Post Test 1
問題一覧
1
what is the exact required measurement for shallow foundations
3 meters
2
give an example of an excavator mounted attachment
fork
3
which of the following is part of the post construction phase
project evaluation
4
what is the main function of earthmoving equipment in construction
to move and grade soil and rock
5
what is the tagalog term for rollers in compaction equipment
pison
6
what equipment is used to guide and install pukes for foundation
driver, pile vibratory hydraulic driven
7
the preliminary phase of the project development cycle. it involves recognizing the need for a construction project and defining its scope
identification
8
identifying and signing necessary resources, such as personnel, equipment, and materials
resource allocation
9
its the relationship between the function a building element provides and the overall cost to achieve that function. it aims to deliver the best possible outcomes for all stakeholders
value
10
during the evaluation phase of a construction project, which of the following activities is most crucial?
conducting a post- construction review to assess project performance and identify lessons learned
11
what soil test use to measure the amount of water presenter in the soil
moisture content testing
12
how to determine the shallow foundations
close to earth's surface, about 3 meters, cheaper, primary use is to transfer loads, smaller buildings, lighter loads
13
which of the following is a type of compaction equipment
static roller
14
what type of lifting equipment is used to move materials vertically on a construction site
tower crane
15
it is a pulley device used to guide and support cables and wires
stringing block
16
it is a revolving drum tool that is used to completely mix mortar, concrete, and other construction materials into an even mixture
drum mixer
17
this cycle ensures that projects are systematically and efficiently managed from start to finish
project development cycle
18
what type of concrete is sprayed into surfaces at high velocity using a hose? it is commonly used for applications such as tunnel linings, retaining walls, and swimming pools, providing strong adhesion and quick setting properties
shotcrete concrete
19
what is the best period of time to fully cure concrete
28 days
20
what concrete class is often on the road, especially when only a short period is given to finish the project?
Class 30 concrete
21
provide 1 of the examples of lifting equipments in construction
Hoist and Tower Crane
22
it is a cornerstone concept in construction project management. it portrays the three essential constrains that influence every construction project
Dempster's Triangle
23
in the context of a construction project, which of the following is the first step in the implementation phase
developing detailed blueprints and project plans
24
when implementing a new features in a software allocation, which of the following steps is typically the first to be completed
designing the features architecture and planning is integration