    Out of the following, which ONE is not inconventional source of energy?

    nuclear power

  • 2

    What is the reason why thermal power plant decrease capacity during summer?

    temperature rise of the lake

  • 3

    An effective remover of dusts, carbon particales and other from flue gas of power plant?

    Electrostatic precipitator

  • 4

    The efficiency of the terminal power plant improves __________

    useb high steam efficiency

  • 5

    Reheat cycle in steam power plant is used to

    increase thermal efficiency

  • 6

    Which power plant can have a singe unit up to 100 MW

    diesel power plant

  • 7

    Which of the following powerplant will take least time in starting from cold condition to full load condition?

    Hydro electric

  • 8

    In fission energy is produced when _______

    nuclear particles plant

  • 9

    Which of the following is a variable renewable energy (VRE)?

    Solar plant

  • 10

    The net energy required of a certain countrybin the yr. 2020 was approximately 3x10^6 Hwh. What is the equivalent value in quad?

    10.24

  • 11

    In a power station, 4x10^4 Gwh of energy is to be produced in 1 yr. half from coal and half from natural gas. The energy content of coal is 900 W-yr per ton and that of natural gas is 0.03 W-yr. per ft^3. How much natural gas will be required?

    76.1x10^9 ft^3

  • 12

    A 100 MW power plant has a heat rate of 2.88x10^8 Calories per kWh. Itbisba base load plant and runs at full load 24 hrs. a day. How many tonsbof coal is needed per day?

    960

  • 13

    A diesel power station has a fuel consumption of 0.37 lb/kWh, the calorific value of fuel being 30,000 BTU/lb. Determine the engine efficiency if the generator efficiency is 95% neglect brake power on the engine

    32%

  • 14

    * The growth rate of the energy consumption innout country is 6.9%. In how many years will the energy consumption be quadrupled?

    20 yrs

  • 15

    Natural gas reserve in a certain country is estimated at 100x10^9 ft^3, with an enegry content of 0.025 W-yr. per ft^3, if the present peak power demand is 0.5 GW and the power demand growth rate is 5% and all the energy is to be supplied by natural gas approximately how long will the reserve last?

    4.46 yrs

  • 16

    What is the function of the surge tank in the hydropower plant?

    Relieve water hammer pressures in the penstock pipe

  • 17

    Part of hydroelectric power station that discharges the surplus water from storage reservior into the river on the downstream side of the dam.

    Spillway

  • 18

    How does the ouput of hydraulic turbine vary the diameter of the blade?

    It varies directly as the square of the diameter of the blade

  • 19

    Two million cu meter of water is stored in a reservoir feeding water turbine. If the center of the mass is 50 m above the turbine and losses are negligible, how much energy (in Mwh) will that volume produced? The density of water is 993 kg/m^3

    271

  • 20

    A wind generator with an efficiency of 80% has a blade diameter of 20 m. If the wind velocity is 35 kph. how much power is obtainable feom the generator?

    54.78 kW

  • 21

    The maximum tidal head available for a proposed tidal power station is 7m. If the wind velocity is 35 kph, how much power is obtainable from the generator?

    112 sq.km

  • 22

    A power customer is applying for source listed the loads as follows: 5-15 hp motor, 3-5 hp motors, lighting 8 kW, miscellaneous loads 3.5 kW. The demand factor is 65% and the power factor 80% wherein the load factor is 46%. What is the maximum kW demand for the customer?

    51

  • 23

    Which of the following define the meaning of load factor?

    The ratio of average load to maximum load

  • 24

    The power customer has four circuits of 220 volts, three phase. The circuits have the maximum demand as follows: Circuit 1 = 35 Am Circuit 3 = 72 Amp Circuit 2 = 46 Amp Circuit 4 = 57 Amp The diversity factor is 1.5 the load factor is 50% and the power factor is 80%. What is the approximate kW demand of the customer?

    21 kW

  • 25

    A power olant has maximum demanf of 15 MW. The annual load factor and capacity factor are 50% and 40% respectively. Determine the reserve capacity of the plant

    3750 kW

  • 26

    The annual load duration curve of a certain power station can be considered as a straight line from 20 MW to 4 MW. To meet this load, 3 turbo- alternator units, two rated at 10 MW each and one rated 5 MW are installed. Determine the plant use factor

    48%

  • 27

    A generating station has a maximum demand of 40 MW, annual load factor of 75%, annual plant capacity factir of 65% and a plant use factor of 85%. What is the annual energy produced?

    200.9×10^6 kWh

  • 28

    Base load plats are designed to supply power at ___________

    high capital cost & low operating cost

  • 29

    Peak load plants are designed to supply power at _________

    low capital cost & high operating cost

  • 30

    A generating station has following data installed capacity = 300 MW Annual load factor = 60%, Annual capacity factor = 50%, Annual interest & depreciation = 10% Annual cost of fuel, oil etc = P90 million, capital cost = P1,000 million. What is the cost per kWh generated?

    P0.24

  • 31

    What is the meaning of heat rate of a generating unit?

    The amount of fuel energy used to produced one kWHR

  • 32

    Which of the following is the least efficient power plant?

    Coal friend

  • 33

    A diesel power plant is best suited as ________

    Stand by

  • 34

    One of the following methods of producing emf NOT yet in commercial use

    Fuel cell

  • 35

    With which of thw following is enthaply associated?

    steam

  • 36

    In a steam turbine cycle the lowest pressure occurs in the____________

    Condenser

  • 37

    Which one is essential for combustion fuel?

    all of the above

  • 38

    Which of the following is non renewable source of energy?

    nuclear

  • 39

    Which of the following element is a radioactive?

    Uranium

  • 40

    The energy of present nuclear plants comes from

    the destruction of very tiny particles released when atoms split

  • 41

    In fusion energy is produced when ________

    nuclear combines particle

  • 42

    In the list below, which one is not a type of present day nuclear power plant?

    fusion fission reactor

  • 43

    Reflecting mirrors used for exploiting solar energy in a solar power plant is ________

    heliostats

  • 44

    Of the various methods of utilizing the heat from the sun one appreas to be the most efficient so far. Which one is this?

    mirrior and tracking system

  • 45

    To produce one kWh a power plant burns 0?9 lb of coal with a heating value of 13,000 BTU per lb. What is the heat rate of the plant?

    11,700 BTU/kW-hr

  • 46

    The turbine which is normally used in a tidal power plant is ______

    reversible type

  • 47

    The following are the essential parts of a hydroelectric power station. EXCEPT

    throttle valve

  • 48

    The intake pipe to the hyrdraulic turbine from a dam is called ________

    penstock

  • 49

    The water behind the dam at a hydrielectric power plant is _______

    pondage

  • 50

    which plant can never have 100 percent load factor?

    peak load plant

  • 51

    A low utilization factor for a plant indicates that __________

    plant is used for stand by purpose only

  • 52

    During load shedding what happen

    some load are switched off

  • 53

    Estimate the average power output of a wind turbine having a blade dismter of 35 ft if the wind velocity ranges from 10 tp 39 mph?

    42.20 kW

  • 54

    A hydroelectric plant generates 100 MW at an available head of 200 m and at an overall efficiency of 75% what quantity of water ine cubic meter per second is required?

    68

  • 55

    A power plant gets water from a dam feom a height of 122.45 meters at the rate of 1,000 cubic meter per minute. If the output of the plant is 15,000 kW what is the efficiency?

    75%

  • 56

    Daytime capacity when only 300 MW pump storage plant and 600 MW Nuclear plant is operating _______

    900 MW

  • 57

    A diversity factor of 4.2 gives a savings of _________ percent in the geenrating equipment

    76

  • 58

    The current loads of four circuits are as follows Circuit No.1 = 25 Amp Circuit No.3 = 18 Amp Circuit No.2 = 38 Amp Circuit No.4 = 45 Amp

    84 Amp

  • 59

    A power plant is said to have a use factor of 48.5% and a capacity factor of 42.4%. How many hours did it operate during the year?

    7,658 hrs

  • 60

    Which of the following generating station has the minimum running cost?

    Hydro electric plant

  • 61

    The type of switchgear assembly commonly selected for use in a turbine generator power plant is ________

    Dual benchboard

  • DC CIRCUITS POWERLINE

    DC CIRCUITS POWERLINE

    premopremo remo · 75問 · 2年前

    DC CIRCUITS POWERLINE

    DC CIRCUITS POWERLINE

    75問 • 2年前
    premopremo remo

    AC CIRCUIT POWERLINE

    AC CIRCUIT POWERLINE

    premopremo remo · 100問 · 2年前

    AC CIRCUIT POWERLINE

    AC CIRCUIT POWERLINE

    100問 • 2年前
    premopremo remo

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    premopremo remo · 80問 · 2年前

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    DC CIRCUIT SUPPLEMENTARY PROBLEMS

    80問 • 2年前
    premopremo remo

    AC CIRCUIT PASS REVIEWER

    AC CIRCUIT PASS REVIEWER

    premopremo remo · 88問 · 2年前

    AC CIRCUIT PASS REVIEWER

    AC CIRCUIT PASS REVIEWER

    88問 • 2年前
    premopremo remo

    AC CIRCUIT PART 8 PINOYBIX

    AC CIRCUIT PART 8 PINOYBIX

    premopremo remo · 50問 · 2年前

    AC CIRCUIT PART 8 PINOYBIX

    AC CIRCUIT PART 8 PINOYBIX

    50問 • 2年前
    premopremo remo

    AC CIRCUIT PART 1 PINOYBIX

    AC CIRCUIT PART 1 PINOYBIX

    premopremo remo · 20問 · 2年前

    AC CIRCUIT PART 1 PINOYBIX

    AC CIRCUIT PART 1 PINOYBIX

    20問 • 2年前
    premopremo remo

    DC MACHINES POWERLINE REVIEWER

    DC MACHINES POWERLINE REVIEWER

    premopremo remo · 80問 · 2年前

    DC MACHINES POWERLINE REVIEWER

    DC MACHINES POWERLINE REVIEWER

    80問 • 2年前
    premopremo remo

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    premopremo remo · 64問 · 2年前

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    AC MACHINES (ALTERNATOR) POWERLINE REVIEWER

    64問 • 2年前
    premopremo remo

    POLYPHASE POWERLINE REVIEWER

    POLYPHASE POWERLINE REVIEWER

    premopremo remo · 63問 · 2年前

    POLYPHASE POWERLINE REVIEWER

    POLYPHASE POWERLINE REVIEWER

    63問 • 2年前
    premopremo remo

    AC CIRCUIT POWERLINE SUPPLY

    AC CIRCUIT POWERLINE SUPPLY

    premopremo remo · 59問 · 2年前

    AC CIRCUIT POWERLINE SUPPLY

    AC CIRCUIT POWERLINE SUPPLY

    59問 • 2年前
    premopremo remo

    AC MACHINES (TRANSFORMER)

    AC MACHINES (TRANSFORMER)

    premopremo remo · 54問 · 2年前

    AC MACHINES (TRANSFORMER)

    AC MACHINES (TRANSFORMER)

    54問 • 2年前
    premopremo remo

    CIRCUIT TRANSIENT POWERLINE

    CIRCUIT TRANSIENT POWERLINE

    premopremo remo · 32問 · 2年前

    CIRCUIT TRANSIENT POWERLINE

    CIRCUIT TRANSIENT POWERLINE

    32問 • 2年前
    premopremo remo

    POWERSYSTEM POWERLINE

    POWERSYSTEM POWERLINE

    premopremo remo · 92問 · 2年前

    POWERSYSTEM POWERLINE

    POWERSYSTEM POWERLINE

    92問 • 2年前
    premopremo remo

    AC MOTORS SUPPLEMENTARY

    AC MOTORS SUPPLEMENTARY

    premopremo remo · 45問 · 2年前

    AC MOTORS SUPPLEMENTARY

    AC MOTORS SUPPLEMENTARY

    45問 • 2年前
    premopremo remo

    POWERSYSTEM SUPPLYMENTARY

    POWERSYSTEM SUPPLYMENTARY

    premopremo remo · 40問 · 2年前

    POWERSYSTEM SUPPLYMENTARY

    POWERSYSTEM SUPPLYMENTARY

    40問 • 2年前
    premopremo remo

    ALGEBRA

    ALGEBRA

    premopremo remo · 42問 · 2年前

    ALGEBRA

    ALGEBRA

    42問 • 2年前
    premopremo remo

    ANALYTIC GEOMETRY

    ANALYTIC GEOMETRY

    premopremo remo · 33問 · 2年前

    ANALYTIC GEOMETRY

    ANALYTIC GEOMETRY

    33問 • 2年前
    premopremo remo

    TRIGONOMETRY

    TRIGONOMETRY

    premopremo remo · 23問 · 2年前

    TRIGONOMETRY

    TRIGONOMETRY

    23問 • 2年前
    premopremo remo

    HYDRAULICS/

    HYDRAULICS/

    premopremo remo · 28問 · 1年前

    HYDRAULICS/

    HYDRAULICS/

    28問 • 1年前
    premopremo remo

    STRENGTH OF MATERIALS

    STRENGTH OF MATERIALS

    premopremo remo · 7問 · 1年前

    STRENGTH OF MATERIALS

    STRENGTH OF MATERIALS

    7問 • 1年前
    premopremo remo

    ENGINEERING MECHANICS

    ENGINEERING MECHANICS

    premopremo remo · 46問 · 1年前

    ENGINEERING MECHANICS

    ENGINEERING MECHANICS

    46問 • 1年前
    premopremo remo

    AC MACHINES (MOTOR)

    AC MACHINES (MOTOR)

    premopremo remo · 25問 · 1年前

    AC MACHINES (MOTOR)

    AC MACHINES (MOTOR)

    25問 • 1年前
    premopremo remo

    ENGINEERING ECONOMY

    ENGINEERING ECONOMY

    premopremo remo · 47問 · 1年前

    ENGINEERING ECONOMY

    ENGINEERING ECONOMY

    47問 • 1年前
    premopremo remo

    THERMODYNAMICS

    THERMODYNAMICS

    premopremo remo · 50問 · 1年前

    THERMODYNAMICS

    THERMODYNAMICS

    50問 • 1年前
    premopremo remo

    APPLIED PHYSICS AND ELECTROMAGNETICS

    APPLIED PHYSICS AND ELECTROMAGNETICS

    premopremo remo · 59問 · 1年前

    APPLIED PHYSICS AND ELECTROMAGNETICS

    APPLIED PHYSICS AND ELECTROMAGNETICS

    59問 • 1年前
    premopremo remo

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    premopremo remo · 47問 · 1年前

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    GENERAL CHEMISTRY AND MATERIAL SCIENCE

    47問 • 1年前
    premopremo remo

    PEC 2017

    PEC 2017

    premopremo remo · 62問 · 1年前

    PEC 2017

    PEC 2017

    62問 • 1年前
    premopremo remo

    ESAS 2 EVAL

    ESAS 2 EVAL

    premopremo remo · 69問 · 1年前

    ESAS 2 EVAL

    ESAS 2 EVAL

    69問 • 1年前
    premopremo remo

    ESAS 3 EVAL

    ESAS 3 EVAL

    premopremo remo · 55問 · 1年前

    ESAS 3 EVAL

    ESAS 3 EVAL

    55問 • 1年前
    premopremo remo

    ESAS 1 EVAL

    ESAS 1 EVAL

    premopremo remo · 25問 · 1年前

    ESAS 1 EVAL

    ESAS 1 EVAL

    25問 • 1年前
    premopremo remo

    EE1 CIRCUITS

    EE1 CIRCUITS

    premopremo remo · 93問 · 1年前

    EE1 CIRCUITS

    EE1 CIRCUITS

    93問 • 1年前
    premopremo remo

    EE 2 MACHINES EVAL

    EE 2 MACHINES EVAL

    premopremo remo · 93問 · 1年前

    EE 2 MACHINES EVAL

    EE 2 MACHINES EVAL

    93問 • 1年前
    premopremo remo

    PASS BOARD EXAM

    PASS BOARD EXAM

    premopremo remo · 93問 · 1年前

    PASS BOARD EXAM

    PASS BOARD EXAM

    93問 • 1年前
    premopremo remo

    MATH PRE BOARD POWERLINE

    MATH PRE BOARD POWERLINE

    premopremo remo · 98問 · 1年前

    MATH PRE BOARD POWERLINE

    MATH PRE BOARD POWERLINE

    98問 • 1年前
    premopremo remo

    EE POWERLINE PREBOARD

    EE POWERLINE PREBOARD

    premopremo remo · 3回閲覧 · 100問 · 1年前

    EE POWERLINE PREBOARD

    EE POWERLINE PREBOARD

    3回閲覧 • 100問 • 1年前
    premopremo remo

    ESAS POWERLINE PREBOARD

    ESAS POWERLINE PREBOARD

    premopremo remo · 100問 · 1年前

    ESAS POWERLINE PREBOARD

    ESAS POWERLINE PREBOARD

    100問 • 1年前
    premopremo remo

    ESAS OBJECTIBE TYPES

    ESAS OBJECTIBE TYPES

    premopremo remo · 100問 · 1年前

    ESAS OBJECTIBE TYPES

    ESAS OBJECTIBE TYPES

    100問 • 1年前
    premopremo remo

    EE MODULE 1

    EE MODULE 1

    premopremo remo · 100問 · 1年前

    EE MODULE 1

    EE MODULE 1

    100問 • 1年前
    premopremo remo

    EE MODULE 2.2

    EE MODULE 2.2

    premopremo remo · 74問 · 1年前

    EE MODULE 2.2

    EE MODULE 2.2

    74問 • 1年前
    premopremo remo

    MATH MODULE 2

    MATH MODULE 2

    premopremo remo · 100問 · 1年前

    MATH MODULE 2

    MATH MODULE 2

    100問 • 1年前
    premopremo remo

    MATH MODULE 2 101

    MATH MODULE 2 101

    premopremo remo · 100問 · 1年前

    MATH MODULE 2 101

    MATH MODULE 2 101

    100問 • 1年前
    premopremo remo

    MATH MODULE 2 102

    MATH MODULE 2 102

    premopremo remo · 54問 · 1年前

    MATH MODULE 2 102

    MATH MODULE 2 102

    54問 • 1年前
    premopremo remo

    ESAS MODULE 1

    ESAS MODULE 1

    premopremo remo · 100問 · 1年前

    ESAS MODULE 1

    ESAS MODULE 1

    100問 • 1年前
    premopremo remo

    ESAS MODULE 4

    ESAS MODULE 4

    premopremo remo · 100問 · 1年前

    ESAS MODULE 4

    ESAS MODULE 4

    100問 • 1年前
    premopremo remo

    ESAS MODULE 4.2

    ESAS MODULE 4.2

    premopremo remo · 100問 · 1年前

    ESAS MODULE 4.2

    ESAS MODULE 4.2

    100問 • 1年前
    premopremo remo

    ESAS MODULE 4.3

    ESAS MODULE 4.3

    premopremo remo · 15問 · 1年前

    ESAS MODULE 4.3

    ESAS MODULE 4.3

    15問 • 1年前
    premopremo remo

    EE MODULE 3

    EE MODULE 3

    premopremo remo · 100問 · 1年前

    EE MODULE 3

    EE MODULE 3

    100問 • 1年前
    premopremo remo

    EE MODULE 2

    EE MODULE 2

    premopremo remo · 100問 · 1年前

    EE MODULE 2

    EE MODULE 2

    100問 • 1年前
    premopremo remo

    EE REFRESHER 4

    EE REFRESHER 4

    premopremo remo · 99問 · 1年前

    EE REFRESHER 4

    EE REFRESHER 4

    99問 • 1年前
    premopremo remo

    MATH REFRESHER 4

    MATH REFRESHER 4

    premopremo remo · 98問 · 1年前

    MATH REFRESHER 4

    MATH REFRESHER 4

    98問 • 1年前
    premopremo remo

    ESAS REFRESHER 4

    ESAS REFRESHER 4

    premopremo remo · 100問 · 1年前

    ESAS REFRESHER 4

    ESAS REFRESHER 4

    100問 • 1年前
    premopremo remo

    ESAS REFRESHER 3

    ESAS REFRESHER 3

    premopremo remo · 99問 · 1年前

    ESAS REFRESHER 3

    ESAS REFRESHER 3

    99問 • 1年前
    premopremo remo

    MATH FLASHING

    MATH FLASHING

    premopremo remo · 100問 · 1年前

    MATH FLASHING

    MATH FLASHING

    100問 • 1年前
    premopremo remo

    MATH FLASHING 1.2

    MATH FLASHING 1.2

    premopremo remo · 39問 · 1年前

    MATH FLASHING 1.2

    MATH FLASHING 1.2

    39問 • 1年前
    premopremo remo

    MATH MULTIVECTOR

    MATH MULTIVECTOR

    premopremo remo · 32問 · 1年前

    MATH MULTIVECTOR

    MATH MULTIVECTOR

    32問 • 1年前
    premopremo remo

    問題一覧

  • 1

    Out of the following, which ONE is not inconventional source of energy?

    nuclear power

  • 2

    What is the reason why thermal power plant decrease capacity during summer?

    temperature rise of the lake

  • 3

    An effective remover of dusts, carbon particales and other from flue gas of power plant?

    Electrostatic precipitator

  • 4

    The efficiency of the terminal power plant improves __________

    useb high steam efficiency

  • 5

    Reheat cycle in steam power plant is used to

    increase thermal efficiency

  • 6

    Which power plant can have a singe unit up to 100 MW

    diesel power plant

  • 7

    Which of the following powerplant will take least time in starting from cold condition to full load condition?

    Hydro electric

  • 8

    In fission energy is produced when _______

    nuclear particles plant

  • 9

    Which of the following is a variable renewable energy (VRE)?

    Solar plant

  • 10

    The net energy required of a certain countrybin the yr. 2020 was approximately 3x10^6 Hwh. What is the equivalent value in quad?

    10.24

  • 11

    In a power station, 4x10^4 Gwh of energy is to be produced in 1 yr. half from coal and half from natural gas. The energy content of coal is 900 W-yr per ton and that of natural gas is 0.03 W-yr. per ft^3. How much natural gas will be required?

    76.1x10^9 ft^3

  • 12

    A 100 MW power plant has a heat rate of 2.88x10^8 Calories per kWh. Itbisba base load plant and runs at full load 24 hrs. a day. How many tonsbof coal is needed per day?

    960

  • 13

    A diesel power station has a fuel consumption of 0.37 lb/kWh, the calorific value of fuel being 30,000 BTU/lb. Determine the engine efficiency if the generator efficiency is 95% neglect brake power on the engine

    32%

  • 14

    * The growth rate of the energy consumption innout country is 6.9%. In how many years will the energy consumption be quadrupled?

    20 yrs

  • 15

    Natural gas reserve in a certain country is estimated at 100x10^9 ft^3, with an enegry content of 0.025 W-yr. per ft^3, if the present peak power demand is 0.5 GW and the power demand growth rate is 5% and all the energy is to be supplied by natural gas approximately how long will the reserve last?

    4.46 yrs

  • 16

    What is the function of the surge tank in the hydropower plant?

    Relieve water hammer pressures in the penstock pipe

  • 17

    Part of hydroelectric power station that discharges the surplus water from storage reservior into the river on the downstream side of the dam.

    Spillway

  • 18

    How does the ouput of hydraulic turbine vary the diameter of the blade?

    It varies directly as the square of the diameter of the blade

  • 19

    Two million cu meter of water is stored in a reservoir feeding water turbine. If the center of the mass is 50 m above the turbine and losses are negligible, how much energy (in Mwh) will that volume produced? The density of water is 993 kg/m^3

    271

  • 20

    A wind generator with an efficiency of 80% has a blade diameter of 20 m. If the wind velocity is 35 kph. how much power is obtainable feom the generator?

    54.78 kW

  • 21

    The maximum tidal head available for a proposed tidal power station is 7m. If the wind velocity is 35 kph, how much power is obtainable from the generator?

    112 sq.km

  • 22

    A power customer is applying for source listed the loads as follows: 5-15 hp motor, 3-5 hp motors, lighting 8 kW, miscellaneous loads 3.5 kW. The demand factor is 65% and the power factor 80% wherein the load factor is 46%. What is the maximum kW demand for the customer?

    51

  • 23

    Which of the following define the meaning of load factor?

    The ratio of average load to maximum load

  • 24

    The power customer has four circuits of 220 volts, three phase. The circuits have the maximum demand as follows: Circuit 1 = 35 Am Circuit 3 = 72 Amp Circuit 2 = 46 Amp Circuit 4 = 57 Amp The diversity factor is 1.5 the load factor is 50% and the power factor is 80%. What is the approximate kW demand of the customer?

    21 kW

  • 25

    A power olant has maximum demanf of 15 MW. The annual load factor and capacity factor are 50% and 40% respectively. Determine the reserve capacity of the plant

    3750 kW

  • 26

    The annual load duration curve of a certain power station can be considered as a straight line from 20 MW to 4 MW. To meet this load, 3 turbo- alternator units, two rated at 10 MW each and one rated 5 MW are installed. Determine the plant use factor

    48%

  • 27

    A generating station has a maximum demand of 40 MW, annual load factor of 75%, annual plant capacity factir of 65% and a plant use factor of 85%. What is the annual energy produced?

    200.9×10^6 kWh

  • 28

    Base load plats are designed to supply power at ___________

    high capital cost & low operating cost

  • 29

    Peak load plants are designed to supply power at _________

    low capital cost & high operating cost

  • 30

    A generating station has following data installed capacity = 300 MW Annual load factor = 60%, Annual capacity factor = 50%, Annual interest & depreciation = 10% Annual cost of fuel, oil etc = P90 million, capital cost = P1,000 million. What is the cost per kWh generated?

    P0.24

  • 31

    What is the meaning of heat rate of a generating unit?

    The amount of fuel energy used to produced one kWHR

  • 32

    Which of the following is the least efficient power plant?

    Coal friend

  • 33

    A diesel power plant is best suited as ________

    Stand by

  • 34

    One of the following methods of producing emf NOT yet in commercial use

    Fuel cell

  • 35

    With which of thw following is enthaply associated?

    steam

  • 36

    In a steam turbine cycle the lowest pressure occurs in the____________

    Condenser

  • 37

    Which one is essential for combustion fuel?

    all of the above

  • 38

    Which of the following is non renewable source of energy?

    nuclear

  • 39

    Which of the following element is a radioactive?

    Uranium

  • 40

    The energy of present nuclear plants comes from

    the destruction of very tiny particles released when atoms split

  • 41

    In fusion energy is produced when ________

    nuclear combines particle

  • 42

    In the list below, which one is not a type of present day nuclear power plant?

    fusion fission reactor

  • 43

    Reflecting mirrors used for exploiting solar energy in a solar power plant is ________

    heliostats

  • 44

    Of the various methods of utilizing the heat from the sun one appreas to be the most efficient so far. Which one is this?

    mirrior and tracking system

  • 45

    To produce one kWh a power plant burns 0?9 lb of coal with a heating value of 13,000 BTU per lb. What is the heat rate of the plant?

    11,700 BTU/kW-hr

  • 46

    The turbine which is normally used in a tidal power plant is ______

    reversible type

  • 47

    The following are the essential parts of a hydroelectric power station. EXCEPT

    throttle valve

  • 48

    The intake pipe to the hyrdraulic turbine from a dam is called ________

    penstock

  • 49

    The water behind the dam at a hydrielectric power plant is _______

    pondage

  • 50

    which plant can never have 100 percent load factor?

    peak load plant

  • 51

    A low utilization factor for a plant indicates that __________

    plant is used for stand by purpose only

  • 52

    During load shedding what happen

    some load are switched off

  • 53

    Estimate the average power output of a wind turbine having a blade dismter of 35 ft if the wind velocity ranges from 10 tp 39 mph?

    42.20 kW

  • 54

    A hydroelectric plant generates 100 MW at an available head of 200 m and at an overall efficiency of 75% what quantity of water ine cubic meter per second is required?

    68

  • 55

    A power plant gets water from a dam feom a height of 122.45 meters at the rate of 1,000 cubic meter per minute. If the output of the plant is 15,000 kW what is the efficiency?

    75%

  • 56

    Daytime capacity when only 300 MW pump storage plant and 600 MW Nuclear plant is operating _______

    900 MW

  • 57

    A diversity factor of 4.2 gives a savings of _________ percent in the geenrating equipment

    76

  • 58

    The current loads of four circuits are as follows Circuit No.1 = 25 Amp Circuit No.3 = 18 Amp Circuit No.2 = 38 Amp Circuit No.4 = 45 Amp

    84 Amp

  • 59

    A power plant is said to have a use factor of 48.5% and a capacity factor of 42.4%. How many hours did it operate during the year?

    7,658 hrs

  • 60

    Which of the following generating station has the minimum running cost?

    Hydro electric plant

  • 61

    The type of switchgear assembly commonly selected for use in a turbine generator power plant is ________

    Dual benchboard