ログイン

EE MODULE 2.2
74問 • 1年前
  • premopremo remo
  • 通報

    問題一覧

  • 1

    The load must not be connected directly on

    transmission line

  • 2

    The lighting arrester is installed

    at the top of the building

  • 3

    Incase of pin type insulators, the petticoats are provided to

    to drip out the rain water and to increase the possible conducting length of the path

  • 4

    If the specific resistance of the conductor is increased, what effect does it result on the skin effect?

    decreasing

  • 5

    The capacitor bank is installed

    to improve the power factor and voltage magnitude

  • 6

    Pole mounting substations are also known as

    outdoor type

  • 7

    A circuit breaker serves the purpose of

    all of the above

  • 8

    As compared to steam stations, hydro-power station have

    C. both A and B

  • 9

    In practice, the cost of energy transmission is minimum for

    steam power plant

  • 10

    The peak load demand of an industrial area is met by

    diesel power plant

  • 11

    Diversity factor is the

    D. reciprocal of A

  • 12

    Demand factor for a domestic fan and refrigerator is approximately

    0.75 and 1.0

  • 13

    The surge impedance of a transmission line differs from its characteristics impedance, as surge Impedance consider line

    B. resistance of finite value

  • 14

    Booster transformers are used to increase the voltage at of a transmission line

    intermediate points

  • 15

    The transfer of real power between interconnected stations is affected by

    capacitance

  • 16

    Shunt conductance in power transmission lines is due to leakage over the

    insulators

  • 17

    Voltage gradient in a cable is highest at the

    surface of the conductor

  • 18

    The real part of propagation constant of a transmission line is

    attenuation constant

  • 19

    For a span of length of 2l, horizontal tension at supports as 7 weight of the conductor per unit length is w the maximum value of sag will be

    wl^2/2T

  • 20

    The sag of the transmission line is addected by

    Both A and B

  • 21

    Most commonly used supports for high tension lines is

    latticed steel poles

  • 22

    When horizontal tension H increases by 20%, the tension T changes by a

    increase of 20%

  • 23

    A transmission line is a circuit with

    A. distributed parameters of R, L, C and G

  • 24

    When the conductor of a three-phase circuit are not spaced equilaterally, the transposition is done to

    C. balance the three phases of the circuit

  • 25

    The transmission line inductance contributed by

    the current in ither conductor

  • 26

    Regulating transformers are used inpower system to control

    load flow

  • 27

    When a wave propagate on a transmission line, it suffers reflection several times at

    sending and other end

  • 28

    Advantages of grounding are

    C. both A and B

  • 29

    When the fuel input to the prime mover of an alternator is increased, it increases its

    power output

  • 30

    The generating station with mimimum running cost is

    hydro power station

  • 31

    Power plant having the maixmum efficiency is

    nuclear

  • 32

    Tappings in on-load tap changing transformer are provided on

    HV side

  • 33

    The cost of the power generation will decrease when the load factor

    increases

  • 34

    Water is used only for cooling purposes in

    diesel power station

  • 35

    Turbo-alternators usually have

    2 poles

  • 36

    Alternators installed in hydro power station, are of

    medium speed

  • 37

    The protection from negative sequence currents is provided for

    generators

  • 38

    The value of diversity factor is

    greater than one

  • 39

    The turbine used for high head in hydro plant is

    Pelton turbine

  • 40

    The per unit impedances of a transformer referred from the primary and secondary side

    B. are equal

  • 41

    For load flow analysis transmission line are represented

    nominal T

  • 42

    The bus bar of the power system, whose voltage magnitude and angle is not known, is called

    load bus

  • 43

    The zero sequence current in & winding of Y/A transformer is found

    if neutral point of Y winding is earthed

  • 44

    The zero sequence current will not flow in the

    L-L fault

  • 45

    The presence of earth alters the

    C. both A and B

  • 46

    A two terminal pair of network of a transmission line can be represented by a

    C. either A and B

  • 47

    Ferranti effect states that the receiving end voltage on no load is

    C. more than that at sending end

  • 48

    Advantages of constant voltage transmission are

    All of the above

  • 49

    A transmission line has value of its A constant as

    nearly equal unity

  • 50

    The cause of transient stability is

    all of the above

  • 51

    Corona always causes

    radio interference

  • 52

    Lamp flicker in secondary distribution system is controlled by

    C. both A and B

  • 53

    Transient stability can be improved by the use of

    D. all of the above

  • 54

    When a line to line fault occurs, the SC current of an alternator depends upon its

    synchrounous reactance

  • 55

    Causes of faults in power system

    all of these

  • 56

    The various power system faults can be arranged in the order of increasing severity is

    L-G, L-L, L-L-G, L-L-L-G

  • 57

    The negative sequence component of a voltage is equal to

    complex conjugate of positive sequence component

  • 58

    In circuit breakers, the arc is initiated by the process of

    C. either A and B

  • 59

    At the open circuited end of a transmission line the reflection coefficient is

    1.0

  • 60

    One conductor open in a three phase transmission line will develop

    a parallel connection of sequence networks

  • 61

    The steady state stability limit of a two-machine system depends on

    per unit reactance of the power system

  • 62

    A shunt fault is characterized by

    increase in current reduction, frequency and p.f.

  • 63

    Most economic load on an overhead line is

    greater than the natural load

  • 64

    The most economical load on an underground cable is

    less than the surge loading

  • 65

    In subsequent iteration, a voltage-controlled bus is treated as a load bus when its

    reactive power limit is violated

  • 66

    Voltage magnitude of a particular bus can be controlled by controlling the

    B. reactive power of the bus

  • 67

    Convergeance of the transmission load flow is always assured in case of

    D. both A and C

  • 68

    For the stable operation of interconnected system, the passive element that can be used as interconnecting elements is.

    A. reactor

  • 69

    The positive sequence component of the voltage at the point of fault is zero when it is a

    three phase fault

  • 70

    Load flow study is carried out for

    system planning

  • 71

    The main consideration for higher operating voltage of transmission is to

    C. Increase power transfer capability

  • 72

    If the effect of earth is taken into account, then the capacitance of line to ground

    B. increases

  • 73

    For a Y-∆transformer Y-side grounded, the zero sequence current

    exists in the line on the Y-side

  • 74

    If real power cemand is suddenly increased frequency of the system will

    decrease

  • DC CIRCUITS POWERLINE

    DC CIRCUITS POWERLINE

    premopremo remo · 75問 · 2年前

    DC CIRCUITS POWERLINE

    DC CIRCUITS POWERLINE

    75問 • 2年前
    premopremo remo

    AC CIRCUIT POWERLINE

    AC CIRCUIT POWERLINE

    premopremo remo · 100問 · 2年前

    AC CIRCUIT POWERLINE

    AC CIRCUIT POWERLINE

    100問 • 2年前
    premopremo remo

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    premopremo remo · 80問 · 2年前

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    80問 • 2年前
    premopremo remo

    AC CIRCUIT PASS REVIEWER

    AC CIRCUIT PASS REVIEWER

    premopremo remo · 88問 · 2年前

    AC CIRCUIT PASS REVIEWER

    AC CIRCUIT PASS REVIEWER

    88問 • 2年前
    premopremo remo

    AC CIRCUIT PART 8 PINOYBIX

    AC CIRCUIT PART 8 PINOYBIX

    premopremo remo · 50問 · 2年前

    AC CIRCUIT PART 8 PINOYBIX

    AC CIRCUIT PART 8 PINOYBIX

    50問 • 2年前
    premopremo remo

    AC CIRCUIT PART 1 PINOYBIX

    AC CIRCUIT PART 1 PINOYBIX

    premopremo remo · 20問 · 2年前

    AC CIRCUIT PART 1 PINOYBIX

    AC CIRCUIT PART 1 PINOYBIX

    20問 • 2年前
    premopremo remo

    DC MACHINES POWERLINE REVIEWER

    DC MACHINES POWERLINE REVIEWER

    premopremo remo · 80問 · 2年前

    DC MACHINES POWERLINE REVIEWER

    DC MACHINES POWERLINE REVIEWER

    80問 • 2年前
    premopremo remo

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    premopremo remo · 64問 · 2年前

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    64問 • 2年前
    premopremo remo

    POLYPHASE POWERLINE REVIEWER

    POLYPHASE POWERLINE REVIEWER

    premopremo remo · 63問 · 2年前

    POLYPHASE POWERLINE REVIEWER

    POLYPHASE POWERLINE REVIEWER

    63問 • 2年前
    premopremo remo

    AC CIRCUIT POWERLINE SUPPLY

    AC CIRCUIT POWERLINE SUPPLY

    premopremo remo · 59問 · 2年前

    AC CIRCUIT POWERLINE SUPPLY

    AC CIRCUIT POWERLINE SUPPLY

    59問 • 2年前
    premopremo remo

    AC MACHINES (TRANSFORMER)

    AC MACHINES (TRANSFORMER)

    premopremo remo · 54問 · 2年前

    AC MACHINES (TRANSFORMER)

    AC MACHINES (TRANSFORMER)

    54問 • 2年前
    premopremo remo

    CIRCUIT TRANSIENT POWERLINE

    CIRCUIT TRANSIENT POWERLINE

    premopremo remo · 32問 · 2年前

    CIRCUIT TRANSIENT POWERLINE

    CIRCUIT TRANSIENT POWERLINE

    32問 • 2年前
    premopremo remo

    POWERSYSTEM POWERLINE

    POWERSYSTEM POWERLINE

    premopremo remo · 92問 · 2年前

    POWERSYSTEM POWERLINE

    POWERSYSTEM POWERLINE

    92問 • 2年前
    premopremo remo

    POWERLINE REVIEWER POWERPLANT

    POWERLINE REVIEWER POWERPLANT

    premopremo remo · 61問 · 2年前

    POWERLINE REVIEWER POWERPLANT

    POWERLINE REVIEWER POWERPLANT

    61問 • 2年前
    premopremo remo

    AC MOTORS SUPPLEMENTARY

    AC MOTORS SUPPLEMENTARY

    premopremo remo · 45問 · 2年前

    AC MOTORS SUPPLEMENTARY

    AC MOTORS SUPPLEMENTARY

    45問 • 2年前
    premopremo remo

    POWERSYSTEM SUPPLYMENTARY

    POWERSYSTEM SUPPLYMENTARY

    premopremo remo · 40問 · 2年前

    POWERSYSTEM SUPPLYMENTARY

    POWERSYSTEM SUPPLYMENTARY

    40問 • 2年前
    premopremo remo

    ALGEBRA

    ALGEBRA

    premopremo remo · 42問 · 2年前

    ALGEBRA

    ALGEBRA

    42問 • 2年前
    premopremo remo

    ANALYTIC GEOMETRY

    ANALYTIC GEOMETRY

    premopremo remo · 33問 · 2年前

    ANALYTIC GEOMETRY

    ANALYTIC GEOMETRY

    33問 • 2年前
    premopremo remo

    TRIGONOMETRY

    TRIGONOMETRY

    premopremo remo · 23問 · 2年前

    TRIGONOMETRY

    TRIGONOMETRY

    23問 • 2年前
    premopremo remo

    HYDRAULICS/

    HYDRAULICS/

    premopremo remo · 28問 · 1年前

    HYDRAULICS/

    HYDRAULICS/

    28問 • 1年前
    premopremo remo

    STRENGTH OF MATERIALS

    STRENGTH OF MATERIALS

    premopremo remo · 7問 · 1年前

    STRENGTH OF MATERIALS

    STRENGTH OF MATERIALS

    7問 • 1年前
    premopremo remo

    ENGINEERING MECHANICS

    ENGINEERING MECHANICS

    premopremo remo · 46問 · 1年前

    ENGINEERING MECHANICS

    ENGINEERING MECHANICS

    46問 • 1年前
    premopremo remo

    AC MACHINES (MOTOR)

    AC MACHINES (MOTOR)

    premopremo remo · 25問 · 1年前

    AC MACHINES (MOTOR)

    AC MACHINES (MOTOR)

    25問 • 1年前
    premopremo remo

    ENGINEERING ECONOMY

    ENGINEERING ECONOMY

    premopremo remo · 47問 · 1年前

    ENGINEERING ECONOMY

    ENGINEERING ECONOMY

    47問 • 1年前
    premopremo remo

    THERMODYNAMICS

    THERMODYNAMICS

    premopremo remo · 50問 · 1年前

    THERMODYNAMICS

    THERMODYNAMICS

    50問 • 1年前
    premopremo remo

    APPLIED PHYSICS AND ELECTROMAGNETICS

    APPLIED PHYSICS AND ELECTROMAGNETICS

    premopremo remo · 59問 · 1年前

    APPLIED PHYSICS AND ELECTROMAGNETICS

    APPLIED PHYSICS AND ELECTROMAGNETICS

    59問 • 1年前
    premopremo remo

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    premopremo remo · 47問 · 1年前

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    47問 • 1年前
    premopremo remo

    PEC 2017

    PEC 2017

    premopremo remo · 62問 · 1年前

    PEC 2017

    PEC 2017

    62問 • 1年前
    premopremo remo

    ESAS 2 EVAL

    ESAS 2 EVAL

    premopremo remo · 69問 · 1年前

    ESAS 2 EVAL

    ESAS 2 EVAL

    69問 • 1年前
    premopremo remo

    ESAS 3 EVAL

    ESAS 3 EVAL

    premopremo remo · 55問 · 1年前

    ESAS 3 EVAL

    ESAS 3 EVAL

    55問 • 1年前
    premopremo remo

    ESAS 1 EVAL

    ESAS 1 EVAL

    premopremo remo · 25問 · 1年前

    ESAS 1 EVAL

    ESAS 1 EVAL

    25問 • 1年前
    premopremo remo

    EE1 CIRCUITS

    EE1 CIRCUITS

    premopremo remo · 93問 · 1年前

    EE1 CIRCUITS

    EE1 CIRCUITS

    93問 • 1年前
    premopremo remo

    EE 2 MACHINES EVAL

    EE 2 MACHINES EVAL

    premopremo remo · 93問 · 1年前

    EE 2 MACHINES EVAL

    EE 2 MACHINES EVAL

    93問 • 1年前
    premopremo remo

    PASS BOARD EXAM

    PASS BOARD EXAM

    premopremo remo · 93問 · 1年前

    PASS BOARD EXAM

    PASS BOARD EXAM

    93問 • 1年前
    premopremo remo

    MATH PRE BOARD POWERLINE

    MATH PRE BOARD POWERLINE

    premopremo remo · 98問 · 1年前

    MATH PRE BOARD POWERLINE

    MATH PRE BOARD POWERLINE

    98問 • 1年前
    premopremo remo

    EE POWERLINE PREBOARD

    EE POWERLINE PREBOARD

    premopremo remo · 3回閲覧 · 100問 · 1年前

    EE POWERLINE PREBOARD

    EE POWERLINE PREBOARD

    3回閲覧 • 100問 • 1年前
    premopremo remo

    ESAS POWERLINE PREBOARD

    ESAS POWERLINE PREBOARD

    premopremo remo · 100問 · 1年前

    ESAS POWERLINE PREBOARD

    ESAS POWERLINE PREBOARD

    100問 • 1年前
    premopremo remo

    ESAS OBJECTIBE TYPES

    ESAS OBJECTIBE TYPES

    premopremo remo · 100問 · 1年前

    ESAS OBJECTIBE TYPES

    ESAS OBJECTIBE TYPES

    100問 • 1年前
    premopremo remo

    EE MODULE 1

    EE MODULE 1

    premopremo remo · 100問 · 1年前

    EE MODULE 1

    EE MODULE 1

    100問 • 1年前
    premopremo remo

    MATH MODULE 2

    MATH MODULE 2

    premopremo remo · 100問 · 1年前

    MATH MODULE 2

    MATH MODULE 2

    100問 • 1年前
    premopremo remo

    MATH MODULE 2 101

    MATH MODULE 2 101

    premopremo remo · 100問 · 1年前

    MATH MODULE 2 101

    MATH MODULE 2 101

    100問 • 1年前
    premopremo remo

    MATH MODULE 2 102

    MATH MODULE 2 102

    premopremo remo · 54問 · 1年前

    MATH MODULE 2 102

    MATH MODULE 2 102

    54問 • 1年前
    premopremo remo

    ESAS MODULE 1

    ESAS MODULE 1

    premopremo remo · 100問 · 1年前

    ESAS MODULE 1

    ESAS MODULE 1

    100問 • 1年前
    premopremo remo

    ESAS MODULE 4

    ESAS MODULE 4

    premopremo remo · 100問 · 1年前

    ESAS MODULE 4

    ESAS MODULE 4

    100問 • 1年前
    premopremo remo

    ESAS MODULE 4.2

    ESAS MODULE 4.2

    premopremo remo · 100問 · 1年前

    ESAS MODULE 4.2

    ESAS MODULE 4.2

    100問 • 1年前
    premopremo remo

    ESAS MODULE 4.3

    ESAS MODULE 4.3

    premopremo remo · 15問 · 1年前

    ESAS MODULE 4.3

    ESAS MODULE 4.3

    15問 • 1年前
    premopremo remo

    EE MODULE 3

    EE MODULE 3

    premopremo remo · 100問 · 1年前

    EE MODULE 3

    EE MODULE 3

    100問 • 1年前
    premopremo remo

    EE MODULE 2

    EE MODULE 2

    premopremo remo · 100問 · 1年前

    EE MODULE 2

    EE MODULE 2

    100問 • 1年前
    premopremo remo

    EE REFRESHER 4

    EE REFRESHER 4

    premopremo remo · 99問 · 1年前

    EE REFRESHER 4

    EE REFRESHER 4

    99問 • 1年前
    premopremo remo

    MATH REFRESHER 4

    MATH REFRESHER 4

    premopremo remo · 98問 · 1年前

    MATH REFRESHER 4

    MATH REFRESHER 4

    98問 • 1年前
    premopremo remo

    ESAS REFRESHER 4

    ESAS REFRESHER 4

    premopremo remo · 100問 · 1年前

    ESAS REFRESHER 4

    ESAS REFRESHER 4

    100問 • 1年前
    premopremo remo

    ESAS REFRESHER 3

    ESAS REFRESHER 3

    premopremo remo · 99問 · 1年前

    ESAS REFRESHER 3

    ESAS REFRESHER 3

    99問 • 1年前
    premopremo remo

    MATH FLASHING

    MATH FLASHING

    premopremo remo · 100問 · 1年前

    MATH FLASHING

    MATH FLASHING

    100問 • 1年前
    premopremo remo

    MATH FLASHING 1.2

    MATH FLASHING 1.2

    premopremo remo · 39問 · 1年前

    MATH FLASHING 1.2

    MATH FLASHING 1.2

    39問 • 1年前
    premopremo remo

    MATH MULTIVECTOR

    MATH MULTIVECTOR

    premopremo remo · 32問 · 1年前

    MATH MULTIVECTOR

    MATH MULTIVECTOR

    32問 • 1年前
    premopremo remo

    問題一覧

  • 1

    The load must not be connected directly on

    transmission line

  • 2

    The lighting arrester is installed

    at the top of the building

  • 3

    Incase of pin type insulators, the petticoats are provided to

    to drip out the rain water and to increase the possible conducting length of the path

  • 4

    If the specific resistance of the conductor is increased, what effect does it result on the skin effect?

    decreasing

  • 5

    The capacitor bank is installed

    to improve the power factor and voltage magnitude

  • 6

    Pole mounting substations are also known as

    outdoor type

  • 7

    A circuit breaker serves the purpose of

    all of the above

  • 8

    As compared to steam stations, hydro-power station have

    C. both A and B

  • 9

    In practice, the cost of energy transmission is minimum for

    steam power plant

  • 10

    The peak load demand of an industrial area is met by

    diesel power plant

  • 11

    Diversity factor is the

    D. reciprocal of A

  • 12

    Demand factor for a domestic fan and refrigerator is approximately

    0.75 and 1.0

  • 13

    The surge impedance of a transmission line differs from its characteristics impedance, as surge Impedance consider line

    B. resistance of finite value

  • 14

    Booster transformers are used to increase the voltage at of a transmission line

    intermediate points

  • 15

    The transfer of real power between interconnected stations is affected by

    capacitance

  • 16

    Shunt conductance in power transmission lines is due to leakage over the

    insulators

  • 17

    Voltage gradient in a cable is highest at the

    surface of the conductor

  • 18

    The real part of propagation constant of a transmission line is

    attenuation constant

  • 19

    For a span of length of 2l, horizontal tension at supports as 7 weight of the conductor per unit length is w the maximum value of sag will be

    wl^2/2T

  • 20

    The sag of the transmission line is addected by

    Both A and B

  • 21

    Most commonly used supports for high tension lines is

    latticed steel poles

  • 22

    When horizontal tension H increases by 20%, the tension T changes by a

    increase of 20%

  • 23

    A transmission line is a circuit with

    A. distributed parameters of R, L, C and G

  • 24

    When the conductor of a three-phase circuit are not spaced equilaterally, the transposition is done to

    C. balance the three phases of the circuit

  • 25

    The transmission line inductance contributed by

    the current in ither conductor

  • 26

    Regulating transformers are used inpower system to control

    load flow

  • 27

    When a wave propagate on a transmission line, it suffers reflection several times at

    sending and other end

  • 28

    Advantages of grounding are

    C. both A and B

  • 29

    When the fuel input to the prime mover of an alternator is increased, it increases its

    power output

  • 30

    The generating station with mimimum running cost is

    hydro power station

  • 31

    Power plant having the maixmum efficiency is

    nuclear

  • 32

    Tappings in on-load tap changing transformer are provided on

    HV side

  • 33

    The cost of the power generation will decrease when the load factor

    increases

  • 34

    Water is used only for cooling purposes in

    diesel power station

  • 35

    Turbo-alternators usually have

    2 poles

  • 36

    Alternators installed in hydro power station, are of

    medium speed

  • 37

    The protection from negative sequence currents is provided for

    generators

  • 38

    The value of diversity factor is

    greater than one

  • 39

    The turbine used for high head in hydro plant is

    Pelton turbine

  • 40

    The per unit impedances of a transformer referred from the primary and secondary side

    B. are equal

  • 41

    For load flow analysis transmission line are represented

    nominal T

  • 42

    The bus bar of the power system, whose voltage magnitude and angle is not known, is called

    load bus

  • 43

    The zero sequence current in & winding of Y/A transformer is found

    if neutral point of Y winding is earthed

  • 44

    The zero sequence current will not flow in the

    L-L fault

  • 45

    The presence of earth alters the

    C. both A and B

  • 46

    A two terminal pair of network of a transmission line can be represented by a

    C. either A and B

  • 47

    Ferranti effect states that the receiving end voltage on no load is

    C. more than that at sending end

  • 48

    Advantages of constant voltage transmission are

    All of the above

  • 49

    A transmission line has value of its A constant as

    nearly equal unity

  • 50

    The cause of transient stability is

    all of the above

  • 51

    Corona always causes

    radio interference

  • 52

    Lamp flicker in secondary distribution system is controlled by

    C. both A and B

  • 53

    Transient stability can be improved by the use of

    D. all of the above

  • 54

    When a line to line fault occurs, the SC current of an alternator depends upon its

    synchrounous reactance

  • 55

    Causes of faults in power system

    all of these

  • 56

    The various power system faults can be arranged in the order of increasing severity is

    L-G, L-L, L-L-G, L-L-L-G

  • 57

    The negative sequence component of a voltage is equal to

    complex conjugate of positive sequence component

  • 58

    In circuit breakers, the arc is initiated by the process of

    C. either A and B

  • 59

    At the open circuited end of a transmission line the reflection coefficient is

    1.0

  • 60

    One conductor open in a three phase transmission line will develop

    a parallel connection of sequence networks

  • 61

    The steady state stability limit of a two-machine system depends on

    per unit reactance of the power system

  • 62

    A shunt fault is characterized by

    increase in current reduction, frequency and p.f.

  • 63

    Most economic load on an overhead line is

    greater than the natural load

  • 64

    The most economical load on an underground cable is

    less than the surge loading

  • 65

    In subsequent iteration, a voltage-controlled bus is treated as a load bus when its

    reactive power limit is violated

  • 66

    Voltage magnitude of a particular bus can be controlled by controlling the

    B. reactive power of the bus

  • 67

    Convergeance of the transmission load flow is always assured in case of

    D. both A and C

  • 68

    For the stable operation of interconnected system, the passive element that can be used as interconnecting elements is.

    A. reactor

  • 69

    The positive sequence component of the voltage at the point of fault is zero when it is a

    three phase fault

  • 70

    Load flow study is carried out for

    system planning

  • 71

    The main consideration for higher operating voltage of transmission is to

    C. Increase power transfer capability

  • 72

    If the effect of earth is taken into account, then the capacitance of line to ground

    B. increases

  • 73

    For a Y-∆transformer Y-side grounded, the zero sequence current

    exists in the line on the Y-side

  • 74

    If real power cemand is suddenly increased frequency of the system will

    decrease