Question
Strategic Capacity Planning for Products and Services
Standard Elemental Times
Total Quality Management
Process Selection and Facility Layout
Lecture 5
Skip
Question
The upper limit or ceiling on the load that an operating unit can handle
Capacity
Lecture 5
Continuos Improvement
Cost Volume Analysis
Skip
Question
To achieve a match between the long-term supply capabilities of an organization and the predicted level of long-term demand
Demand Management Strategies
Goal
Continuos Improvement
Process Selection and Facility Layout
Skip
Question
The maximum output rate or service capacity an operation, process, or facility is designed for
Design Capacity
Transportation Problem
Capacity
Cycle Time
Skip
Question
Design capacity minus allowances such as personal time and maintenance
Effective Capacity
Constraint
Job Enrichment
Specialization
Skip
Question
Extra capacity used to offset demand uncertainty
Center of Gravity Method
Capacity Cushion
Continuos Improvement
Flow process chart
Skip
Question
Strategies used to offset capacity limitations and that are intended to achieve a closer match between supply and demand
Goal
Predetermined Time Standard
Center of Gravity Method
Demand Management Strategies
Skip
Question
An operation in a sequence of operations whose capacity is lower than that of the other operations
Define Measure Analyze Improve Control
Cost Volume Analysis
Constraint
Bottleneck Operation
Skip
Question
If output rate is less than the optimal level, increasing the output rate results in decreasing average per unit costs
Economies of Scale
Predetermined Time Standard
Goal
Break Even Point
Skip
Question
If the output rate is more than the optimal level, increasing the output rate results in increasing average per unit costs
Cycle Time
Diseconomies of Scale
Effective Capacity
Worker machine chart
Skip
OM 56789
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
OM 1234
OM 1234
Umak Student · 69 questions · 2 y agoOM 1234
OM 1234
69 questions • 2 y agoOM 10 11 12 13 14
OM 10 11 12 13 14
Umak Student · 25 questions · 2 y agoOM 10 11 12 13 14
OM 10 11 12 13 14
25 questions • 2 y agoOM 15 16 17 18
OM 15 16 17 18
Umak Student · 41 questions · 2 y agoOM 15 16 17 18
OM 15 16 17 18
41 questions • 2 y agolecture
lecture
Umak Student · 18 questions · 2 y agolecture
lecture
18 questions • 2 y agozzASIAN
zzASIAN
Umak Student · 12 questions · 2 y agozzASIAN
zzASIAN
12 questions • 2 y agoQuestion list
1
Lecture 5
2
Capacity
3
Goal
4
Design Capacity
5
Effective Capacity
6
Capacity Cushion
7
Demand Management Strategies
8
Bottleneck Operation
9
Economies of Scale
10
Diseconomies of Scale
11
Constraint
12
Cost Volume Analysis
13
Break Even Point
14
Process Selection and Facility Layout
15
Basic Objective
16
Product Layout
17
Fixed Position Layout
18
Line Balancing
19
Cycle Time
20
Work Design and Measurement
21
Specialization
22
Job Enlargement
23
Job Rotation
24
Job Enrichment
25
Flow process chart
26
Worker machine chart
27
Stopwatch Time Study
28
Standard Elemental Times
29
Predetermined Time Standard
30
Work Sampling
31
Location Planning and Analysis
32
Transportation Problem
33
Center of Gravity Method
34
Management of Quality
35
Total Quality Management
36
Continuos Improvement
37
Kaizen
38
Plan Do Study Act
39
Define Measure Analyze Improve Control