ログイン

Post Test 1

Post Test 1
24問 • 1年前
  • Frank Al Jawf Lomboy
  • 通報

    問題一覧

  • 1

    what is the exact required measurement for shallow foundations

    3 meters

  • 2

    give an example of an excavator mounted attachment

    fork

  • 3

    which of the following is part of the post construction phase

    project evaluation

  • 4

    what is the main function of earthmoving equipment in construction

    to move and grade soil and rock

  • 5

    what is the tagalog term for rollers in compaction equipment

    pison

  • 6

    what equipment is used to guide and install pukes for foundation

    driver, pile vibratory hydraulic driven

  • 7

    the preliminary phase of the project development cycle. it involves recognizing the need for a construction project and defining its scope

    identification

  • 8

    identifying and signing necessary resources, such as personnel, equipment, and materials

    resource allocation

  • 9

    its the relationship between the function a building element provides and the overall cost to achieve that function. it aims to deliver the best possible outcomes for all stakeholders

    value

  • 10

    during the evaluation phase of a construction project, which of the following activities is most crucial?

    conducting a post- construction review to assess project performance and identify lessons learned

  • 11

    what soil test use to measure the amount of water presenter in the soil

    moisture content testing

  • 12

    how to determine the shallow foundations

    close to earth's surface, about 3 meters, cheaper, primary use is to transfer loads, smaller buildings, lighter loads

  • 13

    which of the following is a type of compaction equipment

    static roller

  • 14

    what type of lifting equipment is used to move materials vertically on a construction site

    tower crane

  • 15

    it is a pulley device used to guide and support cables and wires

    stringing block

  • 16

    it is a revolving drum tool that is used to completely mix mortar, concrete, and other construction materials into an even mixture

    drum mixer

  • 17

    this cycle ensures that projects are systematically and efficiently managed from start to finish

    project development cycle

  • 18

    what type of concrete is sprayed into surfaces at high velocity using a hose? it is commonly used for applications such as tunnel linings, retaining walls, and swimming pools, providing strong adhesion and quick setting properties

    shotcrete concrete

  • 19

    what is the best period of time to fully cure concrete

    28 days

  • 20

    what concrete class is often on the road, especially when only a short period is given to finish the project?

    Class 30 concrete

  • 21

    provide 1 of the examples of lifting equipments in construction

    Hoist and Tower Crane

  • 22

    it is a cornerstone concept in construction project management. it portrays the three essential constrains that influence every construction project

    Dempster's Triangle

  • 23

    in the context of a construction project, which of the following is the first step in the implementation phase

    developing detailed blueprints and project plans

  • 24

    when implementing a new features in a software allocation, which of the following steps is typically the first to be completed

    designing the features architecture and planning is integration

  • M3Q

    M3Q

    Frank Al Jawf Lomboy · 60問 · 2年前

    M3Q

    M3Q

    60問 • 2年前
    Frank Al Jawf Lomboy

    問題一覧

  • 1

    what is the exact required measurement for shallow foundations

    3 meters

  • 2

    give an example of an excavator mounted attachment

    fork

  • 3

    which of the following is part of the post construction phase

    project evaluation

  • 4

    what is the main function of earthmoving equipment in construction

    to move and grade soil and rock

  • 5

    what is the tagalog term for rollers in compaction equipment

    pison

  • 6

    what equipment is used to guide and install pukes for foundation

    driver, pile vibratory hydraulic driven

  • 7

    the preliminary phase of the project development cycle. it involves recognizing the need for a construction project and defining its scope

    identification

  • 8

    identifying and signing necessary resources, such as personnel, equipment, and materials

    resource allocation

  • 9

    its the relationship between the function a building element provides and the overall cost to achieve that function. it aims to deliver the best possible outcomes for all stakeholders

    value

  • 10

    during the evaluation phase of a construction project, which of the following activities is most crucial?

    conducting a post- construction review to assess project performance and identify lessons learned

  • 11

    what soil test use to measure the amount of water presenter in the soil

    moisture content testing

  • 12

    how to determine the shallow foundations

    close to earth's surface, about 3 meters, cheaper, primary use is to transfer loads, smaller buildings, lighter loads

  • 13

    which of the following is a type of compaction equipment

    static roller

  • 14

    what type of lifting equipment is used to move materials vertically on a construction site

    tower crane

  • 15

    it is a pulley device used to guide and support cables and wires

    stringing block

  • 16

    it is a revolving drum tool that is used to completely mix mortar, concrete, and other construction materials into an even mixture

    drum mixer

  • 17

    this cycle ensures that projects are systematically and efficiently managed from start to finish

    project development cycle

  • 18

    what type of concrete is sprayed into surfaces at high velocity using a hose? it is commonly used for applications such as tunnel linings, retaining walls, and swimming pools, providing strong adhesion and quick setting properties

    shotcrete concrete

  • 19

    what is the best period of time to fully cure concrete

    28 days

  • 20

    what concrete class is often on the road, especially when only a short period is given to finish the project?

    Class 30 concrete

  • 21

    provide 1 of the examples of lifting equipments in construction

    Hoist and Tower Crane

  • 22

    it is a cornerstone concept in construction project management. it portrays the three essential constrains that influence every construction project

    Dempster's Triangle

  • 23

    in the context of a construction project, which of the following is the first step in the implementation phase

    developing detailed blueprints and project plans

  • 24

    when implementing a new features in a software allocation, which of the following steps is typically the first to be completed

    designing the features architecture and planning is integration