問題一覧
1
What size are the Sprinkler pumps?
55Kw
2
What KVA are the Generators?
1000 KVA
3
What size are the kitchen water tanks?
200 L
4
What size are the Blended tanks?
84000 L
5
What size are the Drinking tanks?
4000 L
6
What size are the sprinkler tanks?
130000 L
7
What does UPS 1A and B feed?
Data centre
8
What does UPS 2A and B feed?
Traders Floor and IDF rooms on all floors
9
What do level 8 Calorifiers feed?
Kitchen
10
What does level 9 calorifier feed?
All showers and WHB
11
What AHU’s supply the South side of the building
1 & 2
12
What AHU’s supply the North side of the building?
3 & 4
13
What does AHU 5 supply?
Basement
14
What does AHU 6 supply
LG Changing rooms
15
What does AHU 7 supply?
Entrance
16
What does AHU 8 supply?
Building management suite
17
What does AHU 9 supply
Kitchen
18
How many ACU’s are there?
4
19
What AHU’s have extracts?
1,2,3,4
20
How many extract fans are there in the building? (Excluding smoke extracts and AHU extracts)
3
21
What Riser numbers are Tenant electrical risers?
17,18,19
22
What number Risers are Life safety Electrical risers?
26,27
23
What floors ALWAYS evacuate in a fire alarm (real)?
Roof, Basement floor where call point or smoke head was activated, and 1 above and below
24
What size are the Chillers (Water cooled)
800 Kw
25
What size are the Critical Chillers (Air cooled)
770 Kw
26
What size are the generators
800 Kw
27
What should the sprinkler pumps be on low?
6.2
28
What should the sprinkler pumps be on high?
12.5
29
Where are the BMS Outstations
Risers 17/18
30
How is level 9 calorifier heated?
Gas
31
How are the level 8 Calorifiers heated?
Heating element (electrical)
32
What size is UPS 1a and b?
300 Kw
33
What size is UPS 2A and B?
400 Kw
34
What risers are the Calorifiers in?
31
35
what riser are the Calorifiers in?
31
36
What is the CRAH code?
1490
37
After the first smoke head damper activation how many fans will be running?
2