating the conduct of the audit and implementation of a programme of actions to address the findings, based on the guidelines developed by the Organization.
15
16 - Audit Standard doe not, mean the Code for Implementation.
16
The freeboard deck is normally the uppermost complete deck not exposed to weather and sea, which has permanent means of closing all openings in the weather part thereof, and below which all the openings in the sides of the ship are fitted with permanent means of watertight closing
17
Completion date of the survey on which this certificate is based (dd/mm/yy)
18
Load line
19
to allot a maximum legal limit up to which a ship can be loaded by cargo
20
The risk of having the vessel sailing with inadequate freeboard and buoyancy can be limited.
21
The complete Load line markings consist of 2 vital parts.
22
Deck Line
23
It is the 300mm diameter and 25mm thick round shaped disc
24
it is the 300mm diameter and 25mm thick round shaped disc
25
New ships constructed on or after 1 January 2007
26
The buoyancy and immersion of the vessel does not depend on the type of water and its density.
27
Every ship that has been surveyed and marked in accordance with the present Load line convention are issued by the authorized administration, an International Load Line Certificate
28
I, II, III, IV
29
25 per cent less than those calculated
30
IV
31
Two- thirds of the fore and aft.