The operator of each vessel subject to the pollution regulations is NOT required to keep written records of __________.
cargoes carried and dates delivered, including destinations
2
An ocean going ship of 4000 gross tons must be fitted with a standard discharge shore connection for the discharge of oily wastes to a reception facility. The dimensions for the connection are specified in the Pollution Prevention Regulations under Part _
155
3
An ocean going ship of 4000 gross tons must be fitted with a standard discharge shore connection for the discharge of oily wastes to a reception facility. The dimensions for the connection are specified in the Pollution Prevention Regulations under Part _
155
4
An ocean going ship of over 400 gross tons must be fitted with a standard discharge shore connection. What size bolt circle diameter is required for this shore connection to transfer oily ballast to a shore side reception facility?
183 mm
5
Pollution Prevention Regulations state that no person may transfer oil to or from a vessel unless _____________.
hoses are supported so that couplings have no strain on them
6
According to regulations, when loading, or discharging oil in bulk at a dock, which of the following signals must be displayed?
A red flag (day), red light (night)
7
A shipboard oil pollution emergency plan is required of ______________.
an oil tanker of 150 gross tons or above, or other ship of 400 gross tons or above
8
Shipboard oil pollution emergency plans must be reviewed ___________.
annually by the owner and submit a letter to the Coast Guard within one month of the anniversary date of the plan approval
9
Coast Guard Regulations require the emergency bilge system to _____.
be independent of the main bilge system
10
Coast Guard regulations require a shipboard oil pollution emergency plan to be reviewed _____________.
annually only
11
The term arrival ballast refers to ___________.
clean ballast
12
Water ballast placed in a tank that has been crude oil washed, but not water rinsed, shall be regarded as ________
dirty ballast
13
Regulations, state that ocean going ships of 400 gross tons and above must be fitted with a standard discharge shore connection for the discharge of oily waste from machinery space bilges to reception facilities. The flange of this discharge connection mu
suitable for a service pressure of 6 kg/cm2
14
In an oil pumping operation where pumping connections are made up of flanged hoses the weakest link is the _________.
hose
15
The term segregated ballast is defined in the Pollution Prevention Regulations as ballast water introduced into a/an ____________.
tank that is completely separated from the cargo oil and fuel oil systems
16
Pollution Prevention Regulations require at on the completion of oil transfer operations all _____________.
valves used during transfer shall be closed
17
Remote control for stopping machinery driving fuel oil service pumps is required. These controls shall be _______.
protected against accidental operation
18
According to Regulations (46 CFR), no vessel can come alongside or remain alongside a tank vessel while it is loading A, B, or C grade cargo without having the permission of the ____________.
officer‐in‐charge of the vessel which is loading
19
To avoid oil from discharge into the sea when ballasting _______________.
start the cargo p/p then close sea suction valve
20
Which of the following liquids can ordinarily be discharge overboard without being processed through an oily water separator?
Segregated ballast
21
No person may transfer oil to or from a vessel unless the person in charge _____________.
is in the immediate vicinity and immediately available to the oil transfer personnel
22
When completing the ballasting operation of a contaminated tank, which of the following problems must be guarded against?
Back flow of contaminated water
23
To prevent oil from escaping into the sea when ballasting through the cargo piping system, you should FIRST _________.
start the cargo pump, then open sea suction valves
24
During topping off of bunker tanks, the loading rate must be personally supervised by the ____________.
person‐in‐charge
25
The minimum number of bolts necessary for a standard ANSI oil transfer hose temporary flange coupling (eight bolt hole flange) is ____________________.
four bolts
26
According to Pollution Prevention Regulations, when may a person serve as the person‐in‐charge of both a vessel and a facility during oil transfer operations?
When authorized by the Captain of the Port.
27
Which significant combustion elements of fuel oil is a major source of air pollution/
sulfur
28
Which list is not required to be provided as part of the appendices of the Shipboard Oil Pollution Emergency Plan?
A list of personnel duty assignments
29
Why is it important for fuel oil tank not to be topped off when loading cold oil?
The change in its specific volume when heated may cause an overflow
30
The Shipboard Oil Pollution Emergency Plan must include __________.
an explanation and purpose of the plan
31
Before a vessel can pump oily water within a Special Area, it has to comply with the following conditions except_________.
it must be more than 12 miles from the nearest coast
32
If you observe any situation which presents a safety or pollution hazard during fuel transfer operations which action should you take first?
Shut down the operation.
33
To whom is the first report rendered in the oil pollution contingency plan of the vessel?
Port authorities
34
On a tanker ship, sanitary inspections of the crew's quarters are the responsibility of the __________.
Master and Chief Engineer
35
Among other restrictions, an oil tanker may not discharge an oily mixture into the sea from a cargo tank, slop tank, or cargo pump room bilge unless the vessel is_________ .
discharging at an instantaneous rate of oil content not exceeding 30 liters per nautical mile
36
Under the Pollution Regulations, when you dump garbage in to the sea you must __________.
keep a record for two years
37
When amendments are made to the Shipboard Oil Pollution Emergency Plan, the revisions must be submitted to the administration __________.
and cannot be implemented without approval
38
Which is a mandatory section of the shipboard Oil Pollution Emergency Plan?
Reporting requirements
39
Which is not a mandatory part of the Shipboard Oil Pollution Emergency Plan?
Diagrams
40
Pollution regulation requires that each scupper in an enclosed deck area have a __________.
mechanical means of closing
41
According to the Coast Guard Pollution Prevention Regulations (33 CFR), what is the minimum number of bolts required in a temporarily connected standard ANSI coupling?
4 bolts
42
Pollution Prevention Regulations, state that no person may transfer oil to or from a vessel unless _____________.
all parts of the transfer system have been properly lined up
43
According to the Pollution Prevention Regulations, the declaration of inspection is the ____________.
document signed by vessel and shore facility persons‐in‐charge declaring that all transfer requirements have been met
44
According to the Pollution Prevention Regulations, who makes the final decision of when oil transfer may begin?
The designated personin‐charge
45
According to Pollution Prevention Regulations, if a cargo hose shows a small leak in its fabric, you may transfer oil after______________.
the hose is replaced
46
According to Pollution Prevention Regulations (33 CFR), the minimum number of bolts permitted in an ANSI standard flange on an oil hose is_______________.
four
47
The standard outside diameter pipelines to enable pipes of reception facilities to be connected with the ships discharge pipelines for residues from machinery bilges should be_________
215 mm
48
Plastic material may be discharged overboard from a vessel if it is __________.
Prohibited to throw overboard
49
One of the requirements for an oil tanker operating with Dedicated Clean Ballast shall be that it is equipped with_________.
An oil content meter
50
Why is it important for fuel oil tank not to be topped off when loading cold oil?
The change in its specific volume when heated may cause an overflow