Question
Federal buildings must have clear circulation systems.
Question
shall be used to integrate building interiors to allow more future serviceability, particularly for buildings that will experience extensive reconfiguration through their life span. A building design shall follow the prescribed planning grid dimension unless the designer can show long term efficiencies using another dimension. Following a standard dimension will allow GSA to maintain standard replacement parts to service the building.shall be used to integrate building interiors to allow more future serviceability, particularly for buildings that will experience extensive reconfiguration through their life span. A building design shall follow the prescribed planning grid dimension unless the designer can show long term efficiencies using another dimension. Following a standard dimension will allow GSA to maintain standard replacement parts to service the building.
Question
A total integration of all building systems will provide for current operations as well as for future changes.
Question
Three options exist for delivering power and communications to general office areas: raised access floor, cellular floor duct, and under-floor duct encased in concrete deck.
Question
Three options exist for delivering power and communications to general office areas:
Question
incorporated into all new construction where office functions will take place. Permanent corridors can be exempted from this requirement.
Question
distribution systems are preferred in office applications with raised floors, eliminating ceiling ductwork and facilitating personal climate control systems
Question
usable area occupied by a tenant plus their proportion of the floor common areas.
Question
Building R/U ratio is the factor used to distribute building common areas to all tenants on a prorated basis.
Question
sum of the floor rentable areas. It is also equal to the gross measured area of the building minus vertical penetrations.
des5
Score
0 / 10
Correct rate
0%
Correct: 0
Incorrect: 0
Unanswered: 10
Question list
1
Federal buildings must have clear circulation systems.building circulation
2
shall be used to integrate building interiors to allow more future serviceability, particularly for buildings that will experience extensive reconfiguration through their life span. A building design shall follow the prescribed planning grid dimension unless the designer can show long term efficiencies using another dimension. Following a standard dimension will allow GSA to maintain standard replacement parts to service the building.shall be used to integrate building interiors to allow more future serviceability, particularly for buildings that will experience extensive reconfiguration through their life span. A building design shall follow the prescribed planning grid dimension unless the designer can show long term efficiencies using another dimension. Following a standard dimension will allow GSA to maintain standard replacement parts to service the building.planning grids
3
A total integration of all building systems will provide for current operations as well as for future changes.technology infrastructure
4
Three options exist for delivering power and communications to general office areas: raised access floor, cellular floor duct, and under-floor duct encased in concrete deck.horizontal pathway systems
5
Three options exist for delivering power and communications to general office areas:raf cfd ufd
6
incorporated into all new construction where office functions will take place. Permanent corridors can be exempted from this requirement.access floors
7
distribution systems are preferred in office applications with raised floors, eliminating ceiling ductwork and facilitating personal climate control systemsfloor air plenum
8
usable area occupied by a tenant plus their proportion of the floor common areas.basic rentable area
9
Building R/U ratio is the factor used to distribute building common areas to all tenants on a prorated basis.building r/u ratio
10
sum of the floor rentable areas. It is also equal to the gross measured area of the building minus vertical penetrations.buildable rental area
11
includes toilets/washrooms, janitorial closets, electrical rooms, telephone rooms, mechanical rooms, elevator lobbies, and public corridors that are available primarily for the joint use on that floorfloor common area
12
Gross building area is the total constructed area of a building.constructed area
13
total area within the building, minus the exterior wall.gross measured area
14
an in-depth analysis of how physical space is used in structures. It considers the purpose of spaces and who will use them.space planning
15
fourth dimensionhuman attitude
16
Architectural designs must be integrated with all project design disciplines in order to optimize building performance and aesthetics.integrated
17
The natural setting of the site, its contours and vegetation shall be viewed as assets to be preserved and woven into the design as much as possible.environmental sensitivity
18
It is important to ensure that the design including the space allocation supports quality-based performance measures for customer satisfaction, energy consumption, and reduced operations and maintenance.performance measures and functional objectives
19
In case of a project in the urban centers, facility design and orientation should be consistent with existing and planned development patterns and nearby usesurban context
20
Planning for cores must consider the depth of the occupiable space established by the core and exterior walls. The optimum depth of the occupiable space (the space between core and window wall) in an office building is approximately 12,000 mm (40 feet) for providing access to daylight.basic configurations
21
In buildings with large floor plates, not all core elements need to be placed at each core location. How often each element needs to be repeated is governed by occupant needs and the following maximum radii and distances:placement of core elements
22
usable area of a structure that is directly served by permanent public lobbies or has direct access from outside.store area
23
actual area the agency occupies in a tenant suite measured in square meters. It is the office area, store area or building common area.usable area