HIST 4

24 questions • 2024-09-18
KRYZL CHARYNE MICU
Report

Question

floor sills run around the outermost periphery of the soleras

Answer

Question

house post

Answer

Question

connecte the bottom end of rafters

Answer

Question

rafters

Answer

Question

bamboo strips tied on to the rafters with rattan vines

Answer

Question

ridge pole

Answer

Question

beam laid over yawi at 90 deg

Answer

Question

nipa shingles made by stripping leaves

Answer

Question

slatted floor made of rattan pr bamboo strips

Answer

Question

poles which criss the rafters

Answer

HIST 4

TestMaker

Score

0 / 10

Correct rate

0%

Correct: 0

Incorrect: 0

Unanswered: 10

 
ankimaker.com

Question list

  • 1

    floor sills run around the outermost periphery of the soleras

    gililan

  • 2

    house post

    halige

  • 3

    connecte the bottom end of rafters

    kahab-an

  • 4

    rafters

    kilo

  • 5

    bamboo strips tied on to the rafters with rattan vines

    palatpat

  • 6

    ridge pole

    palupo

  • 7

    beam laid over yawi at 90 deg

    patukutan

  • 8

    nipa shingles made by stripping leaves

    pawid

  • 9

    slatted floor made of rattan pr bamboo strips

    sahig

  • 10

    poles which criss the rafters

    sikang

  • 11

    floor joists are laid

    soleras

  • 12

    wooden peg over a natrow bamboo slats

    tarugo

  • 13

    master beam which runs from one post to the other

    yawi

  • 14

    living room

    bulwagan

  • 15

    sleeping area

    silid

  • 16

    food is prepared

    paglutuan

  • 17

    consists of table river stones and a shoe shaped stove

    dapogan

  • 18

    banguetra pots

    bangahan

  • 19

    porch which opens from paglutuan

    batalan

  • 20

    lower part pf the house

    silong

  • 21

    separate storehouse on stilts

    kamalig

  • 22

    traditional house of kalinga

    foruy

  • 23

    dwelling of wealthy bontoc

    fayo

  • 24

    poor man's dwelling bontoc

    katfuyong