AIRLAW PT 2
問題一覧
1
Aircraft listing
2
Compliance
3
At least equal to its original or properly altered condition
4
When performing an inspection required under part 91, 125, or 135
5
Control surface movements
6
14 CFR Part 21
7
AC 43. 13-2A
8
Aircraft listing
9
Propeller type Certificate Data Sheets
10
Both No.1 and No. 2 are correct
11
1,2 and 3
12
is transferred with the aircraft
13
Appliance major repair
14
Modification
15
Airframe major modification
16
Aircraft major alteration
17
Revocation
18
Preventive maintenance
19
Powerplant major modification/alteration
20
All of the above
21
Licensed mechanic/owner
22
The form and manner prescribed by the CAAP
23
The date of the inspection and aircraft time in service
24
Preventive maintenance
25
Powerplant major repair
26
Airframe minor repair techniques
27
Removal, installation and repair of landing gear tires
28
It does not require an STC when used in alteration
29
The repair of damaged areas in the plywood stressed covering (6) inches
30
Appliance major modification
31
Disassembly of float type carburetor
32
Total service of the airframe
33
All of the above
34
PCAR Part 6
35
An appropriate licensed aircraft mechanic
36
Wing and control surface fairings
37
48 hours
38
The registered operator
39
All of the above
40
Appliance minor alteration
41
Return to service
42
If necessary to reach a place at which the inspection can be done
43
An airframe major repair
44
Powerplant major repair
45
15 to 30 days suspension
46
10 hrs
47
90 days
48
Airframe minor repair
49
Preventive maintenance
50
All of the above
51
Airframe major repair
52
Powerplant major modification
53
Powerplant major repair
54
Powerplant major repair
55
30 to 60 days suspension
56
Removal installation repair of landing gears
57
Appliance major repair
58
Preventive maintenance
59
An airframe minor alteration
60
Airframe major alteration
61
Strengthening or reinforcing the fuselage longeron
62
If necessary to reach a place at which the inspection can be accomplished, but not to exceed 10 flight hours
63
Make of aircraft, model, serial number, nationality and registration
64
Make of aircraft, model, serial number, nationality and registration
65
An airframe minor repair
66
Airframe minor alterations
67
Any and all kinds of booms, landing gear, empennages, fairing or control of fuselage, booms empennages, nacelles, fairing, cowlings, control surfaces
68
Repairing dents, cuts, and small cracks on wooden propeller
69
A private pilot licensed
70
A repair
71
Direct supervision
72
A jointer
73
All of the above
74
Aircraft major alteration
75
An appropriate licensed aircraft mechanic
76
Appliance minor alteration
77
Powerplant Major Modification
78
Maintenance Release
79
Powerplant Major Repair
80
Certified repair station of the instrument
81
Licensed Aircraft Maintenance/Mechanic
82
Rebuild
83
Line Maintenance Manager
84
All of the above
85
State of Design
86
7 Consecutive days
87
PCAR Part 5 (Airworthiness)
88
Propeller Major Modification
89
Appliance Major Repair
HUMAN PERFORMANCE
HUMAN PERFORMANCE
Karl Nadera · 83問 · 2年前HUMAN PERFORMANCE
HUMAN PERFORMANCE
83問 • 2年前AIRLAW
AIRLAW
Karl Nadera · 100問 · 2年前AIRLAW
AIRLAW
100問 • 2年前NATSCI
NATSCI
Karl Nadera · 100問 · 2年前NATSCI
NATSCI
100問 • 2年前NATSCI PT2
NATSCI PT2
Karl Nadera · 82問 · 2年前NATSCI PT2
NATSCI PT2
82問 • 2年前問題一覧
1
Aircraft listing
2
Compliance
3
At least equal to its original or properly altered condition
4
When performing an inspection required under part 91, 125, or 135
5
Control surface movements
6
14 CFR Part 21
7
AC 43. 13-2A
8
Aircraft listing
9
Propeller type Certificate Data Sheets
10
Both No.1 and No. 2 are correct
11
1,2 and 3
12
is transferred with the aircraft
13
Appliance major repair
14
Modification
15
Airframe major modification
16
Aircraft major alteration
17
Revocation
18
Preventive maintenance
19
Powerplant major modification/alteration
20
All of the above
21
Licensed mechanic/owner
22
The form and manner prescribed by the CAAP
23
The date of the inspection and aircraft time in service
24
Preventive maintenance
25
Powerplant major repair
26
Airframe minor repair techniques
27
Removal, installation and repair of landing gear tires
28
It does not require an STC when used in alteration
29
The repair of damaged areas in the plywood stressed covering (6) inches
30
Appliance major modification
31
Disassembly of float type carburetor
32
Total service of the airframe
33
All of the above
34
PCAR Part 6
35
An appropriate licensed aircraft mechanic
36
Wing and control surface fairings
37
48 hours
38
The registered operator
39
All of the above
40
Appliance minor alteration
41
Return to service
42
If necessary to reach a place at which the inspection can be done
43
An airframe major repair
44
Powerplant major repair
45
15 to 30 days suspension
46
10 hrs
47
90 days
48
Airframe minor repair
49
Preventive maintenance
50
All of the above
51
Airframe major repair
52
Powerplant major modification
53
Powerplant major repair
54
Powerplant major repair
55
30 to 60 days suspension
56
Removal installation repair of landing gears
57
Appliance major repair
58
Preventive maintenance
59
An airframe minor alteration
60
Airframe major alteration
61
Strengthening or reinforcing the fuselage longeron
62
If necessary to reach a place at which the inspection can be accomplished, but not to exceed 10 flight hours
63
Make of aircraft, model, serial number, nationality and registration
64
Make of aircraft, model, serial number, nationality and registration
65
An airframe minor repair
66
Airframe minor alterations
67
Any and all kinds of booms, landing gear, empennages, fairing or control of fuselage, booms empennages, nacelles, fairing, cowlings, control surfaces
68
Repairing dents, cuts, and small cracks on wooden propeller
69
A private pilot licensed
70
A repair
71
Direct supervision
72
A jointer
73
All of the above
74
Aircraft major alteration
75
An appropriate licensed aircraft mechanic
76
Appliance minor alteration
77
Powerplant Major Modification
78
Maintenance Release
79
Powerplant Major Repair
80
Certified repair station of the instrument
81
Licensed Aircraft Maintenance/Mechanic
82
Rebuild
83
Line Maintenance Manager
84
All of the above
85
State of Design
86
7 Consecutive days
87
PCAR Part 5 (Airworthiness)
88
Propeller Major Modification
89
Appliance Major Repair