OM 10 11 12 13 14

25 questions • 2024-06-07
Umak Student
Report

Question

Lecture 10

  • Kanban

  • Safety Stock

  • Quality Control

  • Load Reports

  • Skip

Question

Inspection of lots before/after production

  • Radio frequency identification (RFID) tags

  • Load Reports

  • Type I error

  • Acceptance Sampling

  • Skip

Question

Inspection and corrective action during production

  • Acceptance Sampling

  • Process Control

  • Takt Time

  • Aggregriate Planning

  • Skip

Question

Quality built into the process

  • Inventory Management

  • Continuous improvement

  • Type II error

  • Periodic System

  • Skip

Question

Concluding a process is not in control when it actually is.

  • Universal product code (UPC)

  • Two bin system

  • Type I error

  • Load Reports

  • Skip

Question

Concluding a process is in control when it is not.

  • Value Stream Mapping

  • Type I error

  • Type II error

  • Just in Time (JIT)

  • Skip

Question

Lecture 11

  • Kanban

  • Two bin system

  • Aggregate Planning and Master Scheduling

  • Value Stream Mapping

  • Skip

Question

Intermediate-range capacity planning that typically covers a time horizon of 2 to 18 months

  • Just-in-Time Lean Operations Maintenance

  • Two bin system

  • Takt Time

  • Aggregriate Planning

  • Skip

Question

Lecture 12

  • Type II error

  • Perpetual Inventory System

  • Material Requirement Planning (MRP) and Enterprise Resource Planning (ERP)

  • Process Control

  • Skip

Question

A computer-based information system that translates master schedule requirements for end items into time-phased requirements for subassemblies, components, and raw materials.

  • Kanban

  • Material requirements planning (MRP)

  • Inventory Management

  • Aggregate Planning and Master Scheduling

  • Skip

OM 10 11 12 13 14

TestMaker

Score

0 / 10

Correct rate

0%

Correct: 0

Incorrect: 0

Unanswered: 10

 
ankimaker.com

Question list

  • 1

    Lecture 10

    Quality Control

  • 2

    Inspection of lots before/after production

    Acceptance Sampling

  • 3

    Inspection and corrective action during production

    Process Control

  • 4

    Quality built into the process

    Continuous improvement

  • 5

    Concluding a process is not in control when it actually is.

    Type I error

  • 6

    Concluding a process is in control when it is not.

    Type II error

  • 7

    Lecture 11

    Aggregate Planning and Master Scheduling

  • 8

    Intermediate-range capacity planning that typically covers a time horizon of 2 to 18 months

    Aggregriate Planning

  • 9

    Lecture 12

    Material Requirement Planning (MRP) and Enterprise Resource Planning (ERP)

  • 10

    A computer-based information system that translates master schedule requirements for end items into time-phased requirements for subassemblies, components, and raw materials.

    Material requirements planning (MRP)

  • 11

    MRP

    Material requirements planning (MRP)

  • 12

    Department or work center reports that compare known and expected future capacity requirements with projected capacity availability.

    Load Reports

  • 13

    Lecture 13

    Inventory Management

  • 14

    Physical count of items in inventory made at periodic intervals

    Periodic System

  • 15

    System that keeps track of removals from inventory continuously, thus monitoring current levels of each item

    Perpetual Inventory System

  • 16

    Two containers of inventory; reorder when the first is empty

    Two bin system

  • 17

    Bar code printed on a label that has information about the item to which it is attached

    Universal product code (UPC)

  • 18

    A technology that uses radio waves to identify objects, such as goods, in supply chains

    Radio frequency identification (RFID) tags

  • 19

    Stock that is held in excess of expected demand due to variable demand and/or lead time

    Safety Stock

  • 20

    Lecture 14

    Just-in-Time Lean Operations Maintenance

  • 21

    A flexible system of operation that uses considerably less resources than a traditional system

    Lean Operation

  • 22

    highly coordinated processing system in which goods move through the system, and services are performed, just as they are needed

    Just in Time (JIT)

  • 23

    The cycle time needed to match customer demand for final product

    Takt Time

  • 24

    Card or other device that communicates demand for work or materials from the preceding station

    Kanban

  • 25

    A visual tool to systematically examine the flows of materials and information

    Value Stream Mapping