Question
2.1 What communication must you have with the driver on a 225 before commencing train preparation
Question
2.2 What are the requirements with regards to emergency supplies of bottled water and snacks?
Question
2.3 Where are the emergency tool cupboards located on 225 and azuma?
Question
2.4 What must you do if you come across a sytsrem or equipment fault whilst carrying out train preparation?
Question
2.5 What is the purpose of full door test on a 225? How would you perform one?
Question
2.7 When would you carry out a full door test?
Question
2.8 Why is it important to start with the ‘off side’ doors when completing a door test?
Question
2.9 Why must you make an announcement to make those on board aware that you are about to carry out a door test?
Question
2.10 When a train has been on a maintenance depot, what type of faults can prevent it entering into service?
Question
2.11 What are your responsibilities in relation to coach emergency boxes?
Rules element 2 preparing trains for duty
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
Question list
1
2.1 What communication must you have with the driver on a 225 before commencing train preparationIf 225, check pantograph has been raised and theres power to the train. Don’t start door test until driver has conformed they have built up enough aie in the system and completed a brake test. If required request the driver obtains a line block on any adjacent running lines.
2
2.2 What are the requirements with regards to emergency supplies of bottled water and snacks?It is the Tms responsbility to make sure emergency water and snacks are checked before departure and orders made where there is any missing or used
3
2.3 Where are the emergency tool cupboards located on 225 and azuma?225 – DVT, Tms office and outside the Tms office, carriages on top shelf Azuma - Emergency cupboarsd opposite and behind UATs, driving cabs
4
2.4 What must you do if you come across a sytsrem or equipment fault whilst carrying out train preparation?Inform maintence controller straight away
5
2.5 What is the purpose of full door test on a 225? How would you perform one?To determine the doors are working correctly and retract when encountering and obstruction, releasing on the right side, the lights illumiate and they should and the hustle alarms sound as they should
6
2.7 When would you carry out a full door test?It should be detailed on diagram or a specific request from maintenace controller or when no DOO slip is available at all on the train
7
2.8 Why is it important to start with the ‘off side’ doors when completing a door test?If you get a wrong side release its not as dangerous
8
2.9 Why must you make an announcement to make those on board aware that you are about to carry out a door test?So they know to stay clear of the doors and not use them while you carry out the test
9
2.10 When a train has been on a maintenance depot, what type of faults can prevent it entering into service?Brakes isolated, doors locked out of use, broken window, missing safety equipment
10
2.11 What are your responsibilities in relation to coach emergency boxes?Ensure it is sealed and if not then report it