concrete 93-127

concrete 93-127
34問 • 2023-09-10
  • David Bobadilla
  • 通報

    scaffold quiz

    scaffold quiz

    David Bobadilla · 13問 · 3年前

    scaffold quiz

    scaffold quiz

    13問 • 3年前
    David Bobadilla

    concrete test #1

    concrete test #1

    David Bobadilla · 13問 · 3年前

    concrete test #1

    concrete test #1

    13問 • 3年前
    David Bobadilla

    Slope test

    Slope test

    David Bobadilla · 7問 · 3年前

    Slope test

    Slope test

    7問 • 3年前
    David Bobadilla

    structure test

    structure test

    David Bobadilla · 13問 · 3年前

    structure test

    structure test

    13問 • 3年前
    David Bobadilla

    Doors/windows

    Doors/windows

    David Bobadilla · 13問 · 3年前

    Doors/windows

    Doors/windows

    13問 • 3年前
    David Bobadilla

    Walls

    Walls

    David Bobadilla · 7問 · 3年前

    Walls

    Walls

    7問 • 3年前
    David Bobadilla

    Masonry

    Masonry

    David Bobadilla · 12問 · 3年前

    Masonry

    Masonry

    12問 • 3年前
    David Bobadilla

    Mortar

    Mortar

    David Bobadilla · 5問 · 3年前

    Mortar

    Mortar

    5問 • 3年前
    David Bobadilla

    Floor/ Foundation

    Floor/ Foundation

    David Bobadilla · 9問 · 3年前

    Floor/ Foundation

    Floor/ Foundation

    9問 • 3年前
    David Bobadilla

    Framing

    Framing

    David Bobadilla · 9問 · 3年前

    Framing

    Framing

    9問 • 3年前
    David Bobadilla

    steel

    steel

    David Bobadilla · 15問 · 3年前

    steel

    steel

    15問 • 3年前
    David Bobadilla

    1 hard questions

    1 hard questions

    David Bobadilla · 26問 · 3年前

    1 hard questions

    1 hard questions

    26問 • 3年前
    David Bobadilla

    concrete 1-31

    concrete 1-31

    David Bobadilla · 31問 · 3年前

    concrete 1-31

    concrete 1-31

    31問 • 3年前
    David Bobadilla

    concrete 32-62

    concrete 32-62

    David Bobadilla · 30問 · 3年前

    concrete 32-62

    concrete 32-62

    30問 • 3年前
    David Bobadilla

    concrete 63-93

    concrete 63-93

    David Bobadilla · 31問 · 3年前

    concrete 63-93

    concrete 63-93

    31問 • 3年前
    David Bobadilla

    問題一覧

  • 1

    If using a compressor to provide air, before using that air supply to blow off dust from clothing or body, the pressure must be reduced to what maximum amount:

    30 psi

  • 2

    If using a batterboard layout for footers, if the rod reading is 6.2 and the top of the batterboards must be 2'6" higher than the reading, what will the correct reading at the top of the batterboards be:

    3.7

  • 3

    If the footing bottom reading is to be 94, the benchmark reads 100 and the backsite reading is 4.70, what will the rod reading for the trench be:

    10.7

  • 4

    What is the approximate volume shrinkage for newly placed concrete:

    .05%

  • 5

    If employees are working in a trench 4 1/2 feet deep within what maximum distance from a ladder for egress must ladders be placed:

    25’

  • 6

    Which of following numbers produces a square:

    3-4-5

  • 7

    What is the lowest grade plywood that can be used for a concrete form:

    B-B

  • 8

    If using a builder's level to set a cut stake for an excavation of a trench, the bottom of the trench will be at 94.00, the backsite to the benchmark (elevation 102.50) has a rod reading of 4.70 and a rod reading on the cut stake of 6.20, so what does the stake read:

    C7.00

  • 9

    What concrete would be used to increase curing time in cold weather:

    Ill

  • 10

    What does grade 40 refer to:

    40000 PPSI tensile

  • 11

    What is the most common size of wire tie used for rebar installation:

    16

  • 12

    What is the minimum number of rebar required for a vertical column:

    4

  • 13

    What concrete finish is provided for concrete that will be covered with earth:

    class 3 (I||)

  • 14

    If using vibratory placement for concrete, which of the following is true:

    allows the use of larger aggregate

  • 15

    What is the problem with insulated concrete forms:

    may blowout during pour of care is not exercised

  • 16

    What is placed at the bottom of a beam form:

    1X nominal

  • 17

    What effect does high placement temperatures have on concrete:

    decreases slump

  • 18

    The heat produced from setting concrete is called what:

    heat of hydration

  • 19

    If embedding a wood girder in concrete, how much space is left on all sides of the girder:

    1/2"

  • 20

    What is the minimum amount of time necessary for concrete to cure to 70% of its design strength (not including high early):

    7 days

  • 21

    Initial mixing time for a concrete batch over 1 cubic yard increases by what amount of time for each 1/2 cubic yard of material:

    15 seconds

  • 22

    Considering the placement of rebar, which has the least effect for incorrect placement:

    longitudinal

  • 23

    Concrete in walls, footings or beams of appreciable height should be placed in horizontal layers not exceeding:

    18”

  • 24

    How much water is allowed to accumalate in a working open trench:

    0”

  • 25

    Lifting materials overhead requires all exposed workers to be wearing:

    hard hats

  • 26

    What is the most common cause of segregation in concrete:

    too much water

  • 27

    What do you call the water that comes to the top of newly placed concrete:

    bleed

  • 28

    What concrete is referred to as high-early:

    Type IlI

  • 29

    Spalling, crazing and dusting of concrete is caused by what:

    over finishing

  • 30

    What is the usual traveling speed for a slip form:

    6-12 inches per hour

  • 31

    What slump of concrete is desired when using a vibrator in a form:

    1-2

  • 32

    A cubic yard is defined as volume produced by multiplying the length times the width times what in feet divided by 27:

    depth

  • 33

    What is the required slope for soils away from the structure:

    5%

  • 34

    A 45 degree angle produces what percentage of slope:

    100