    Is it necessary to remove scale and rust from the base metal ?

    yes

  • 2

    How would you lay beads when surface welding for build up work ?

    blend then together so that they form a solid layer of weld metal

  • 3

    In what position can you do surface welding with GMAW using short-circuit metal transfer ?

    all positions

  • 4

    What is the normal electrode angle when doing single-pass 1F welds ?

    45° to the joint angle

  • 5

    How is work positioned for a 1F Tee joint ?

    each member at 45° to the horizontal plane

  • 6

    Given a choice, what position should you use to achieve the most productive fillet welding ?

    1F

  • 7

    What is the recommended gun angle for the first pass of a 2F weld on 10 mm (3/8") material with three stringer bead passes specified ?

    45° to the vertical and horizontal planes

  • 8

    What type of bead is usually used for the cover pass on a 3F weld on 10 mm (3/8") material ?

    weave bead

  • 9

    What is the likely weld progression for the first pass on a 3F weld on 10 mm (3/8") material ?

    downhill

  • 10

    What joint configuration is generally used for a 1G weld with a Vee groove preparation on 10 mm (3/8") material ?

    4 mm (5/32") gap, 1.6 mm (1/16") root face

  • 11

    How many passes are generally used for a 1G weld with a Vee groove preparation on 10 mm (3/8") material using 0.9 mm (0.35") wire ?

    3 or 4 passes

  • 12

    What procedure is recommended to complete a 2G weld with a V groove preparation on 10 mm (3/8") material ?

    use stringer beads on all fill and cover passes, working from the bottom upwards

  • 13

    The number and letter combinations of 1F and 2G represent:

    the position and type of weld to be completed

  • 14

    A WPS allows minor changes in the welding voltage and amperage.

    true

  • 15

    The root pass is becoming excessively heavy as you weld pipe in the 1GR position. What corrective action should you take while welding ?

    work closer to the vertical position, progressing downhill

  • 16

    Single Vee preparation on pipe generally have an included angle within the range of:

    60° to 75°

  • 17

    On a 80 mm (3") sch. 40 pipe, what is the minimum number and length of tacks required ?

    3 tacks at 12.7 mm (1/2") long

  • 18

    What is the root gap between the test plates for a CWB 2G test weld ?

    8 mm (5/16")

  • 19

    How far are the stop/starts from the edge of the CWB 4GF test plate ?

    38 mm (1-1/2")

  • 100 official format practice questions.

    100 official format practice questions.

    Fern Hiebert · 100問 · 1年前

    100 official format practice questions.

    100 official format practice questions.

    100問 • 1年前
    Fern Hiebert

    SMAW Fillet Welds on Mild Steel

    SMAW Fillet Welds on Mild Steel

    Fern Hiebert · 25問 · 1年前

    SMAW Fillet Welds on Mild Steel

    SMAW Fillet Welds on Mild Steel

    25問 • 1年前
    Fern Hiebert

    SMAW and Oxyfuel Cutting on Mild Steel

    SMAW and Oxyfuel Cutting on Mild Steel

    Fern Hiebert · 23問 · 1年前

    SMAW and Oxyfuel Cutting on Mild Steel

    SMAW and Oxyfuel Cutting on Mild Steel

    23問 • 1年前
    Fern Hiebert

    SMAW Groove Welds on Mild Steel

    SMAW Groove Welds on Mild Steel

    Fern Hiebert · 20問 · 1年前

    SMAW Groove Welds on Mild Steel

    SMAW Groove Welds on Mild Steel

    20問 • 1年前
    Fern Hiebert

    GTAW Equipment Maintenance and troubleshooting

    GTAW Equipment Maintenance and troubleshooting

    Fern Hiebert · 31問 · 1年前

    GTAW Equipment Maintenance and troubleshooting

    GTAW Equipment Maintenance and troubleshooting

    31問 • 1年前
    Fern Hiebert

    GTAW Electrodes Filler Metals and Shielding Gases

    GTAW Electrodes Filler Metals and Shielding Gases

    Fern Hiebert · 28問 · 1年前

    GTAW Electrodes Filler Metals and Shielding Gases

    GTAW Electrodes Filler Metals and Shielding Gases

    28問 • 1年前
    Fern Hiebert

    Distortion

    Distortion

    Fern Hiebert · 23問 · 1年前

    Distortion

    Distortion

    23問 • 1年前
    Fern Hiebert

    Layout

    Layout

    Fern Hiebert · 9問 · 1年前

    Layout

    Layout

    9問 • 1年前
    Fern Hiebert

    Submerged Arc Welding (SAW)

    Submerged Arc Welding (SAW)

    Fern Hiebert · 20問 · 1年前

    Submerged Arc Welding (SAW)

    Submerged Arc Welding (SAW)

    20問 • 1年前
    Fern Hiebert

    FCAW and MCAW on Mild Steel

    FCAW and MCAW on Mild Steel

    Fern Hiebert · 13問 · 1年前

    FCAW and MCAW on Mild Steel

    FCAW and MCAW on Mild Steel

    13問 • 1年前
    Fern Hiebert

    The GTAW Process

    The GTAW Process

    Fern Hiebert · 29問 · 1年前

    The GTAW Process

    The GTAW Process

    29問 • 1年前
    Fern Hiebert

    2. 100 official format practice questions

    2. 100 official format practice questions

    Fern Hiebert · 62問 · 1年前

    2. 100 official format practice questions

    2. 100 official format practice questions

    62問 • 1年前
    Fern Hiebert

    GMAW FCAW & MCAW Groove Welds on Mild Steel

    GMAW FCAW & MCAW Groove Welds on Mild Steel

    Fern Hiebert · 8問 · 1年前

    GMAW FCAW & MCAW Groove Welds on Mild Steel

    GMAW FCAW & MCAW Groove Welds on Mild Steel

    8問 • 1年前
    Fern Hiebert

    Pattern Development

    Pattern Development

    Fern Hiebert · 15問 · 1年前

    Pattern Development

    Pattern Development

    15問 • 1年前
    Fern Hiebert

    Metallurgy for Practical Applications

    Metallurgy for Practical Applications

    Fern Hiebert · 16問 · 1年前

    Metallurgy for Practical Applications

    Metallurgy for Practical Applications

    16問 • 1年前
    Fern Hiebert

    Nickel Alloys and Clad Steels

    Nickel Alloys and Clad Steels

    Fern Hiebert · 9問 · 1年前

    Nickel Alloys and Clad Steels

    Nickel Alloys and Clad Steels

    9問 • 1年前
    Fern Hiebert

    Codes and Standards Part A & B

    Codes and Standards Part A & B

    Fern Hiebert · 31問 · 1年前

    Codes and Standards Part A & B

    Codes and Standards Part A & B

    31問 • 1年前
    Fern Hiebert

    Metal Identification

    Metal Identification

    Fern Hiebert · 32問 · 1年前

    Metal Identification

    Metal Identification

    32問 • 1年前
    Fern Hiebert

    問題一覧

  • 1

    Is it necessary to remove scale and rust from the base metal ?

    yes

  • 2

    How would you lay beads when surface welding for build up work ?

    blend then together so that they form a solid layer of weld metal

  • 3

    In what position can you do surface welding with GMAW using short-circuit metal transfer ?

    all positions

  • 4

    What is the normal electrode angle when doing single-pass 1F welds ?

    45° to the joint angle

  • 5

    How is work positioned for a 1F Tee joint ?

    each member at 45° to the horizontal plane

  • 6

    Given a choice, what position should you use to achieve the most productive fillet welding ?

    1F

  • 7

    What is the recommended gun angle for the first pass of a 2F weld on 10 mm (3/8") material with three stringer bead passes specified ?

    45° to the vertical and horizontal planes

  • 8

    What type of bead is usually used for the cover pass on a 3F weld on 10 mm (3/8") material ?

    weave bead

  • 9

    What is the likely weld progression for the first pass on a 3F weld on 10 mm (3/8") material ?

    downhill

  • 10

    What joint configuration is generally used for a 1G weld with a Vee groove preparation on 10 mm (3/8") material ?

    4 mm (5/32") gap, 1.6 mm (1/16") root face

  • 11

    How many passes are generally used for a 1G weld with a Vee groove preparation on 10 mm (3/8") material using 0.9 mm (0.35") wire ?

    3 or 4 passes

  • 12

    What procedure is recommended to complete a 2G weld with a V groove preparation on 10 mm (3/8") material ?

    use stringer beads on all fill and cover passes, working from the bottom upwards

  • 13

    The number and letter combinations of 1F and 2G represent:

    the position and type of weld to be completed

  • 14

    A WPS allows minor changes in the welding voltage and amperage.

    true

  • 15

    The root pass is becoming excessively heavy as you weld pipe in the 1GR position. What corrective action should you take while welding ?

    work closer to the vertical position, progressing downhill

  • 16

    Single Vee preparation on pipe generally have an included angle within the range of:

    60° to 75°

  • 17

    On a 80 mm (3") sch. 40 pipe, what is the minimum number and length of tacks required ?

    3 tacks at 12.7 mm (1/2") long

  • 18

    What is the root gap between the test plates for a CWB 2G test weld ?

    8 mm (5/16")

  • 19

    How far are the stop/starts from the edge of the CWB 4GF test plate ?

    38 mm (1-1/2")