  • 1

    calibration and repair of instruments is an example of (partis.5.1.12)?

    appliance major repair

  • 2

    the alteration of an aircraft or aeronautical product in conformity with an approved standard

    modification

  • 3

    changes of the following type to a powerplant, or airframe when not listed in the specifications issued by the air transport office in the accordance with the manufacturer

    aircraft major alteration

  • 4

    in accordance with the table of sanction under pcar’s part 1, the penalty for ‘falsification of records or reports’

    revocation

  • 5

    simple or minor preservation operations and the replacement of small standards parts not involving complex assembly operation is known as

    preventive maintenance

  • 6

    installation of an accessory which is not approved for the engine is an example of

    powerplant major modification/alteration

  • 7

    who may perform inspection of the aircraft if it is away from the station where inspection is normally conducted

    both

  • 8

    who is responsible for ensuring that all aircraft maintenance records are kept up to date

    licensed mechanic/owner

  • 9

    when major repair alteration results in any change in the aircfraft operating limitaions or data contained in approved airplane flight

    the form and manner prescribed by the caap

  • 10

    which of the ff. is a portion of the required permanent maintenance record entry a 100 hour inspection

    the date of the inspection and aircraft time in service

  • 11

    replacing or cleaning spark plugs and setting of spark plug gap clearance is considerd as (partis 5.1.12)

    preventive maintenance

  • 12

    where would find the recomended statement for recording the approval or disapproval of an aircraft after a 100 hour or annual inspection

    14 cfr part 43

  • 13

    disassembly of a crankcase or crankshaft of a reciprocating engine equipped with an integral supercharger is an example(partis.5.1.12)

    powerplant major repair

  • 14

    any repair to spars ribs, and surface involes

    airframe minor repair techniques

  • 15

    which is considered to be typical preventive maintenance operations

    removal, installation and repair of landing gear tires

  • 16

    change to the basic design of the fuel or oil system is considered

    airframe major modification

  • 17

    what does it mean when it is said that a component conforms with the technical standard order

    it does not require an stc when used in alteration

  • 18

    when you can consider the repair on the following airframe, a major repair

    the repair of damaged areas in the plywood stressed covering (6)inches

  • 19

    modification of the basic design not made in accordance with the recomendations of the appliance manufacturer or in accordance with applicable airworthiness directives is considered as (part is 5.1.12)

    appliance major modification

  • 20

    wich of the following is not considered as powerplant major alteration

    disassembly of float type carburator

  • 21

    in order to reconstruct lost/destroyed aircraft maintenanace records, what is necessary to establish?

    total service of the airframe

  • 22

    no person, entity other than the authority may disapprove an aircraft, airframe, aircraft engine, propeller apliance, or component part for return to service after it has gone under maintenance, preventive maintenance rebuilding or modification except as provided in the ff.

    manufacturers manual

  • 23

    p-car part for mro/ amo

    pcar part 6

  • 24

    airframe , powerplant or appliance which has undergone maintenance , minor repair or manor alteration may approve and returned to the service except by one of the ff.

    an appropriate licensed aircraft mechanic

  • 25

    airframe minor repair includes

    wing and control surface fairings

  • 26

    each person performing a major repair or major modification shall forward a copy of that form to the authority in accordance with authority instructions within 48 hours after aeronautical product is approved for return to service (part is 5.7.1.1)

    48 hours

  • 27

    large airplanes and turbine powered multi engine airplanes operated under federal aviation

    in accordance with the inspection program authorized under federal aviation regulation part 91,subpart e

  • 28

    A permanent record of every maintenance (not including preventive maintenance) Repair of building or alter on any airframe, powerpplant, propeller, or appliance shall be maintained by

    registered operator

  • 29

    a special flight permit may be issued for an aircraft that may not currently meet applicable airworthiness requirements but is capable of safe flight for the purposes of (PCAR 5.4.1 11.4)

    All of the above

  • 30

    Change the basic design made in accordance with the assec of the air transportation approved recommendations of the landing gear shock strut

    appliance minor alteration

  • 31

    a document signed by an unauthorized representative of an Approved Maintenance Organization (AMO) in respect with an inspection, repair or modification on a complete aircraft, engine or propeller after it has received a maintenance performed (Part is 5.1.12)

    return to service

  • 32

    any repair to spars ribs, and surface involves

    airframe minor repair techniques

  • 33

    When can an aircraft be operated with a 100 hour inspection overdue

    if necessary to reach a place at which the inspection can be done

  • 34

    the restoration of an engine mounts to a good condition for safe operation after the damage is classified as

    an airframe major repair

  • 35

    special repair to structural engine parts by welding, plating, metalizing or methods is an example of (Parts IS 5.5.5. 12)

    powerplant major repair

  • 36

    inaccordance with the table of sanction under PCAR’s part if the penalty for “Failure to complete and sign maintenance release” is

    15 to 30 days suspension

  • 37

    a maximum time a 100 hour inspection may be extended is

    10 hrs

  • 38

    require owner shall retain maintenance and inspection records for minimum periods of

    90 days

  • 39

    replacement of components or complete units such as landing gears which parts supplied by the original manufacturer or manufactured in accordance with approved drawing inconsidered

    airframe minor repair

  • 40

    replacing defective safety wiring or cotter pins is

    preventive maintenance

  • 41

    an example of powerplant major repairs

    all of the above

  • 42

    where would you find the operating conditions that make 100 hour inspection madatory

    14 CFR Part 91

  • 43

    strengthening or reinforcing the fuselage longeron

    airframe major repair

  • 44

    conversions of any sort for the purpose of using fuel rating or grade other than listed in the engine specifications (Part IS 5.1.1.2)

    Powerplant major modification

  • 45

    any maintenance operation requiring of the cold and hot sections

    powerplant major repair

  • 46

    special repairs to structural engine parts by welding, plating, metalizing or other methods is an example of (Part IS 5.1.1.12)

    powerplant major repair

  • 47

    in accordance with table of sanction under PCAR’s part 1, the penalty for “Improperly releasing an aircraft to service” is

    30 to 60 days suspension

  • 48

    which is considered to be typical preventive maintenance operations (Part IS 5.1.12)

    Removal installation repair of landing gears